| EP1429917 - CERAMIC MATRIX COMPOSITE STRUCTURE HAVING INTEGRAL COOLING PASSAGES AND METHOD OF MANUFACTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.11.2008 Database last updated on 28.03.2026 | Most recent event Tooltip | 13.11.2008 | No opposition filed within time limit | published on 10.12.2008 [2008/50] | Applicant(s) | For all designated states Siemens Power Generation, Inc. 4400 Alafaya Trail Orlando FL 32826-2399 / US | [2007/37] |
| Former [2004/26] | For all designated states Siemens Westinghouse Power Corporation 4400 Alafaya Trail Orlando, FL 32828-2399 / US | Inventor(s) | 01 /
MORRISON, Jay 2423 Turnberry Drive Oviedo, FL 32765 / US | 02 /
BUTNER, Steven, C. 687 Bird Court San Marcos, CA 92069 / US | 03 /
CAMPBELL, Christian, X. 476 Canary Island Court Orlando, FL 32828 / US | 04 /
ALBRECHT, Harry, A. 9036 S.E. Mars Street Hobe Sound, FL 33456 / US | 05 /
SHTEYMAN, Yevgeuiy 5600 N. Flagler Drive West Palm Beach, FL 33407 / US | [2004/44] |
| Former [2004/26] | 01 /
MORRISON, Jay 2423 Turnberry Drive Oviedo, FL 32765 / US | ||
| 02 /
BUTNER, Steven, C. 13460 Pequot Drive Poway, CA 92064 / US | |||
| 03 /
CAMPBELL, Christian, X. 476 Canary Island Court Orlando, FL 32828 / US | |||
| 04 /
ALBRECHT, Harry, A. 9036 S.E. Mars Street Hobe Sound, FL 33456 / US | |||
| 05 /
SHTEYMAN, Yevgeuiy 5600 N. Flagler Drive West Palm Beach, FL 33407 / US | Representative(s) | French, Clive Harry Siemens AG Postfach 22 16 34 80506 München / DE | [N/P] |
| Former [2004/34] | French, Clive Harry Siemens AG, PO Box 22 16 34 80506 München / DE | Application number, filing date | 02773404.5 | 17.09.2002 | [2004/26] | WO2002US29344 | Priority number, date | US20010962733 | 24.09.2001 Original published format: US 962733 | [2004/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO03026887 | Date: | 03.04.2003 | Language: | EN | [2003/14] | Type: | A2 Application without search report | No.: | EP1429917 | Date: | 23.06.2004 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.04.2003 takes the place of the publication of the European patent application. | [2004/26] | Type: | B1 Patent specification | No.: | EP1429917 | Date: | 02.01.2008 | Language: | EN | [2008/01] | Search report(s) | International search report - published on: | EP | 14.08.2003 | Classification | IPC: | B32B18/00 | [2004/26] | CPC: |
B32B18/00 (EP,KR,US);
B32B3/18 (EP,US);
C04B35/117 (EP);
C04B35/18 (EP);
C04B35/185 (EP);
C04B35/565 (EP);
C04B35/584 (EP);
C04B35/645 (EP,US);
C04B35/80 (EP,US);
C04B38/0003 (EP,US);
F01D5/187 (EP,US);
F01D5/282 (EP,US);
B32B2315/02 (EP,US);
C04B2111/00612 (EP,US);
C04B2235/5224 (EP);
C04B2235/5228 (EP);
C04B2235/5244 (EP);
C04B2235/6028 (EP);
C04B2235/6581 (EP,US);
C04B2237/341 (EP,US);
C04B2237/343 (EP,US);
C04B2237/365 (EP,US);
C04B2237/368 (EP,US);
C04B2237/38 (EP,US);
C04B2237/56 (EP,US);
C04B2237/62 (EP,US);
C04B2237/66 (EP,US);
C04B2237/704 (EP,US);
C04B2237/76 (EP,US);
Y10T428/24562 (EP,US);
| C-Set: |
C04B38/0003, C04B35/80, C04B38/0645 (EP,US)
| Designated contracting states | DE, FR, GB, IT [2008/01] |
| Former [2004/26] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, IE, IT, LI, LU, MC, NL, PT, SE, SK, TR | Title | German: | KERAMIKMATRIX-VERBUNDSTRUKTUR MIT INTEGRIERTEM KÜHLKANAL UND HERSTELLUNGSVERFAHREN | [2004/26] | English: | CERAMIC MATRIX COMPOSITE STRUCTURE HAVING INTEGRAL COOLING PASSAGES AND METHOD OF MANUFACTURE | [2004/26] | French: | STRUCTURE COMPOSITE A MATRICE CERAMIQUE COMPORTANT DES CONDUITS DE REFROIDISSEMENT A PASSAGE INTEGRAL ET PROCEDE DE FABRICATION | [2004/26] | Entry into regional phase | 11.02.2004 | National basic fee paid | 11.02.2004 | Designation fee(s) paid | 11.02.2004 | Examination fee paid | Examination procedure | 17.04.2003 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 11.02.2004 | Examination requested [2004/29] | 29.07.2004 | Despatch of a communication from the examining division (Time limit: M04) | 08.12.2004 | Reply to a communication from the examining division | 24.07.2007 | Communication of intention to grant the patent | 21.11.2007 | Fee for grant paid | 21.11.2007 | Fee for publishing/printing paid | Opposition(s) | 03.10.2008 | No opposition filed within time limit [2008/50] | Fees paid | Renewal fee | 11.02.2004 | Renewal fee patent year 03 | 14.09.2005 | Renewal fee patent year 04 | 11.09.2006 | Renewal fee patent year 05 | 19.09.2007 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | |||