blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1583958

EP1583958 - CIRCUIT ARRANGEMENT FOR OPERATING A GAS SENSOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.02.2010
Database last updated on 05.10.2024
Most recent event   Tooltip19.02.2010No opposition filed within time limitpublished on 24.03.2010  [2010/12]
Applicant(s)For all designated states
ROBERT BOSCH GMBH
Postfach 30 02 20
70442 Stuttgart / DE
[2005/41]
Inventor(s)01 / SCHNAIBEL, Eberhard
Hochstetterstrasse 1/5
71282 Hemmingen / DE
02 / JUNGINGER, Erich
Friedrich-Ebert-Strasse 50
70191 Stuttgart / DE
03 / KORING, Andreas
Moerikestrasse 25
71636 Ludwigsburg / DE
04 / DEIBERT, Ruediger
Brandenburger Str. 8
73730 Esslingen a. N. / DE
05 / BRAUN, Harry
Wartmauerstrasse 5
71296 Heimsheim / DE
06 / DIEHL, Lothar
Panoramastrasse 73/2
70839 Gerlingen / DE
 [2005/41]
Application number, filing date03770879.924.09.2003
[2005/41]
WO2003DE03168
Priority number, dateDE200215728407.12.2002         Original published format: DE 10257284
[2005/41]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2004053475
Date:24.06.2004
Language:DE
[2004/26]
Type: A1 Application with search report 
No.:EP1583958
Date:12.10.2005
Language:DE
The application published by WIPO in one of the EPO official languages on 24.06.2004 takes the place of the publication of the European patent application.
[2005/41]
Type: B1 Patent specification 
No.:EP1583958
Date:15.04.2009
Language:DE
[2009/16]
Search report(s)International search report - published on:EP24.06.2004
ClassificationIPC:G01N27/417
[2005/41]
CPC:
G01N27/4175 (EP,US)
Designated contracting statesDE,   FR,   IT,   SE [2006/13]
Former [2005/41]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:SCHALTUNGSANORDNUNG ZUM BETREIBEN EINES GASSENSORS[2005/41]
English:CIRCUIT ARRANGEMENT FOR OPERATING A GAS SENSOR[2005/41]
French:CIRCUITERIE POUR FAIRE FONCTIONNER UN CAPTEUR DE GAZ[2005/41]
Entry into regional phase07.07.2005National basic fee paid 
07.07.2005Designation fee(s) paid 
07.07.2005Examination fee paid 
Examination procedure07.07.2005Examination requested  [2005/41]
02.05.2006Despatch of a communication from the examining division (Time limit: M06)
02.11.2006Reply to a communication from the examining division
12.01.2009Communication of intention to grant the patent
27.02.2009Fee for grant paid
27.02.2009Fee for publishing/printing paid
Opposition(s)18.01.2010No opposition filed within time limit [2010/12]
Fees paidRenewal fee
30.09.2005Renewal fee patent year 03
02.10.2006Renewal fee patent year 04
01.10.2007Renewal fee patent year 05
17.03.2008Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[DA]DE4333231  (BOSCH GMBH ROBERT [DE]) [DA] 1-10 * page 1, line 67 - page 3, line 13; figures 1-3 *;
 [A]DE19636226  (BOSCH GMBH ROBERT [DE]) [A] 1 * column 1, line 34 - column 2, line 10; figures 1,2 *;
 [A]US6059947  (KATO NOBUHIDE [JP], et al) [A] 1 * column 5, line 52 - column 13, line 5; figures 1-4 *;
 [A]US6471840  (GAO YUNZHI [JP], et al) [A] 1 * column 4, line 3 - column 6, line 65; figures 1,4 *;
 [A]US5804700  (KWON CHANG-SOON [KR], et al) [A] 1 * column 3, line 66 - column 4, line 37; figure 6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.