EP1562058 - Plug-and-socket connection for a laser light cable connector [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.01.2008 Database last updated on 29.10.2024 | Most recent event Tooltip | 21.11.2008 | Change - lapse in a contracting state Updated state(s): FR | published on 24.12.2008 [2008/52] | Applicant(s) | For all designated states TRUMPF Laser GmbH + Co. KG Aichhalder Strasse 39 78713 Schramberg / DE | [2005/32] | Inventor(s) | 01 /
Bonna, Ulrich Flöschgasse 43 78647 Trossingen / DE | 02 /
Fuchs, Stefan Ritterstrasse 14 78661 Böhringen / DE | [2005/32] | Representative(s) | Kohler Schmid Möbus Patentanwälte Partnerschaftsgesellschaft mbB Gropiusplatz 10 70563 Stuttgart / DE | [N/P] |
Former [2005/32] | Kohler Schmid Möbus Patentanwälte Ruppmannstrasse 27 70565 Stuttgart / DE | Application number, filing date | 04002607.2 | 05.02.2004 | [2005/32] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP1562058 | Date: | 10.08.2005 | Language: | DE | [2005/32] | Type: | B1 Patent specification | No.: | EP1562058 | Date: | 21.03.2007 | Language: | DE | [2007/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.10.2004 | Classification | IPC: | G02B6/38, H01R13/627 | [2005/32] | CPC: |
G02B6/389 (EP);
G02B6/4296 (EP)
| Designated contracting states | DE, ES, FR, IT [2006/18] |
Former [2005/32] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PT, RO, SE, SI, SK, TR | Title | German: | Steckverbindung für einen Laserlichtleitkabelstecker | [2005/32] | English: | Plug-and-socket connection for a laser light cable connector | [2005/32] | French: | Liasion par enfichage pour un connecteur de câble à transmission de laser | [2006/23] |
Former [2005/32] | Liason par enfichage pour un connecteur de câble à lumière de laser | Examination procedure | 11.04.2005 | Amendment by applicant (claims and/or description) | 12.04.2005 | Examination requested [2005/32] | 18.05.2005 | Despatch of a communication from the examining division (Time limit: M04) | 05.08.2005 | Reply to a communication from the examining division | 11.02.2006 | Loss of particular rights, legal effect: designated state(s) | 24.05.2006 | Communication of intention to grant the patent | 07.06.2006 | Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, DK, EE, FI, GB, GR, HU, IE, LU, MC, NL, PT, RO, SE, SI, SK, TR | 28.07.2006 | Fee for grant paid | 28.07.2006 | Fee for publishing/printing paid | Opposition(s) | 27.12.2007 | No opposition filed within time limit [2008/09] | Fees paid | Renewal fee | 23.02.2006 | Renewal fee patent year 03 | 02.02.2007 | Renewal fee patent year 04 | Penalty fee | Penalty fee Rule 85a EPC 1973 | 20.03.2006 | AT   M01   Not yet paid | 20.03.2006 | BE   M01   Not yet paid | 20.03.2006 | BG   M01   Not yet paid | 20.03.2006 | CH   M01   Not yet paid | 20.03.2006 | CY   M01   Not yet paid | 20.03.2006 | CZ   M01   Not yet paid | 20.03.2006 | DK   M01   Not yet paid | 20.03.2006 | EE   M01   Not yet paid | 20.03.2006 | FI   M01   Not yet paid | 20.03.2006 | GB   M01   Not yet paid | 20.03.2006 | GR   M01   Not yet paid | 20.03.2006 | HU   M01   Not yet paid | 20.03.2006 | IE   M01   Not yet paid | 20.03.2006 | LU   M01   Not yet paid | 20.03.2006 | MC   M01   Not yet paid | 20.03.2006 | NL   M01   Not yet paid | 20.03.2006 | PT   M01   Not yet paid | 20.03.2006 | RO   M01   Not yet paid | 20.03.2006 | SE   M01   Not yet paid | 20.03.2006 | SI   M01   Not yet paid | 20.03.2006 | SK   M01   Not yet paid | 20.03.2006 | TR   M01   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | FR | 21.03.2007 | IT | 21.03.2007 | ES | 02.07.2007 | [2008/52] |
Former [2008/23] | IT | 21.03.2007 | |
ES | 02.07.2007 | ||
FR | 23.11.2007 | ||
Former [2007/47] | ES | 02.07.2007 | Documents cited: | Search | [X]US4213482 (GONDEK JOHN T [US]) [X] 1-5,7,9 * column 3, line 61 - column 5, line 2; figures 1-5 *; | [X]US5462316 (STREET DAVID G [US], et al) [X] 1-5,9 * column 4, line 9 - line 50; figures 1-8 *; | [X]EP0113206 (PARKER HANNIFIN CORP [US]) [X] 1-5,9 * page 4, line 28 - page 5, line 7; figures 1-3 *; | [X]US2860893 (CLARK MALCOLM S) [X] 1-5,7,9 * the whole document *; | [X]DE3401391 (ARGUS GMBH [DE]) [X] 1-5,7,9 * page 9, line 27 - page 11, line 14; figures 1-3 *; | [X]EP0798580 (LUMONICS LTD [GB]) [X] 1-5,7,9 * column 3, line 45 - column 5, line 21; figure 5 *; | [A]US119276 (R. GRIFFITH, R. WENDLAND) [A] 1-5,7,9 * the whole document *; | [A]EP0254233 (SPECIALIZED MECHANISMS INC [US]) [A] 1-5,7,9 * column 4, line 6 - column 6, line 25; figures 2,4 * | Examination | US5550944 |