blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1508247

EP1508247 - METHOD AND APPARATUS FOR DISTRIBUTED SIGNALING FOR UPLINK RATE CONTROL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.04.2018
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  19.05.2017
FormerGrant of patent is intended
Status updated on  02.01.2017
Most recent event   Tooltip26.06.2020Lapse of the patent in a contracting state
New state(s): CY
published on 29.07.2020  [2020/31]
Applicant(s)For all designated states
Intellectual Ventures I LLC
2711 Centerville Road, Suite 400
Wilmington, DE 19808 / US
[2011/44]
Former [2011/42]For all designated states
Intellectual Ventures I LLC
3150 139th Avenue SE, Building 4
Bellevue WA 98005 / US
Former [2007/50]For all designated states
Spyder Navigations L.L.C.
1209 Orange Street
Wilmington, DE 19801 / US
Former [2005/08]For all designated states
Nokia Corporation
Keilalahdentie 4
02150 Espoo / FI
Inventor(s)01 / TOSKALA, Antti
Mankkaanrinne 2 C
FIN-02180 Espoo / FI
02 / MALKAMÄKI, Esa
Riippakoivuntie 17 B
FIN-02130 Espoo / FI
03 / HAO, Guan@Cheng Guang Jia Yuan east 218 1704
Chao Yang district
100025 Beijing / CN
04 / RINNE, Mikko, J.
Tallbergin puistotie 1 C 25
FIN-00200 Helsinki / FI
05 / DERRYBERRY, R. Thomas
2620 Oak Grove Drive
Plano, TX 75074 / US
 [2017/25]
Former [2005/08]01 / TOSKALA, Antti
Mankkaanrinne 2 C
FIN-02180 Espoo / FI
02 / MALKAMÄKI, Esa
Riippakoivuntie 17 B
FIN-02130 Espoo / FI
03 / HAO, Guan Cheng Guang Jia Yuan east 218 1704
Chao Yang district
100025 Beijing / CN
04 / RINNE, Mikko, J.
Tallbergin puistotie 1 C 25
FIN-00200 Helsinki / FI
05 / DERRYBERRY, R. Thomas
2620 Oak Grove Drive
Plano, TX 75074 / US
Representative(s)Small, Gary James, et al
Carpmaels & Ransford LLP
One Southampton Row
London WC1B 5HA / GB
[2017/25]
Former [2010/31]Small, Gary James, et al
Carpmaels & Ransford 43-45 Bloomsbury Square
London WC1A 2RA / GB
Former [2006/52]Piotrowicz, Pawel Jan Andrzej, et al
Venner Shipley LLP Byron House Cambridge Business Park Cowley Road
Cambridge CB4 0WZ / GB
Former [2005/08]Piotrowicz, Pawel Jan Andrzej, et al
Venner Shipley LLP 20 Little Britain
London EC1A 7DH / GB
Application number, filing date03722922.613.05.2003
[2005/08]
WO2003IB01863
Priority number, dateUS2002015675124.05.2002         Original published format: US 156751
[2005/08]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO03100989
Date:04.12.2003
Language:EN
[2003/49]
Type: A2 Application without search report 
No.:EP1508247
Date:23.02.2005
Language:EN
The application published by WIPO in one of the EPO official languages on 04.12.2003 takes the place of the publication of the European patent application.
[2005/08]
Type: B1 Patent specification 
No.:EP1508247
Date:21.06.2017
Language:EN
[2017/25]
Search report(s)International search report - published on:US29.01.2004
(Supplementary) European search report - dispatched on:EP10.03.2010
ClassificationIPC:H04W28/22, H04W52/16, H04W92/10
[2016/51]
CPC:
H04W28/22 (EP,US); H04W52/16 (EP,US); H04W52/20 (EP,US);
H04W52/225 (EP,US); H04W92/10 (EP,US)
Former IPC [2005/08]H04Q7/00, H04Q7/20, H04J3/16, H04J3/22
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2017/25]
Former [2005/08]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR VERTEILTEN ZEICHENGABE FÜR DIE AUFWÄRTSSTRECKENRATENSTEUERUNG[2005/08]
English:METHOD AND APPARATUS FOR DISTRIBUTED SIGNALING FOR UPLINK RATE CONTROL[2005/08]
French:PROCÉDÉ ET APPAREIL DE SIGNALISATION REPARTIE POUR LA COMMANDE DE VITESSE DE LIAISON MONTANTE[2017/03]
Former [2005/08]PROCEDE ET APPAREIL DE SIGNALISATION REPARTIE POUR LA COMMANDE DE VITESSE DE LIAISON MONTANTE
Entry into regional phase24.11.2004National basic fee paid 
24.11.2004Search fee paid 
24.11.2004Designation fee(s) paid 
24.11.2004Examination fee paid 
Examination procedure24.11.2004Examination requested  [2005/11]
14.03.2005Amendment by applicant (claims and/or description)
23.06.2010Despatch of a communication from the examining division (Time limit: M04)
22.10.2010Reply to a communication from the examining division
08.04.2016Despatch of a communication from the examining division (Time limit: M04)
17.08.2016Reply to a communication from the examining division
03.01.2017Communication of intention to grant the patent
15.05.2017Fee for grant paid
15.05.2017Fee for publishing/printing paid
15.05.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  23.06.2010
Opposition(s)22.03.2018No opposition filed within time limit [2018/22]
Fees paidRenewal fee
12.05.2005Renewal fee patent year 03
23.03.2006Renewal fee patent year 04
14.05.2007Renewal fee patent year 05
18.03.2008Renewal fee patent year 06
07.05.2009Renewal fee patent year 07
31.03.2010Renewal fee patent year 08
10.05.2011Renewal fee patent year 09
19.03.2012Renewal fee patent year 10
26.03.2013Renewal fee patent year 11
25.03.2014Renewal fee patent year 12
07.05.2015Renewal fee patent year 13
30.03.2016Renewal fee patent year 14
05.05.2017Renewal fee patent year 15
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.05.2003
AT21.06.2017
CY21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
MC21.06.2017
NL21.06.2017
PT21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
TR21.06.2017
BG21.09.2017
GR22.09.2017
[2020/31]
Former [2020/28]HU13.05.2003
AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
MC21.06.2017
NL21.06.2017
PT21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
TR21.06.2017
BG21.09.2017
GR22.09.2017
Former [2020/15]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
MC21.06.2017
NL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
TR21.06.2017
BG21.09.2017
GR22.09.2017
Former [2019/06]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
MC21.06.2017
NL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
Former [2018/40]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
NL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
Former [2018/21]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
NL21.06.2017
RO21.06.2017
SE21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
Former [2018/11]AT21.06.2017
CZ21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
NL21.06.2017
RO21.06.2017
SE21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
Former [2018/10]AT21.06.2017
CZ21.06.2017
EE21.06.2017
FI21.06.2017
NL21.06.2017
RO21.06.2017
SE21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
Former [2018/09]EE21.06.2017
FI21.06.2017
NL21.06.2017
SE21.06.2017
BG21.09.2017
GR22.09.2017
Former [2017/52]FI21.06.2017
NL21.06.2017
SE21.06.2017
BG21.09.2017
GR22.09.2017
Former [2017/50]FI21.06.2017
SE21.06.2017
BG21.09.2017
GR22.09.2017
Documents cited:Search[X]  - NOKIA, "Two Threshold Node B Packet Scheduling", 3GPP DRAFT; R1-030060, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20020107), vol. RAN WG1, no. San Diego, USA; 20030103, XP050097188 [X] 1-18 * the whole document *
 [X]  - NOKIA, "Two Threshold Node B Packet Scheduling", 3GPP DRAFT; R1-030129_2-THRESHOLD, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20020221), vol. RAN WG1, no. Tokio, XP050097241 [X] 1-18 * the whole document *
 [X]  - NOKIA, "Node B Controlled Scheduling by Fast TFCS Restriction Control", 3GPP DRAFT; R1-030181, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20020218), vol. RAN WG1, no. Tokyo; 20030213, XP050097318 [X] 1-18 * the whole document *
International search[Y]US6307867  (ROOBOL CHRISTIAAN [SE], et al);
 [YP]US2003156580  (ABRAHAM SANTOSH P [US], et al);
 [Y]US2001036823  (VAN LIESHOUT GERT-JAN [NL], et al);
 [AP]US2002151310  (CHUNG SAE-YOUNG [US], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.