Extract from the Register of European Patents

EP About this file: EP1480019

EP1480019 - Method and device for measuring of a mass flow [Right-click to bookmark this link]
StatusPatent revoked
Status updated on  22.01.2016
Database last updated on 28.03.2026
Most recent event   Tooltip22.01.2016Revocation of patentpublished on 24.02.2016  [2016/08]
Applicant(s)For all designated states
Bopp & Reuther Messtechnik Gmbh
Am Neuen Rheinhafen 4
67346 Speyer / DE
[2005/41]
Former [2004/48]For all designated states
Helios + Zaschel GmbH
Friedrichstrasse 22
64367 Mühltal / DE
Inventor(s)01 / Jonuscheit, Horst
Gräfenberger Strasse 32 - 34
91080 Uttenreuth / DE
02 / Peyerl, Peter, Dr.
Hermann-Schäffer-Strasse 20
98693 Ilmenau / DE
03 / Zaschel, Jörg, Dr.
Friedrichstrasse 22
64367 Mühltal / DE
 [2004/48]
Representative(s)Pfiz/Gauss Patentanwälte PartmbB
Tübinger Strasse 26
70178 Stuttgart / DE
[N/P]
Former [2004/48]Reule, Hanspeter
Patentawälte, Wolf & Lutz, Hauptmannsreute 93
70193 Stuttgart / DE
Application number, filing date04010874.807.05.2004
[2004/48]
Priority number, dateDE200312276319.05.2003         Original published format: DE 10322763
[2004/48]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP1480019
Date:24.11.2004
Language:DE
[2004/48]
Type: B1 Patent specification 
No.:EP1480019
Date:28.01.2009
Language:DE
[2009/05]
Search report(s)(Supplementary) European search report - dispatched on:EP06.10.2004
ClassificationIPC:G01F1/84
[2004/48]
CPC:
G01F1/8409 (EP); G01F1/8413 (EP); G01F1/8418 (EP);
G01F1/8422 (EP); G01F1/8436 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2005/38]
Former [2005/33]
Former [2004/48]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Verfahren und Vorrichtung zur Messung eines Massestroms[2004/48]
English:Method and device for measuring of a mass flow[2004/48]
French:Procédé et dispositif pour la mesure d'un débit massique[2004/48]
Examination procedure26.07.2005Examination requested  [2005/38]
03.08.2007Despatch of a communication from the examining division (Time limit: M04)
25.09.2007Reply to a communication from the examining division
24.09.2008Communication of intention to grant the patent
10.12.2008Fee for grant paid
10.12.2008Fee for publishing/printing paid
Opposition(s)Opponent(s)01  28.10.2009  30.10.2009  ADMISSIBLE
KROHNE Messtechnik GmbH & Co. KG
Ludwig-Krohne-Strasse 5
D-47058 Duisburg / DE
Opponent's representative
Gesthuysen, Michael
Gesthuysen, von Rohr & Eggert
Huyssenallee 100
45128 Essen / DE
 [N/P]
Former [2009/50]
Opponent(s)01  28.10.2009  30.10.2009  ADMISSIBLE
KROHNE Messtechnik GmbH & Co. KG
Ludwig-Krohne-Strasse 5
D-47058 Duisburg / DE
Opponent's representative
Gesthuysen, Michael
Gesthuysen, von Rohr & Eggert Huyssenallee 100
45128 Essen / DE
14.12.2009Invitation to proprietor to file observations on the notice of opposition
04.06.2010Reply of patent proprietor to notice(s) of opposition
16.06.2010Communication of observations of patent proprietor (Time limit: M04)
07.11.2012Despatch of a communication from the opposition division (Time limit: M01)
17.12.2012Reply to a communication from the opposition division
05.08.2013Despatch of a communication from the opposition division (Time limit: M04)
24.04.2015Cancellation of oral proceeding that was planned for 28.05.2015
28.05.2015Date of oral proceedings
06.10.2015Despatch of communication that the patent will be revoked
16.10.2015Legal effect of revocation of patent [2016/08]
Fees paidRenewal fee
12.05.2006Renewal fee patent year 03
24.05.2007Renewal fee patent year 04
31.03.2008Renewal fee patent year 05
Penalty fee
Penalty fee Rule 85a EPC 1973
01.07.2005AT   M01   Fee paid on   26.07.2005
01.07.2005BE   M01   Fee paid on   26.07.2005
01.07.2005BG   M01   Fee paid on   26.07.2005
01.07.2005CH   M01   Fee paid on   26.07.2005
01.07.2005CY   M01   Fee paid on   26.07.2005
01.07.2005CZ   M01   Fee paid on   26.07.2005
01.07.2005DE   M01   Fee paid on   26.07.2005
01.07.2005DK   M01   Fee paid on   26.07.2005
01.07.2005EE   M01   Fee paid on   26.07.2005
01.07.2005ES   M01   Fee paid on   26.07.2005
01.07.2005FI   M01   Fee paid on   26.07.2005
01.07.2005FR   M01   Fee paid on   26.07.2005
01.07.2005GB   M01   Fee paid on   26.07.2005
01.07.2005GR   M01   Fee paid on   26.07.2005
01.07.2005HU   M01   Fee paid on   26.07.2005
01.07.2005IE   M01   Fee paid on   26.07.2005
01.07.2005IT   M01   Fee paid on   26.07.2005
01.07.2005LU   M01   Fee paid on   26.07.2005
01.07.2005MC   M01   Fee paid on   26.07.2005
01.07.2005NL   M01   Fee paid on   26.07.2005
01.07.2005PL   M01   Fee paid on   26.07.2005
01.07.2005PT   M01   Fee paid on   26.07.2005
01.07.2005RO   M01   Fee paid on   26.07.2005
01.07.2005SE   M01   Fee paid on   26.07.2005
01.07.2005SI   M01   Fee paid on   26.07.2005
01.07.2005SK   M01   Fee paid on   26.07.2005
01.07.2005TR   M01   Fee paid on   26.07.2005
Penalty fee Rule 85b EPC 1973
01.07.2005M01   Fee paid on   26.07.2005
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY28.01.2009
CZ28.01.2009
DK28.01.2009
EE28.01.2009
FI28.01.2009
IE28.01.2009
IT28.01.2009
NL28.01.2009
PL28.01.2009
RO28.01.2009
SI28.01.2009
SK28.01.2009
TR28.01.2009
BG28.04.2009
SE28.04.2009
GR29.04.2009
LU07.05.2009
ES09.05.2009
BE31.05.2009
MC31.05.2009
PT29.06.2009
HU29.07.2009
AT07.05.2012
GB07.05.2012
FR31.05.2012
CH31.05.2013
LI31.05.2013
DE02.12.2014
[2015/22]
Former [2014/08]CY28.01.2009
CZ28.01.2009
DK28.01.2009
EE28.01.2009
FI28.01.2009
IE28.01.2009
IT28.01.2009
NL28.01.2009
PL28.01.2009
RO28.01.2009
SI28.01.2009
SK28.01.2009
TR28.01.2009
BG28.04.2009
SE28.04.2009
GR29.04.2009
LU07.05.2009
ES09.05.2009
BE31.05.2009
MC31.05.2009
PT29.06.2009
HU29.07.2009
AT07.05.2012
GB07.05.2012
FR31.05.2012
CH31.05.2013
LI31.05.2013
Former [2011/32]CZ28.01.2009
DK28.01.2009
EE28.01.2009
FI28.01.2009
IE28.01.2009
IT28.01.2009
NL28.01.2009
PL28.01.2009
RO28.01.2009
SI28.01.2009
SK28.01.2009
BG28.04.2009
SE28.04.2009
GR29.04.2009
LU07.05.2009
ES09.05.2009
BE31.05.2009
MC31.05.2009
PT29.06.2009
HU29.07.2009
Former [2011/21]CZ28.01.2009
DK28.01.2009
EE28.01.2009
FI28.01.2009
IE28.01.2009
IT28.01.2009
NL28.01.2009
PL28.01.2009
RO28.01.2009
SI28.01.2009
SK28.01.2009
BG28.04.2009
SE28.04.2009
GR29.04.2009
LU07.05.2009
ES09.05.2009
BE31.05.2009
MC31.05.2009
PT29.06.2009
Former [2011/14]CZ28.01.2009
DK28.01.2009
EE28.01.2009
FI28.01.2009
IE28.01.2009
IT28.01.2009
NL28.01.2009
PL28.01.2009
RO28.01.2009
SI28.01.2009
SK28.01.2009
BG28.04.2009
SE28.04.2009
GR29.04.2009
ES09.05.2009
BE31.05.2009
MC31.05.2009
PT29.06.2009
Former [2010/49]CZ28.01.2009
DK28.01.2009
EE28.01.2009
FI28.01.2009
IE28.01.2009
NL28.01.2009
PL28.01.2009
RO28.01.2009
SI28.01.2009
SK28.01.2009
BG28.04.2009
SE28.04.2009
GR29.04.2009
ES09.05.2009
BE31.05.2009
MC31.05.2009
PT29.06.2009
Former [2010/28]CZ28.01.2009
DK28.01.2009
EE28.01.2009
FI28.01.2009
IE28.01.2009
NL28.01.2009
PL28.01.2009
RO28.01.2009
SI28.01.2009
SK28.01.2009
BG28.04.2009
SE28.04.2009
ES09.05.2009
BE31.05.2009
MC31.05.2009
PT29.06.2009
Former [2010/08]CZ28.01.2009
DK28.01.2009
EE28.01.2009
FI28.01.2009
IE28.01.2009
NL28.01.2009
PL28.01.2009
RO28.01.2009
SI28.01.2009
SK28.01.2009
BG28.04.2009
SE28.04.2009
ES09.05.2009
MC31.05.2009
PT29.06.2009
Former [2010/04]CZ28.01.2009
DK28.01.2009
EE28.01.2009
FI28.01.2009
IE28.01.2009
NL28.01.2009
PL28.01.2009
RO28.01.2009
SI28.01.2009
SK28.01.2009
SE28.04.2009
ES09.05.2009
MC31.05.2009
PT29.06.2009
Former [2009/50]CZ28.01.2009
DK28.01.2009
EE28.01.2009
FI28.01.2009
IE28.01.2009
NL28.01.2009
PL28.01.2009
RO28.01.2009
SI28.01.2009
SK28.01.2009
SE28.04.2009
ES09.05.2009
PT29.06.2009
Former [2009/47]DK28.01.2009
FI28.01.2009
IE28.01.2009
NL28.01.2009
PL28.01.2009
SI28.01.2009
SE28.04.2009
ES09.05.2009
PT29.06.2009
Former [2009/46]DK28.01.2009
FI28.01.2009
NL28.01.2009
PL28.01.2009
SI28.01.2009
SE28.04.2009
ES09.05.2009
PT29.06.2009
Former [2009/40]FI28.01.2009
NL28.01.2009
PL28.01.2009
SI28.01.2009
SE28.04.2009
ES09.05.2009
PT29.06.2009
Former [2009/36]FI28.01.2009
NL28.01.2009
SI28.01.2009
ES09.05.2009
Former [2009/35]NL28.01.2009
ES09.05.2009
Documents cited:Search[A] US5448921  (CAGE DONALD R et al.) [A] 1,16 * column 23, line 15 - column 24, line 4; figures 25-27 *
 [A] US4680974  (SIMONSEN JENS K et al.) [A] 1,16 * column 5, line 5 - line 50; figure 5 *
 [A] EP0919793  (FOXBORO CO et al.) [A] 1,16 * page 3, line 22 - line 23 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.