blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1550011

EP1550011 - CLOCKWORK MECHANISM [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  05.09.2014
Database last updated on 13.11.2024
Most recent event   Tooltip05.09.2014Application deemed to be withdrawnpublished on 08.10.2014  [2014/41]
Applicant(s)For all designated states
Continental Automotive GmbH
Vahrenwalder Strasse 9
30165 Hannover / DE
[N/P]
Former [2008/20]For all designated states
Continental Automotive GmbH
Vahrenwalder Strasse 9
30165 Hannover / DE
Former [2005/27]For all designated states
Siemens Aktiengesellschaft
Wittelsbacherplatz 2
80333 München / DE
Inventor(s)01 / HAUTVAST, Heinz-Josef
An der Kälberweid 17
78086 Brigachtal / DE
 [2005/27]
Application number, filing date03750333.110.09.2003
[2005/27]
WO2003DE03005
Priority number, dateDE200214709409.10.2002         Original published format: DE 10247094
[2005/27]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report
No.:WO2004034155
Date:22.04.2004
Language:DE
[2004/17]
Type: A2 Application without search report 
No.:EP1550011
Date:06.07.2005
Language:DE
The application published by WIPO in one of the EPO official languages on 22.04.2004 takes the place of the publication of the European patent application.
[2005/27]
Search report(s)International search report - published on:EP18.11.2004
ClassificationIPC:G04B13/00, G07C5/06, F16F15/10
[2005/27]
CPC:
G07C7/00 (EP); G01P1/125 (EP); G04B37/04 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2005/27]
TitleGerman:UHRWERK[2005/27]
English:CLOCKWORK MECHANISM[2005/27]
French:MECANISME D'HORLOGE[2005/27]
Entry into regional phase09.03.2005National basic fee paid 
09.03.2005Designation fee(s) paid 
09.03.2005Examination fee paid 
Examination procedure03.05.2004Request for preliminary examination filed
International Preliminary Examining Authority: EP
09.03.2005Examination requested  [2005/27]
14.02.2007Despatch of a communication from the examining division (Time limit: M04)
08.06.2007Reply to a communication from the examining division
01.04.2014Application deemed to be withdrawn, date of legal effect  [2014/41]
29.04.2014Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2014/41]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  14.02.2007
Fees paidRenewal fee
22.09.2005Renewal fee patent year 03
18.09.2006Renewal fee patent year 04
19.09.2007Renewal fee patent year 05
11.09.2008Renewal fee patent year 06
23.09.2009Renewal fee patent year 07
27.09.2010Renewal fee patent year 08
30.09.2011Renewal fee patent year 09
01.10.2012Renewal fee patent year 10
Penalty fee
Additional fee for renewal fee
30.09.201311   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XA]GB1353869  (KIENZLE APPARATE GMBH) [X] 1,3,4,7-9 * page 1, line 34 - line 94 * * page 2, line 14 - line 77 * * figures 1,2 * [A] 10-12;
 [X]GB1162675  (SANGAMO WESTON LIMITED) [X] 1,4-9 * page 1, line 39 - line 51 * * page 1, line 70 - page 2, line 63 * * figures 1-5 *;
 [X]GB1548645  (SMITHS INDUSTRIES LTD) [X] 1,2 * page 1, line 8 - line 39 * * page 2, line 68 - line 75 * * figure 3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.