EP1432184 - Apparatus for determining communication paths in a label switching communication network having selection parameters [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.02.2013 Database last updated on 16.11.2024 | Most recent event Tooltip | 18.07.2014 | Lapse of the patent in a contracting state New state(s): HU | published on 20.08.2014 [2014/34] | Applicant(s) | For all designated states Alcatel Lucent 3, avenue Octave Gréard 75007 Paris / FR | [2012/16] |
Former [2012/08] | For all designated states Alcatel Lucent 3 avenue Octave Gréard 75007 Paris / FR | ||
Former [2007/14] | For all designated states Alcatel Lucent 54 rue La Boétie 75008 Paris / FR | ||
Former [2004/26] | For all designated states ALCATEL 54, rue La Boétie 75008 Paris / FR | Inventor(s) | 01 /
Randriamasy, Claire-Sabine 68 rue de la République 92190 Meudon / FR | 02 /
El Mghazli, Yacine 65 avenue Lénine 94110 Arcueil / FR | [2004/26] | Representative(s) | Sciaux, Edmond, et al Alcatel-Lucent International 148/152 route de la Reine 92100 Boulogne-Billancourt / FR | [N/P] |
Former [2012/10] | Sciaux, Edmond, et al Alcatel-Lucent International 32, avenue Kléber 92700 Colombes / FR | ||
Former [2004/26] | Sciaux, Edmond, et al Compagnie Financière Alcatel Département de Propriété Industrielle, 5, rue Noel Pons 92734 Nanterre Cedex / FR | Application number, filing date | 03292852.5 | 17.11.2003 | [2004/26] | Priority number, date | FR20020015966 | 17.12.2002 Original published format: FR 0215966 | [2004/26] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP1432184 | Date: | 23.06.2004 | Language: | FR | [2004/26] | Type: | B1 Patent specification | No.: | EP1432184 | Date: | 18.04.2012 | Language: | FR | [2012/16] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.02.2004 | Classification | IPC: | H04L12/56 | [2004/26] | CPC: |
H04L45/50 (EP,US);
H04L45/12 (EP,US);
H04L45/124 (EP,US);
H04L45/302 (EP,US);
H04L45/56 (EP,US);
H04L45/60 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PT, RO, SE, SI, SK, TR [2004/26] | Title | German: | Vorrichtung zur Ermittlung eines Nachrichtenpfades in einem etikettvermittelndem Kommunikationsnetzwerk mit vorhandenen Auswahlattributen | [2004/26] | English: | Apparatus for determining communication paths in a label switching communication network having selection parameters | [2004/26] | French: | Dispositif de détermination de chemins de communication dans un réseau de communications à commutation d'étiquettes, en présence d'attributs de sélection | [2004/26] | Examination procedure | 23.12.2004 | Examination requested [2005/08] | 18.03.2005 | Despatch of a communication from the examining division (Time limit: M02) | 13.06.2005 | Reply to a communication from the examining division | 28.10.2010 | Despatch of a communication from the examining division (Time limit: M04) | 27.12.2010 | Reply to a communication from the examining division | 24.10.2011 | Despatch of a communication from the examining division (Time limit: M02) | 21.11.2011 | Reply to a communication from the examining division | 28.12.2011 | Communication of intention to grant the patent | 08.03.2012 | Fee for grant paid | 08.03.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.03.2005 | Opposition(s) | 21.01.2013 | No opposition filed within time limit [2013/13] | Request for further processing for: | 13.06.2005 | Request for further processing filed | 13.06.2005 | Full payment received (date of receipt of payment) Request granted | 01.07.2005 | Decision despatched | Fees paid | Renewal fee | 14.11.2005 | Renewal fee patent year 03 | 13.11.2006 | Renewal fee patent year 04 | 16.11.2007 | Renewal fee patent year 05 | 17.11.2008 | Renewal fee patent year 06 | 24.11.2009 | Renewal fee patent year 07 | 23.11.2010 | Renewal fee patent year 08 | 23.11.2011 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.11.2003 | AT | 18.04.2012 | CY | 18.04.2012 | CZ | 18.04.2012 | DK | 18.04.2012 | EE | 18.04.2012 | FI | 18.04.2012 | IT | 18.04.2012 | NL | 18.04.2012 | RO | 18.04.2012 | SE | 18.04.2012 | SI | 18.04.2012 | SK | 18.04.2012 | TR | 18.04.2012 | BG | 18.07.2012 | GR | 19.07.2012 | ES | 29.07.2012 | PT | 20.08.2012 | IE | 17.11.2012 | LU | 17.11.2012 | BE | 30.11.2012 | CH | 30.11.2012 | LI | 30.11.2012 | MC | 30.11.2012 | [2014/34] |
Former [2014/27] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
CZ | 18.04.2012 | ||
DK | 18.04.2012 | ||
EE | 18.04.2012 | ||
FI | 18.04.2012 | ||
IT | 18.04.2012 | ||
NL | 18.04.2012 | ||
RO | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
SK | 18.04.2012 | ||
TR | 18.04.2012 | ||
BG | 18.07.2012 | ||
GR | 19.07.2012 | ||
ES | 29.07.2012 | ||
PT | 20.08.2012 | ||
IE | 17.11.2012 | ||
LU | 17.11.2012 | ||
BE | 30.11.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
MC | 30.11.2012 | ||
Former [2014/21] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
CZ | 18.04.2012 | ||
DK | 18.04.2012 | ||
EE | 18.04.2012 | ||
FI | 18.04.2012 | ||
IT | 18.04.2012 | ||
NL | 18.04.2012 | ||
RO | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
SK | 18.04.2012 | ||
TR | 18.04.2012 | ||
BG | 18.07.2012 | ||
GR | 19.07.2012 | ||
ES | 29.07.2012 | ||
PT | 20.08.2012 | ||
IE | 17.11.2012 | ||
BE | 30.11.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
MC | 30.11.2012 | ||
Former [2013/47] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
CZ | 18.04.2012 | ||
DK | 18.04.2012 | ||
EE | 18.04.2012 | ||
FI | 18.04.2012 | ||
IT | 18.04.2012 | ||
NL | 18.04.2012 | ||
RO | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
SK | 18.04.2012 | ||
BG | 18.07.2012 | ||
GR | 19.07.2012 | ||
ES | 29.07.2012 | ||
PT | 20.08.2012 | ||
IE | 17.11.2012 | ||
BE | 30.11.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
Former [2013/38] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
CZ | 18.04.2012 | ||
DK | 18.04.2012 | ||
EE | 18.04.2012 | ||
FI | 18.04.2012 | ||
IT | 18.04.2012 | ||
NL | 18.04.2012 | ||
RO | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
SK | 18.04.2012 | ||
BG | 18.07.2012 | ||
GR | 19.07.2012 | ||
ES | 29.07.2012 | ||
PT | 20.08.2012 | ||
BE | 30.11.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
Former [2013/34] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
CZ | 18.04.2012 | ||
DK | 18.04.2012 | ||
EE | 18.04.2012 | ||
FI | 18.04.2012 | ||
IT | 18.04.2012 | ||
NL | 18.04.2012 | ||
RO | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
SK | 18.04.2012 | ||
BG | 18.07.2012 | ||
GR | 19.07.2012 | ||
ES | 29.07.2012 | ||
PT | 20.08.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
Former [2013/33] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
CZ | 18.04.2012 | ||
DK | 18.04.2012 | ||
EE | 18.04.2012 | ||
FI | 18.04.2012 | ||
IT | 18.04.2012 | ||
NL | 18.04.2012 | ||
RO | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
SK | 18.04.2012 | ||
GR | 19.07.2012 | ||
ES | 29.07.2012 | ||
PT | 20.08.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
Former [2013/22] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
CZ | 18.04.2012 | ||
DK | 18.04.2012 | ||
EE | 18.04.2012 | ||
FI | 18.04.2012 | ||
IT | 18.04.2012 | ||
NL | 18.04.2012 | ||
RO | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
SK | 18.04.2012 | ||
GR | 19.07.2012 | ||
ES | 29.07.2012 | ||
PT | 20.08.2012 | ||
Former [2013/11] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
CZ | 18.04.2012 | ||
DK | 18.04.2012 | ||
EE | 18.04.2012 | ||
FI | 18.04.2012 | ||
IT | 18.04.2012 | ||
NL | 18.04.2012 | ||
RO | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
SK | 18.04.2012 | ||
GR | 19.07.2012 | ||
PT | 20.08.2012 | ||
Former [2013/10] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
CZ | 18.04.2012 | ||
DK | 18.04.2012 | ||
EE | 18.04.2012 | ||
FI | 18.04.2012 | ||
NL | 18.04.2012 | ||
RO | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
SK | 18.04.2012 | ||
GR | 19.07.2012 | ||
PT | 20.08.2012 | ||
Former [2013/09] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
DK | 18.04.2012 | ||
EE | 18.04.2012 | ||
FI | 18.04.2012 | ||
NL | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
GR | 19.07.2012 | ||
PT | 20.08.2012 | ||
Former [2013/08] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
DK | 18.04.2012 | ||
FI | 18.04.2012 | ||
NL | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
GR | 19.07.2012 | ||
PT | 20.08.2012 | ||
Former [2013/07] | AT | 18.04.2012 | |
CY | 18.04.2012 | ||
FI | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
GR | 19.07.2012 | ||
PT | 20.08.2012 | ||
Former [2013/01] | CY | 18.04.2012 | |
FI | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
GR | 19.07.2012 | ||
PT | 20.08.2012 | ||
Former [2012/51] | CY | 18.04.2012 | |
FI | 18.04.2012 | ||
SE | 18.04.2012 | ||
SI | 18.04.2012 | ||
GR | 19.07.2012 | ||
Former [2012/50] | CY | 18.04.2012 | |
FI | 18.04.2012 | ||
SE | 18.04.2012 | ||
GR | 19.07.2012 | ||
Former [2012/49] | CY | 18.04.2012 | |
FI | 18.04.2012 | ||
SE | 18.04.2012 | ||
Former [2012/48] | FI | 18.04.2012 | |
SE | 18.04.2012 | Documents cited: | Search | [A]US6034946 (ROGINSKY ALLEN [US], et al) [A] 1-21 * column 1 - column 5 ** figures 3-6 *; | [A]US6301244 (HUANG KAIYUAN [CA], et al) [A] 1-21 * column 1 - column 3 *; | [A]WO0203716 (BRITISH TELECOMM [GB], et al) [A] 1-21 * page 3, line 29 - page 4, line 8 *; | [A] - ROUHANA N ET AL, "Differentiated services and integrated services use of MPLS", (20000703), pages 194 - 199, XP010505346 [A] 1-21 * page 194 - page 199 * | [A] - CHEN ET AL., "Distributed Quality-of-service routing in High speed networks basec on selective probing", PROCEEDINGS 23RD CONFERENCE ON LOCAL COMPUTER NETWORKS; IEEE COMPUTER SOCIETY, Boston, Massachusetts, USA, (19981011), pages 80 - 89, URL: http://citeseer.nj.nec.com/chen99distributed.html, (20030901), XP002253004 [A] 1-21 * page 80 - page 87 * | [A] - CHEN S ET AL, "AN OVERVIEW OF QUALITY OF SERVICE ROUTING FOR NEXT-GENERATION HIGH-SPEED NETWORKS: PROBLEMS AND SOLUTIONS", IEEE NETWORK, IEEE INC. NEW YORK, US, (199811), vol. 12, no. 6, ISSN 0890-8044, pages 64 - 79, XP000873129 [A] 1-21 * page 1 - page 8 * DOI: http://dx.doi.org/10.1109/65.752646 | [A] - ZHENG WANG ET AL, "QUALITY-OF-SERVICE ROUTING FOR SUPPORTING MULTIMIDEA APPLICATIONS", IEEE JOURNAL ON SELECTED AREAS IN COMMUNICATIONS, IEEE INC. NEW YORK, US, (19960901), vol. 14, no. 7, ISSN 0733-8716, pages 1228 - 1234, XP000626273 [A] 1-21 * page 1228 - page 1232 * DOI: http://dx.doi.org/10.1109/49.536364 | [A] - KORKMAZ T ET AL, "An efficient algorithm for finding a path subject to two additive constraints", COMPUTER COMMUNICATIONS, ELSEVIER SCIENCE PUBLISHERS BV, AMSTERDAM, NL, (20020215), vol. 25, no. 3, ISSN 0140-3664, pages 225 - 238, XP004313430 [A] 1-21 * figures 4-6 * DOI: http://dx.doi.org/10.1016/S0140-3664(01)00358-9 | by applicant | WO0203716 |