blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1509770

EP1509770 - METHOD OF COUPLING BINDING AGENTS TO A SUBSTRATE SURFACE [Right-click to bookmark this link]
Former [2005/09]METHOD OF COUPLING BONDING AGENTS TO A SUBSTRATE SURFACE
[2005/10]
StatusNo opposition filed within time limit
Status updated on  15.05.2015
Database last updated on 02.11.2024
Most recent event   Tooltip13.10.2017Lapse of the patent in a contracting state
New state(s): HU, TR
published on 15.11.2017  [2017/46]
Applicant(s)For all designated states
GE Healthcare Bio-Sciences AB
Björkgatan 30
75184 Uppsala / SE
[N/P]
Former [2014/28]For all designated states
GE Healthcare Bio-Sciences AB
Björkgatan 30
751 84 Uppsala / SE
Former [2008/21]For all designated states
GE Healthcare Bio-Sciences AB
Björkgatan 30
751 84 Uppsala / SE
Former [2005/09]For all designated states
Biacore AB
Rapsgatan 7
754 50 Uppsala / SE
Inventor(s)01 / SÄFSTEN, Pär
Salagatan 35C
S-753 30 Uppsala / SE
02 / TIDARE, Mattias
Märkduksvägen 16
S-757 57 Uppsala / SE
 [2005/09]
Representative(s)Sörby, Lennart, et al
GE Healthcare Bio-Sciences AB Patent Department Björkgatan 30
751 84 Uppsala / SE
[2013/22]
Former [2012/16]Sörby, Lennart, et al
GE Healthcare AS
Patent Department
Nycoveien 2
Box 4220 Nydalen
0401 Oslo / NO
Former [2008/21]Stavbom, Ellen Elisabet, et al
GE Healthcare Bio-Sciences AB Patent Department Björkgatan 30
751 84 Uppsala / SE
Former [2007/23]Widén, Björn, et al
GE Healthcare Bio-Sciences AB Patent Department Björkgatan 30
751 84 Uppsala / SE
Former [2005/09]Widén, Björn, et al
Biacore AB, Rapsgatan 7
754 50 Uppsala / SE
Application number, filing date03738801.428.05.2003
[2005/09]
WO2003SE00879
Priority number, dateSE2002000167331.05.2002         Original published format: SE 0201673
US20020384626P31.05.2002         Original published format: US 384626 P
[2005/09]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO03102580
Date:11.12.2003
Language:EN
[2003/50]
Type: A1 Application with search report 
No.:EP1509770
Date:02.03.2005
Language:EN
The application published by WIPO in one of the EPO official languages on 11.12.2003 takes the place of the publication of the European patent application.
[2005/09]
Type: B1 Patent specification 
No.:EP1509770
Date:09.07.2014
Language:EN
[2014/28]
Search report(s)International search report - published on:SE11.12.2003
ClassificationIPC:G01N33/52, G01N1/00
[2005/09]
CPC:
B01L3/502776 (EP,US); B01J19/0046 (EP,US); B82Y30/00 (EP,US);
B01J2219/00286 (EP,US); B01J2219/00353 (EP,US); B01J2219/00511 (EP,US);
B01J2219/00527 (EP,US); B01J2219/00585 (EP,US); B01J2219/0059 (EP,US);
B01J2219/00596 (EP,US); B01J2219/00605 (EP,US); B01J2219/00617 (EP,US);
B01J2219/00626 (EP,US); B01J2219/00637 (EP,US); B01J2219/00657 (EP,US);
B01J2219/00659 (EP,US); B01J2219/00677 (EP,US); B01J2219/00689 (EP,US);
B01J2219/00704 (EP,US); B01J2219/00725 (EP,US); B01J2219/0074 (EP,US);
B01L2200/0636 (EP,US); B01L2300/0636 (EP,US); B01L2300/0877 (EP,US);
C40B40/10 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2005/09]
TitleGerman:VERFAHREN ZUR KOPPLUNG VON BINDUNGSAGENTIEN AN EINE SUBSTRATOBERFLÄCHE[2005/09]
English:METHOD OF COUPLING BINDING AGENTS TO A SUBSTRATE SURFACE[2005/10]
French:TECHNIQUE DE COUPLAGE D'AGENTS DE LIAISON A LA SURFACE D'UN SUBSTRAT[2005/09]
Former [2005/09]METHOD OF COUPLING BONDING AGENTS TO A SUBSTRATE SURFACE
Entry into regional phase23.11.2004National basic fee paid 
23.11.2004Designation fee(s) paid 
23.11.2004Examination fee paid 
Examination procedure23.11.2004Examination requested  [2005/09]
31.05.2010Despatch of a communication from the examining division (Time limit: M06)
06.12.2010Reply to a communication from the examining division
14.04.2011Despatch of a communication from the examining division (Time limit: M04)
23.08.2011Reply to a communication from the examining division
27.03.2012Despatch of a communication from the examining division (Time limit: M06)
03.10.2012Reply to a communication from the examining division
14.06.2013Cancellation of oral proceeding that was planned for 03.07.2013
03.07.2013Date of oral proceedings (cancelled)
15.07.2013Despatch of a communication from the examining division (Time limit: M04)
07.11.2013Reply to a communication from the examining division
24.02.2014Communication of intention to grant the patent
16.05.2014Fee for grant paid
16.05.2014Fee for publishing/printing paid
16.05.2014Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  31.05.2010
Opposition(s)10.04.2015No opposition filed within time limit [2015/25]
Fees paidRenewal fee
19.05.2005Renewal fee patent year 03
30.05.2006Renewal fee patent year 04
30.05.2007Renewal fee patent year 05
28.05.2008Renewal fee patent year 06
27.05.2009Renewal fee patent year 07
25.05.2010Renewal fee patent year 08
25.05.2011Renewal fee patent year 09
28.03.2012Renewal fee patent year 10
28.05.2013Renewal fee patent year 11
27.05.2014Renewal fee patent year 12
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.05.2003
AT09.07.2014
BE09.07.2014
CY09.07.2014
CZ09.07.2014
DK09.07.2014
EE09.07.2014
ES09.07.2014
FI09.07.2014
IT09.07.2014
MC09.07.2014
NL09.07.2014
RO09.07.2014
SE09.07.2014
SI09.07.2014
SK09.07.2014
TR09.07.2014
BG09.10.2014
GR10.10.2014
PT10.11.2014
[2017/39]
Former [2016/32]AT09.07.2014
BE09.07.2014
CY09.07.2014
CZ09.07.2014
DK09.07.2014
EE09.07.2014
ES09.07.2014
FI09.07.2014
IT09.07.2014
MC09.07.2014
NL09.07.2014
RO09.07.2014
SE09.07.2014
SI09.07.2014
SK09.07.2014
BG09.10.2014
GR10.10.2014
PT10.11.2014
Former [2016/06]AT09.07.2014
CY09.07.2014
CZ09.07.2014
DK09.07.2014
EE09.07.2014
ES09.07.2014
FI09.07.2014
IT09.07.2014
MC09.07.2014
NL09.07.2014
RO09.07.2014
SE09.07.2014
SI09.07.2014
SK09.07.2014
BG09.10.2014
GR10.10.2014
PT10.11.2014
Former [2015/50]AT09.07.2014
CY09.07.2014
CZ09.07.2014
DK09.07.2014
EE09.07.2014
ES09.07.2014
FI09.07.2014
IT09.07.2014
NL09.07.2014
RO09.07.2014
SE09.07.2014
SI09.07.2014
SK09.07.2014
BG09.10.2014
GR10.10.2014
PT10.11.2014
Former [2015/23]AT09.07.2014
CY09.07.2014
CZ09.07.2014
DK09.07.2014
EE09.07.2014
ES09.07.2014
FI09.07.2014
IT09.07.2014
NL09.07.2014
RO09.07.2014
SE09.07.2014
SK09.07.2014
BG09.10.2014
GR10.10.2014
PT10.11.2014
Former [2015/22]AT09.07.2014
CY09.07.2014
DK09.07.2014
ES09.07.2014
FI09.07.2014
IT09.07.2014
NL09.07.2014
RO09.07.2014
SE09.07.2014
BG09.10.2014
GR10.10.2014
PT10.11.2014
Former [2015/12]AT09.07.2014
CY09.07.2014
ES09.07.2014
FI09.07.2014
NL09.07.2014
SE09.07.2014
BG09.10.2014
GR10.10.2014
PT10.11.2014
Former [2015/11]CY09.07.2014
ES09.07.2014
FI09.07.2014
SE09.07.2014
BG09.10.2014
GR10.10.2014
PT10.11.2014
Former [2015/10]ES09.07.2014
FI09.07.2014
SE09.07.2014
BG09.10.2014
Former [2015/09]FI09.07.2014
SE09.07.2014
Cited inInternational search[A]WO9936766  (BIACORE AB [SE], et al)
by applicantWO9936766
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.