blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1467525

EP1467525 - A METHOD OF CONTROLLING FLOW OF THE ETHERNET DATA IN A SYNCHRONOUS DATA HIERARCHY TRANSMISSION NETWORK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.07.2009
Database last updated on 13.11.2024
Most recent event   Tooltip30.09.2011Lapse of the patent in a contracting state
New state(s): CY, TR
published on 02.11.2011  [2011/44]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Service Centre Building
Kefa Road
Science-Based Industrial Park
Nanshan District
Shenzhen, Guangdong 518057 / CN
[N/P]
Former [2008/35]For all designated states
Huawei Technologies Co., Ltd.
Huawei Service Centre Bldg Kefa Road, Science-Based Industrial Park, Nanshan District
Guangdong, Shenzhen 518057 / CN
Former [2004/42]For all designated states
Huawei Technologies Co., Ltd.
Huawei Service Centre Bldg Kefa Road, Science-Based Industrial Park, Nanshan District
Guangdong, Shenzhen 518057 / CN
Inventor(s)01 / TANG, Yong, Huawei service centre building
Kefa Rd., Sce.-Based Ind. Park, Nanshan Dist.
Shenzhen, Guangdong 518057 / CN
02 / HE, Jianfei, Huawei service centre building
Kefa Rd., Sce.-Based Ind. Park, Nanshan District
Shenzhen, Guangdong 518057 / CN
 [2004/42]
Representative(s)Mounteney, Simon James, et al
Marks & Clerk LLP
15 Fetter Lane
London EC4A 1BW / GB
[N/P]
Former [2004/42]Mounteney, Simon James, et al
MARKS & CLERK, 57-60 Lincoln's Inn Fields
London WC2A 3LS / GB
Application number, filing date02727180.830.05.2002
[2004/42]
WO2002CN00370
Priority number, dateCN2001104309919.12.2001         Original published format: CN 01143099
[2004/42]
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO03053009
Date:26.06.2003
Language:EN
[2003/26]
Type: A1 Application with search report 
No.:EP1467525
Date:13.10.2004
Language:EN
The application published by WIPO in one of the EPO official languages on 26.06.2003 takes the place of the publication of the European patent application.
[2004/42]
Type: B1 Patent specification 
No.:EP1467525
Date:27.08.2008
Language:EN
[2008/35]
Search report(s)International search report - published on:CN26.06.2003
(Supplementary) European search report - dispatched on:EP16.09.2005
ClassificationIPC:H04L12/56
[2004/42]
CPC:
H04L47/29 (EP,US); H04L12/43 (KR); H04L47/10 (EP,KR,US);
H04L47/266 (EP,US); H04L47/30 (EP,US); H04J2203/0085 (EP,US)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   TR [2004/42]
Extension statesALNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
RONot yet paid
SINot yet paid
TitleGerman:VERFAHREN ZUR STEUERUNG DES FLUSSES DER ETHERNET-DATEN IN EINEM SYNCHRONEN ÜBERTRAGUNGSNETZ MIT DATENHIERARCHIE[2004/42]
English:A METHOD OF CONTROLLING FLOW OF THE ETHERNET DATA IN A SYNCHRONOUS DATA HIERARCHY TRANSMISSION NETWORK[2004/42]
French:PROCEDE DE COMMANDE DU FLUX DES DONNEES ETHERNET DANS UN RESEAU DE TRANSMISSION HIERARCHIQUE DE DONNEES SYNCHRONE[2004/42]
Entry into regional phase15.07.2004Translation filed 
14.07.2004National basic fee paid 
14.07.2004Search fee paid 
14.07.2004Designation fee(s) paid 
14.07.2004Examination fee paid 
Examination procedure15.07.2004Amendment by applicant (claims and/or description)
15.07.2004Examination requested  [2004/42]
15.12.2005Despatch of a communication from the examining division (Time limit: M06)
28.07.2006Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
07.09.2006Reply to a communication from the examining division
16.01.2007Despatch of a communication from the examining division (Time limit: M06)
13.07.2007Reply to a communication from the examining division
08.01.2008Cancellation of oral proceeding that was planned for 01.02.2008
08.01.2008Minutes of oral proceedings despatched
01.02.2008Date of oral proceedings
01.02.2008Date of oral proceedings (cancelled)
04.03.2008Communication of intention to grant the patent
11.07.2008Fee for grant paid
11.07.2008Fee for publishing/printing paid
Opposition(s)28.05.2009No opposition filed within time limit [2009/32]
Request for further processing for:07.09.2006Request for further processing filed
07.09.2006Full payment received (date of receipt of payment)
Request granted
09.10.2006Decision despatched
Fees paidRenewal fee
14.07.2004Renewal fee patent year 03
12.05.2005Renewal fee patent year 04
10.05.2006Renewal fee patent year 05
14.05.2007Renewal fee patent year 06
28.03.2008Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT27.08.2008
BE27.08.2008
CY27.08.2008
DK27.08.2008
FI27.08.2008
IT27.08.2008
NL27.08.2008
TR27.08.2008
SE27.11.2008
GR28.11.2008
ES08.12.2008
PT27.01.2009
[2011/43]
Former [2010/47]AT27.08.2008
BE27.08.2008
DK27.08.2008
FI27.08.2008
IT27.08.2008
NL27.08.2008
SE27.11.2008
GR28.11.2008
ES08.12.2008
PT27.01.2009
Former [2010/09]AT27.08.2008
BE27.08.2008
DK27.08.2008
FI27.08.2008
IT27.08.2008
NL27.08.2008
SE27.11.2008
ES08.12.2008
PT27.01.2009
Former [2009/39]AT27.08.2008
BE27.08.2008
DK27.08.2008
FI27.08.2008
IT27.08.2008
NL27.08.2008
ES08.12.2008
PT27.01.2009
Former [2009/25]AT27.08.2008
BE27.08.2008
DK27.08.2008
FI27.08.2008
NL27.08.2008
ES08.12.2008
PT27.01.2009
Former [2009/19]AT27.08.2008
BE27.08.2008
DK27.08.2008
FI27.08.2008
NL27.08.2008
ES08.12.2008
Former [2009/15]AT27.08.2008
FI27.08.2008
NL27.08.2008
ES08.12.2008
Former [2009/12]FI27.08.2008
NL27.08.2008
ES08.12.2008
Former [2009/09]NL27.08.2008
ES08.12.2008
Documents cited:Search[XY]WO0000899  (SUN MICROSYSTEMS INC [US], et al) [X] 1,2,4,6 * page 6, line 5 - line 27; figure 4A * * page 16, line 4 - line 11 * [Y] 6;
 [A]EP1006751  (NORTEL NETWORKS CORP [CA]) [A] 1 * column 2, line 49 - column 3, line 44; figure 1 ** column 14, line 43 - column 16, line 2; figure 6 *;
 [XAY]US6192422  (DAINES BERNARD NELSON [US], et al) [X] 1,2,4 * column 1, line 14 - line 19 * * column 2, line 41 - line 49 * * column 4, line 4 - line 16 * * column 5, line 6 - line 8; figure 2 * * column 6, line 66 - column 7, line 53; figures 5,6 * * claim 10 * [A] 5 [Y] 3,6;
 [YA]GB2360666  (3COM CORP [US]) [Y] 3,6 * page 1, line 5 - line 16 * * page 3, line 3 * * page 4, column 21 - column 24 * * page 7, line 20 - page 9, line 2; figure 4 * [A] 1,2,5
International search[A]US5581566  (ST JOHN WALLACE B [US], et al);
 [A]WO9641455  (ADVANCED MICRO DEVICES INC [US]);
 [A]EP1006751  (NORTEL NETWORKS CORP [CA])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.