blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1348867

EP1348867 - Offshore wind-power plant as well as construction and erection method for such a plant [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.08.2005
Database last updated on 24.08.2024
Most recent event   Tooltip05.08.2005No opposition filed within time limitpublished on 21.09.2005  [2005/38]
Applicant(s)For all designated states
DORIS ENGINEERING
58 A, rue du Dessous des Berges
75013 Paris / FR
[N/P]
Former [2003/40]For all designated states
DORIS ENGINEERING
58 A, Rue du Dessous des Berges
F-75013 Paris / FR
Inventor(s)01 / Foglia, Vincent Frédéric Paul
11 Bis Avenue de la Croix Blanche
93600 Aulnay sous Bois / FR
02 / Deleuil, Georges
16 Rue de Vouillé
75015 Paris / FR
03 / Michel, Dominique
42 Rue d'Artois
75008 Paris / FR
 [2003/40]
Representative(s)Colas, Jean-Pierre
Cabinet Lavoix
2, Place d'Estienne d'Orves
75441 Paris Cedex 09 / FR
[N/P]
Former [2003/40]Colas, Jean-Pierre
Cabinet JP Colas 37, avenue Franklin D. Roosevelt
75008 Paris / FR
Application number, filing date03290708.120.03.2003
[2003/40]
Priority number, dateFR2002000362222.03.2002         Original published format: FR 0203622
[2003/40]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP1348867
Date:01.10.2003
Language:FR
[2003/40]
Type: B1 Patent specification 
No.:EP1348867
Date:29.09.2004
Language:FR
[2004/40]
Search report(s)(Supplementary) European search report - dispatched on:EP02.06.2003
ClassificationIPC:F03D11/04, B63B21/50
[2003/40]
CPC:
B63B21/502 (EP); B63B35/44 (EP); B63B77/10 (EP);
B66C23/185 (EP); F03D13/10 (EP); F03D13/22 (EP);
F03D13/25 (EP); F03D13/40 (EP); B63B2021/505 (EP);
B63B2035/446 (EP); E02B2017/0091 (EP); F05B2240/93 (EP);
F05B2240/95 (EP); Y02E10/72 (EP); Y02E10/727 (EP) (-)
Designated contracting statesES,   FR,   GB,   GR,   IT,   PT [2004/26]
Former [2003/40]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Offshore-Windenergiekraftwerk, sowie Verfahren zum Aufbau und Errichtung dieses Kraftwerks[2003/40]
English:Offshore wind-power plant as well as construction and erection method for such a plant[2003/40]
French:Installation de production éolienne d'électricité en mer, ainsi que procédé de construction et de mise en place d'une telle installation[2003/40]
Examination procedure03.03.2004Examination requested  [2004/19]
13.04.2004Communication of intention to grant the patent
22.07.2004Fee for grant paid
22.07.2004Fee for publishing/printing paid
Opposition(s)30.06.2005No opposition filed within time limit [2005/38]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]FR2507146  (TIM TECH IND MINIERES [FR]) [A] 1-9 * figure 8 *;
 [A]EP1174336  (MAIERFORM MARITIME TECHNOLOGY [DE]) [A] 1-9 * figure - *;
 [A]WO0210589  (HANNEVIG CHRISTOFFER [IE], et al) [A] 1-9* figure - *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.