EP1442775 - Gantry crane toy [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.09.2009 Database last updated on 02.11.2024 | Most recent event Tooltip | 29.10.2010 | Lapse of the patent in a contracting state New state(s): GR | published on 01.12.2010 [2010/48] | Applicant(s) | For all designated states Bruder Spielwaren GmbH + Co. KG Bernbacher Strasse 94-98 90768 Fürth / DE | [2008/44] |
Former [2004/32] | For all designated states Bruder Spielwaren GmbH + Co. KG Bernbacher Strasse 94-98 90768 Fürth / DE | Inventor(s) | 01 /
Bruder, Paul Heinz, Dipl.-Ing. (FH) Hummelstrasse 77 90768 Fürth / DE | [2004/32] | Representative(s) | Schneck, Herbert, et al Rau, Schneck & Hübner Patentanwälte Königstrasse 2 90402 Nürnberg / DE | [N/P] |
Former [2004/32] | Schneck, Herbert, Dipl.-Phys., Dr., et al Rau, Schneck & Hübner Patentanwälte Königstrasse 2 90402 Nürnberg / DE | Application number, filing date | 03028405.3 | 11.12.2003 | [2004/32] | Priority number, date | DE2003201384U | 29.01.2003 Original published format: DE 20301384 U | [2004/32] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP1442775 | Date: | 04.08.2004 | Language: | DE | [2004/32] | Type: | B1 Patent specification | No.: | EP1442775 | Date: | 29.10.2008 | Language: | DE | [2008/44] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 01.04.2004 | Classification | IPC: | A63H17/12, A63H31/02, A63G9/02, A63G9/04, A63G9/12, A63G9/16 | [2004/32] | CPC: |
A63H17/12 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PT, RO, SE, SI, SK, TR [2004/32] | Title | German: | Spielzeug-Portalkran | [2004/32] | English: | Gantry crane toy | [2004/32] | French: | Jouet grue à portique | [2004/32] | Examination procedure | 02.06.2004 | Examination requested [2004/32] | 19.11.2007 | Despatch of a communication from the examining division (Time limit: M04) | 25.01.2008 | Reply to a communication from the examining division | 23.05.2008 | Communication of intention to grant the patent | 05.09.2008 | Fee for grant paid | 05.09.2008 | Fee for publishing/printing paid | Opposition(s) | 30.07.2009 | No opposition filed within time limit [2009/41] | Fees paid | Renewal fee | 21.12.2005 | Renewal fee patent year 03 | 21.12.2006 | Renewal fee patent year 04 | 18.12.2007 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 29.10.2008 | CZ | 29.10.2008 | DK | 29.10.2008 | EE | 29.10.2008 | FI | 29.10.2008 | IE | 29.10.2008 | IT | 29.10.2008 | RO | 29.10.2008 | SI | 29.10.2008 | SK | 29.10.2008 | TR | 29.10.2008 | AT | 11.12.2008 | LU | 11.12.2008 | CH | 31.12.2008 | LI | 31.12.2008 | MC | 31.12.2008 | BG | 29.01.2009 | SE | 29.01.2009 | GR | 30.01.2009 | ES | 09.02.2009 | PT | 30.03.2009 | HU | 30.04.2009 | [2010/48] |
Former [2010/37] | CY | 29.10.2008 | |
CZ | 29.10.2008 | ||
DK | 29.10.2008 | ||
EE | 29.10.2008 | ||
FI | 29.10.2008 | ||
IE | 29.10.2008 | ||
IT | 29.10.2008 | ||
RO | 29.10.2008 | ||
SI | 29.10.2008 | ||
SK | 29.10.2008 | ||
TR | 29.10.2008 | ||
AT | 11.12.2008 | ||
LU | 11.12.2008 | ||
CH | 31.12.2008 | ||
LI | 31.12.2008 | ||
MC | 31.12.2008 | ||
BG | 29.01.2009 | ||
SE | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
HU | 30.04.2009 | ||
Former [2010/34] | CY | 29.10.2008 | |
CZ | 29.10.2008 | ||
DK | 29.10.2008 | ||
EE | 29.10.2008 | ||
FI | 29.10.2008 | ||
IE | 29.10.2008 | ||
IT | 29.10.2008 | ||
RO | 29.10.2008 | ||
SI | 29.10.2008 | ||
SK | 29.10.2008 | ||
AT | 11.12.2008 | ||
LU | 11.12.2008 | ||
CH | 31.12.2008 | ||
LI | 31.12.2008 | ||
MC | 31.12.2008 | ||
BG | 29.01.2009 | ||
SE | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
HU | 30.04.2009 | ||
Former [2010/32] | CZ | 29.10.2008 | |
DK | 29.10.2008 | ||
EE | 29.10.2008 | ||
FI | 29.10.2008 | ||
IE | 29.10.2008 | ||
IT | 29.10.2008 | ||
RO | 29.10.2008 | ||
SI | 29.10.2008 | ||
SK | 29.10.2008 | ||
AT | 11.12.2008 | ||
LU | 11.12.2008 | ||
CH | 31.12.2008 | ||
LI | 31.12.2008 | ||
MC | 31.12.2008 | ||
BG | 29.01.2009 | ||
SE | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
Former [2010/30] | CZ | 29.10.2008 | |
DK | 29.10.2008 | ||
EE | 29.10.2008 | ||
FI | 29.10.2008 | ||
IE | 29.10.2008 | ||
IT | 29.10.2008 | ||
RO | 29.10.2008 | ||
SI | 29.10.2008 | ||
SK | 29.10.2008 | ||
AT | 11.12.2008 | ||
CH | 31.12.2008 | ||
LI | 31.12.2008 | ||
MC | 31.12.2008 | ||
BG | 29.01.2009 | ||
SE | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
Former [2009/47] | CZ | 29.10.2008 | |
DK | 29.10.2008 | ||
EE | 29.10.2008 | ||
FI | 29.10.2008 | ||
IE | 29.10.2008 | ||
IT | 29.10.2008 | ||
RO | 29.10.2008 | ||
SI | 29.10.2008 | ||
SK | 29.10.2008 | ||
CH | 31.12.2008 | ||
LI | 31.12.2008 | ||
MC | 31.12.2008 | ||
BG | 29.01.2009 | ||
SE | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
Former [2009/43] | CZ | 29.10.2008 | |
DK | 29.10.2008 | ||
EE | 29.10.2008 | ||
FI | 29.10.2008 | ||
IE | 29.10.2008 | ||
IT | 29.10.2008 | ||
RO | 29.10.2008 | ||
SI | 29.10.2008 | ||
SK | 29.10.2008 | ||
MC | 31.12.2008 | ||
BG | 29.01.2009 | ||
SE | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
Former [2009/39] | CZ | 29.10.2008 | |
DK | 29.10.2008 | ||
EE | 29.10.2008 | ||
FI | 29.10.2008 | ||
IE | 29.10.2008 | ||
IT | 29.10.2008 | ||
RO | 29.10.2008 | ||
SI | 29.10.2008 | ||
MC | 31.12.2008 | ||
BG | 29.01.2009 | ||
SE | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
Former [2009/38] | DK | 29.10.2008 | |
EE | 29.10.2008 | ||
FI | 29.10.2008 | ||
IE | 29.10.2008 | ||
RO | 29.10.2008 | ||
SI | 29.10.2008 | ||
MC | 31.12.2008 | ||
BG | 29.01.2009 | ||
SE | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
Former [2009/36] | DK | 29.10.2008 | |
EE | 29.10.2008 | ||
FI | 29.10.2008 | ||
IE | 29.10.2008 | ||
RO | 29.10.2008 | ||
SI | 29.10.2008 | ||
MC | 31.12.2008 | ||
BG | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
Former [2009/34] | DK | 29.10.2008 | |
FI | 29.10.2008 | ||
IE | 29.10.2008 | ||
SI | 29.10.2008 | ||
MC | 31.12.2008 | ||
BG | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
Former [2009/25] | FI | 29.10.2008 | |
SI | 29.10.2008 | ||
BG | 29.01.2009 | ||
ES | 09.02.2009 | ||
PT | 30.03.2009 | ||
Former [2009/23] | BG | 29.01.2009 | |
ES | 09.02.2009 | ||
Former [2009/20] | ES | 09.02.2009 | Documents cited: | Search | [A]US1745276 (SHERWOOD GLENN L) [A] 1-11 * figures 1,4 *; | [A]US2567083 (STICKLE FRED H) [A] 10,11 * column 1, line 47 - column 3, line 46; figures 1,2,4,6 *; | [A]US2818289 (ISADORE HOROWITZ) [A] 4-6* column 2, lines 3-72; figures 1-8 *; | [Y]DE1203651 (HANS BILLER) [Y] 1-3,7-11 * column 3, lines 37-66; figures 1-3 *; | [Y]US4190248 (PHILIPPI GEORGE J [US]) [Y] 1-3,7-11 * the whole document * | Examination | CH275559 |