blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1458910

EP1458910 - COMPOSITE YARN, METHOD FOR OBTAINING SAME AND RESULTING TEXTILE STRUCTURE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.06.2008
Database last updated on 20.12.2024
Most recent event   Tooltip14.08.2009Lapse of the patent in a contracting state
New state(s): LU
published on 16.09.2009  [2009/38]
Applicant(s)For all designated states
Chavanoz Industrie
38230 Chavanoz / FR
[2004/39]
Inventor(s)01 / CONESA, Isabelle
2, chemin Vie des Anes, Barens
38460 Saint Romain de Jalionas / FR
02 / BERGE, Philippe
20, allée des Dombes
F-69330 Jonage / FR
03 / POLLET, Laurence
12, rue de la Monnaie
F-69002 Lyon / FR
 [2004/39]
Representative(s)Schouller, Jean-Philippe, et al
Cabinet Lavoix
62, Rue de Bonnel
69448 Lyon Cedex 03 / FR
[N/P]
Former [2008/02]Schouller, Jean-Philippe, et al
Cabinet Lavoix, 62 rue de Bonnel
69448 Lyon Cedex 03 / FR
Former [2004/39]Guerre, Dominique, et al
Cabinet Germain et Maureau, BP 6153
69466 Lyon Cedex 06 / FR
Application number, filing date02799125.627.12.2002
[2004/39]
WO2002FR04577
Priority number, dateFR2001001704728.12.2001         Original published format: FR 0117047
[2004/39]
Filing languageFR
Procedural languageFR
PublicationType: A2 Application without search report
No.:WO03056082
Date:10.07.2003
Language:FR
[2003/28]
Type: A2 Application without search report 
No.:EP1458910
Date:22.09.2004
Language:FR
The application published by WIPO in one of the EPO official languages on 10.07.2003 takes the place of the publication of the European patent application.
[2004/39]
Type: B1 Patent specification 
No.:EP1458910
Date:08.08.2007
Language:FR
[2007/32]
Search report(s)International search report - published on:EP22.01.2004
ClassificationIPC:D02G3/44
[2004/39]
CPC:
D02G3/404 (EP,US); D02G3/36 (KR); D02G3/40 (KR);
D02G3/44 (EP,KR,US); Y10T428/2913 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   SI,   SK,   TR [2004/39]
Extension statesAL30.06.2004
LT30.06.2004
LV30.06.2004
MK30.06.2004
RO30.06.2004
TitleGerman:VERBUNDGARN, VERFAHREN ZUR HERSTELLUNG UND DARAUS HERGESTELLTE TEXTILE FLÄCHENGEBILDE[2004/39]
English:COMPOSITE YARN, METHOD FOR OBTAINING SAME AND RESULTING TEXTILE STRUCTURE[2004/39]
French:FIL COMPOSITE, PROCEDE D OBTENTION ET STRUCTURE TEXTIL E OBTENUE[2004/39]
Entry into regional phase30.06.2004National basic fee paid 
30.06.2004Designation fee(s) paid 
30.06.2004Examination fee paid 
Examination procedure02.06.2003Request for preliminary examination filed
International Preliminary Examining Authority: EP
30.06.2004Examination requested  [2004/39]
02.05.2005Despatch of a communication from the examining division (Time limit: M04)
12.09.2005Reply to a communication from the examining division
17.03.2006Communication of intention to grant the patent
11.07.2006Fee for grant paid
11.07.2006Fee for publishing/printing paid
Opposition(s)09.05.2008No opposition filed within time limit [2008/29]
Fees paidRenewal fee
24.12.2004Renewal fee patent year 03
27.12.2005Renewal fee patent year 04
27.12.2006Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY08.08.2007
EE08.08.2007
FI08.08.2007
SI08.08.2007
BG08.11.2007
GR09.11.2007
LU27.12.2007
MC31.12.2007
PT08.01.2008
[2009/38]
Former [2009/34]CY08.08.2007
EE08.08.2007
FI08.08.2007
SI08.08.2007
BG08.11.2007
GR09.11.2007
MC31.12.2007
PT08.01.2008
Former [2009/29]EE08.08.2007
FI08.08.2007
SI08.08.2007
BG08.11.2007
GR09.11.2007
MC31.12.2007
PT08.01.2008
Former [2009/10]EE08.08.2007
FI08.08.2007
BG08.11.2007
GR09.11.2007
MC31.12.2007
PT08.01.2008
Former [2008/33]FI08.08.2007
BG08.11.2007
GR09.11.2007
MC31.12.2007
PT08.01.2008
Former [2008/26]FI08.08.2007
BG08.11.2007
GR09.11.2007
PT08.01.2008
Former [2008/22]FI08.08.2007
BG08.11.2007
GR09.11.2007
Former [2008/10]FI08.08.2007
BG08.11.2007
Former [2008/09]BG08.11.2007
Cited inInternational search[X]US2224274  (POWERS MILTON A) [X] 1,4 * claims 2,5 *;
 [XA]US3508990  (MARZOCCHI ALFRED) [X] 1,4-6,8 * column 6, line 40 - line 58; claims 1,3 * [A] 10;
 [A]US4159618  (SOKARIS JERRY G) [A] 2-4,7,10-14 * claims 1,2,7 *;
 [A]JPS6028529  (NIPPON CARBIDE KOGYO KK) [A] 2-6,9,14* abstract *;
 [A]US6032454  (DAMOUR FRANCOIS XAVIER [FR], et al) [A] 2-6,9,14 * claims 1,16-19 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.