blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1553210

EP1553210 - PROCESS FOR PRODUCING ALUMINA COATING COMPOSED MAINLY OF a-TYPE CRYSTAL STRUCTURE [Right-click to bookmark this link]
Former [2005/28]PROCESS FOR PRODUCING ALUMINA COATING COMPOSED MAINLY OF a-TY PE CRYSTAL STRUCTURE, ALUMINA COATING COMPOSED MAINLY OF a-TY PE CRYSTAL STRUCTURE, LAMINATE COATING INCLUDING THE ALUMINA COATING, MEMBER CLAD WITH THE ALUMINA COATING OR LAMINATE COATING, PROCESS FOR PRODUCING THE MEMBER, AND PHYS
[2013/46]
StatusNo opposition filed within time limit
Status updated on  05.04.2015
Database last updated on 24.07.2024
Most recent event   Tooltip15.07.2016Lapse of the patent in a contracting state
New state(s): TR
published on 17.08.2016  [2016/33]
Applicant(s)For all designated states
KABUSHIKI KAISHA KOBE SEIKO SHO
10-26, Wakinohamacho 2-chome, Chuo-ku Kobe-shi
Hyogo 651-8585 / JP
[2014/22]
Former [2005/28]For all designated states
Kabushiki Kaisha Kobe Seiko Sho
10-26, Wakinohamacho 2-chome, Chuo-ku
Kobe-shi, Hyogo 651-8585 / JP
Inventor(s)01 / Kohara, Toshimitsu@Takasago Works
K.K. Kobe Seiko Sho
3-1, Shinhama 2-chome, Araicho
Takasago-shi, Hyogo 676-8670 / JP
02 / Ikari, Yoshimitsu@Takasago Works
K.K. Kobe Seiko Sho
3-1, Shinhama 2-chome, Araicho
Takasago-shi, Hyogo 676-8670 / JP
03 / Tamagaki, Hiroshi@Takasago Works
K.K. Kobe Seiko Sho
3-1, Shinhama 2-chome, Araicho
Takasago-shi, Hyogo 676-8670 / JP
 [2014/22]
Former [2005/28]01 / Kohara, Toshimitsu Takasago Works
K.K. Kobe Seiko Sho 3-1, Shinhama 2-chome, Araicho
Takasago-shi, Hyogo 676-8670 / JP
02 / Ikari, Yoshimitsu Takasago Works
K.K. Kobe Seiko Sho 3-1, Shinhama 2-chome, Araicho
Takasago-shi, Hyogo 676-8670 / JP
03 / Tamagaki, Hiroshi Takasago Works
K.K. Kobe Seiko Sho 3-1, Shinhama 2-chome, Araicho
Takasago-shi, Hyogo 676-8670 / JP
Representative(s)TBK
Bavariaring 4-6
80336 München / DE
[2014/22]
Former [2005/34]TBK-Patent
Bavariaring 4-6
80336 München / DE
Former [2005/28]Leson, Thomas Johannes Alois, Dipl.-Ing.
Tiedtke-Bühling-Kinne & Partner GbR, TBK-Patent, Bavariaring 4
80336 München / DE
Application number, filing date03784598.908.08.2003
[2005/28]
WO2003JP10114
Priority number, dateJP2002023195408.08.2002         Original published format: JP 2002231954
JP2002035721009.12.2002         Original published format: JP 2002357210
JP2003011735322.04.2003         Original published format: JP 2003117353
JP2003012554830.04.2003         Original published format: JP 2003125548
JP2003012551730.04.2003         Original published format: JP 2003125517
JP2003012554930.04.2003         Original published format: JP 2003125549
JP2003012551930.04.2003         Original published format: JP 2003125519
JP2003012555030.04.2003         Original published format: JP 2003125550
[2005/28]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2004015170
Date:19.02.2004
Language:EN
[2004/08]
Type: A1 Application with search report 
No.:EP1553210
Date:13.07.2005
Language:EN
The application published by WIPO in one of the EPO official languages on 19.02.2004 takes the place of the publication of the European patent application.
[2005/28]
Type: B1 Patent specification 
No.:EP1553210
Date:28.05.2014
Language:EN
[2014/22]
Search report(s)International search report - published on:JP19.02.2004
(Supplementary) European search report - dispatched on:EP01.03.2010
ClassificationIPC:C23C28/00, C23C14/08
[2010/13]
CPC:
C23C14/081 (EP,US); C23C28/321 (EP,US); C23C28/322 (EP,US);
C23C28/34 (EP,US); C23C28/341 (EP,US); C23C28/345 (EP,US);
C23C28/3455 (EP,US); C23C28/347 (EP,US); C23C28/36 (EP,US);
C23C30/005 (EP,US); C23C8/02 (EP,US); C23C8/10 (EP,US) (-)
Former IPC [2005/28]C23C28/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2005/28]
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINER ALUMINIUMOXIDBESCHICHTUNG, DIE HAUPTSÄCHLICH AUS KRISTALLSTRUKTUR VOM a-TYP AUFGEBAUT IST[2013/46]
English:PROCESS FOR PRODUCING ALUMINA COATING COMPOSED MAINLY OF a-TYPE CRYSTAL STRUCTURE[2013/46]
French:PROCÉDÉ DE FABRICATION D'UN REVETEMENT À BASE D'ALUMINE COMPOSÉ PRINCIPALEMENT D'UNE STRUCTURE CRISTALLINE DE TYPE ALPHA[2013/46]
Former [2005/28]VERFAHREN ZUR HERSTELLUNG EINES ALUMINIUMOXID- BERZUGS, DER HAUPTSûCHLICH AUS KRISTALLSTRUKTUR VOM a-TYP AUFGEBAUT IST, ALUMINIUMOXID- BERZUG, DER HAUPTSûCHLICH AUS KRISTALLSTRUKTUR VOM a-TYP AUFGEBAUT IST, LAMINAT BERZUG MIT DEM ALUMINIUMOXID- BERZUG, MIT DEM ALUMINIUMOXID- BERZUG ODER LAMINAT BERZUG UMGEBENES BAUELEMENT, VERFAHREN ZUR HERSTELLUNG DES BAUELEMENTS UND PHYS
Former [2005/28]PROCESS FOR PRODUCING ALUMINA COATING COMPOSED MAINLY OF a-TY PE CRYSTAL STRUCTURE, ALUMINA COATING COMPOSED MAINLY OF a-TY PE CRYSTAL STRUCTURE, LAMINATE COATING INCLUDING THE ALUMINA COATING, MEMBER CLAD WITH THE ALUMINA COATING OR LAMINATE COATING, PROCESS FOR PRODUCING THE MEMBER, AND PHYS
Former [2005/28]PROCEDE DE PRODUCTION D'UN REVETEMENT A BASE D'ALUMINE COMPOSE PRINCIPALEMENT D'UNE STRUCTURE CRISTALLINE DE TYPE ALPHA, REVETEMENT A BASE D'ALUMINE COMPOSE PRINCIPALEMENT D'UNE STRUCTURE CRISTALLINE DE TYPE ALPHA, REVETEMENT LAMINE COMPRENANT LE REVETEMENT A BASE D'ALUMINE, ELEMENT REVETU DU REVETE
Entry into regional phase08.02.2005Translation filed 
08.02.2005National basic fee paid 
08.02.2005Search fee paid 
08.02.2005Designation fee(s) paid 
08.02.2005Examination fee paid 
Examination procedure08.02.2005Examination requested  [2005/28]
17.07.2012Despatch of a communication from the examining division (Time limit: M04)
23.10.2012Reply to a communication from the examining division
25.06.2013Date of oral proceedings
03.07.2013Despatch of a communication from the examining division (Time limit: M04)
03.07.2013Minutes of oral proceedings despatched
17.09.2013Reply to a communication from the examining division
11.12.2013Communication of intention to grant the patent
15.04.2014Fee for grant paid
15.04.2014Fee for publishing/printing paid
15.04.2014Receipt of the translation of the claim(s)
Divisional application(s)EP14169851.4  / EP2848712
EP14169853.0  / EP2865784
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  17.07.2012
Opposition(s)03.03.2015No opposition filed within time limit [2015/19]
Fees paidRenewal fee
30.08.2005Renewal fee patent year 03
30.08.2006Renewal fee patent year 04
30.08.2007Renewal fee patent year 05
31.03.2008Renewal fee patent year 06
28.08.2009Renewal fee patent year 07
30.08.2010Renewal fee patent year 08
30.08.2011Renewal fee patent year 09
30.08.2012Renewal fee patent year 10
29.08.2013Renewal fee patent year 11
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.08.2003
AT28.05.2014
BE28.05.2014
BG28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
IT28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SI28.05.2014
SK28.05.2014
TR28.05.2014
IE08.08.2014
LU08.08.2014
GB28.08.2014
GR29.08.2014
CH31.08.2014
LI31.08.2014
FR01.09.2014
PT29.09.2014
[2016/33]
Former [2016/32]HU08.08.2003
AT28.05.2014
BE28.05.2014
BG28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
IT28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SI28.05.2014
SK28.05.2014
IE08.08.2014
LU08.08.2014
GB28.08.2014
GR29.08.2014
CH31.08.2014
LI31.08.2014
FR01.09.2014
PT29.09.2014
Former [2016/25]AT28.05.2014
BE28.05.2014
BG28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
IT28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SI28.05.2014
SK28.05.2014
IE08.08.2014
LU08.08.2014
GB28.08.2014
GR29.08.2014
CH31.08.2014
LI31.08.2014
FR01.09.2014
PT29.09.2014
Former [2015/38]AT28.05.2014
BE28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
IT28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SI28.05.2014
SK28.05.2014
IE08.08.2014
LU08.08.2014
GB28.08.2014
GR29.08.2014
CH31.08.2014
LI31.08.2014
FR01.09.2014
PT29.09.2014
Former [2015/37]AT28.05.2014
BE28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
IT28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SI28.05.2014
SK28.05.2014
IE08.08.2014
LU08.08.2014
GB28.08.2014
GR29.08.2014
CH31.08.2014
LI31.08.2014
PT29.09.2014
Former [2015/36]AT28.05.2014
BE28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
IT28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SI28.05.2014
SK28.05.2014
LU08.08.2014
GB28.08.2014
GR29.08.2014
CH31.08.2014
LI31.08.2014
PT29.09.2014
Former [2015/30]AT28.05.2014
BE28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
IT28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SK28.05.2014
LU08.08.2014
GR29.08.2014
CH31.08.2014
LI31.08.2014
PT29.09.2014
Former [2015/22]AT28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
IT28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SK28.05.2014
LU08.08.2014
GR29.08.2014
BE31.08.2014
CH31.08.2014
LI31.08.2014
PT29.09.2014
Former [2015/20]AT28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SK28.05.2014
LU08.08.2014
GR29.08.2014
BE31.08.2014
CH31.08.2014
LI31.08.2014
PT29.09.2014
Former [2015/19]AT28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SK28.05.2014
LU08.08.2014
GR29.08.2014
BE31.08.2014
PT29.09.2014
Former [2015/18]AT28.05.2014
BE28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
MC28.05.2014
NL28.05.2014
RO28.05.2014
SK28.05.2014
GR29.08.2014
PT29.09.2014
Former [2015/12]AT28.05.2014
BE28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
NL28.05.2014
RO28.05.2014
SK28.05.2014
GR29.08.2014
PT29.09.2014
Former [2015/11]AT28.05.2014
BE28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
RO28.05.2014
SK28.05.2014
GR29.08.2014
PT29.09.2014
Former [2015/10]AT28.05.2014
BE28.05.2014
CY28.05.2014
CZ28.05.2014
DK28.05.2014
EE28.05.2014
ES28.05.2014
FI28.05.2014
SK28.05.2014
GR29.08.2014
PT29.09.2014
Former [2015/08]AT28.05.2014
BE28.05.2014
CY28.05.2014
DK28.05.2014
FI28.05.2014
GR29.08.2014
PT29.09.2014
Former [2015/02]AT28.05.2014
CY28.05.2014
FI28.05.2014
GR29.08.2014
PT29.09.2014
Former [2014/51]AT28.05.2014
CY28.05.2014
FI28.05.2014
GR29.08.2014
Former [2014/50]CY28.05.2014
FI28.05.2014
GR29.08.2014
Former [2014/49]CY28.05.2014
FI28.05.2014
Former [2014/47]CY28.05.2014
Documents cited:Search[XA]EP1160353  (MITSUBISHI MATERIALS CORP [JP]) [X] 19 * paragraph [0011]; tables 2,4,5 *[A] 1-5
International search[A]US5851687  (LJUNGBERG BJOERN [SE]);
 [A]JP2000218409  (MITSUBISHI MATERIALS CORP)
ExaminationUS5879823
by applicantJP2002053946
    - IKEDA ET AL., THIN SOLID FILMS, (1991), vol. 195, pages 99 - 110
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.