blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1587962

EP1587962 - AN IMPROVED SMELTING PROCESS FOR THE PRODUCTION OF IRON [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.06.2011
Database last updated on 05.10.2024
Most recent event   Tooltip20.01.2012Lapse of the patent in a contracting state
New state(s): IE
published on 22.02.2012  [2012/08]
Applicant(s)For all designated states
Outotec Ausmelt Pty Ltd.
12 Kitchen Road
Dandenong VIC 3175 / AU
[2010/46]
Former [2005/43]For all designated states
AUSMELT LIMITED
12 Kitchen Road
Dandenong, VIC 3175 / AU
Inventor(s)01 / NG, Colette, Maria
17 Flinders Street
Mentone, Victoria 3194 / AU
02 / BALDOCK, Brian, Ross
49 McCormicks Road
Skye, Victoria 3977 / AU
03 / SOFRA, Giuseppe
2/16 Jolimont Terrace
East Melbourne, Victoria3002 / AU
04 / HUGHES, Stephen, Peter
3 Iluka Street
Black Rock, Victoria 3193 / AU
05 / MATUSEWICZ, Robert, Walter
23 Abbeygate Street
Oakleigh, Victoria 3166 / AU
06 / MCCLELLAND, Ross, Alexander
11/24 Turner Street
Berwick, Victoria 3806 / AU
07 / SHERRINGTON, David, Matthew
51 Walara Drive
Mt Martha, Victoria 3934 / AU
 [2005/43]
Representative(s)Rambelli, Paolo, et al
Jacobacci & Partners S.p.A.
Corso Emilia 8
10152 Torino / IT
[N/P]
Former [2005/43]Rambelli, Paolo, et al
Jacobacci & Partners S.p.A. Corso Emilia 8
10152 Torino / IT
Application number, filing date04703318.820.01.2004
[2005/43]
WO2004AU00068
Priority number, dateAU2003090035724.01.2003         Original published format: AU 2003900357
[2005/43]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2004065641
Date:05.08.2004
Language:EN
[2004/32]
Type: A1 Application with search report 
No.:EP1587962
Date:26.10.2005
Language:EN
The application published by WIPO in one of the EPO official languages on 05.08.2004 takes the place of the publication of the European patent application.
[2005/43]
Type: B1 Patent specification 
No.:EP1587962
Date:28.07.2010
Language:EN
[2010/30]
Type: B8 Corrected title page of specification 
No.:EP1587962
Date:22.12.2010
[2010/51]
Search report(s)International search report - published on:AU05.08.2004
(Supplementary) European search report - dispatched on:EP18.07.2008
ClassificationIPC:C21B11/08, C21B13/10
[2005/43]
CPC:
C22B5/10 (EP,US); C21B11/08 (KR); C21B13/0013 (EP,US);
C21B13/10 (KR); C21B3/06 (EP,US); C21C5/562 (EP,US);
C21B2400/022 (EP,US); C22B7/04 (EP,US); Y02P10/134 (EP,US);
Y02P10/20 (EP,US); Y02W30/50 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2005/43]
Extension statesALNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
TitleGerman:VERBESSERTES VERHÜTTUNGSVERFAHREN ZUR HERSTELLUNG VON EISEN[2005/43]
English:AN IMPROVED SMELTING PROCESS FOR THE PRODUCTION OF IRON[2005/43]
French:PROCEDE DE FUSION AMELIORE PERMETTANT DE PRODUIRE DU FER[2005/43]
Entry into regional phase12.08.2005National basic fee paid 
12.08.2005Search fee paid 
12.08.2005Designation fee(s) paid 
12.08.2005Examination fee paid 
Examination procedure13.08.2004Request for preliminary examination filed
International Preliminary Examining Authority: AU
12.08.2005Examination requested  [2005/43]
18.09.2009Communication of intention to grant the patent
19.01.2010Fee for grant paid
19.01.2010Fee for publishing/printing paid
Opposition(s)29.04.2011No opposition filed within time limit [2011/27]
Fees paidRenewal fee
05.01.2006Renewal fee patent year 03
08.01.2007Renewal fee patent year 04
19.12.2007Renewal fee patent year 05
19.12.2008Renewal fee patent year 06
18.12.2009Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY28.07.2010
DK28.07.2010
EE28.07.2010
SI28.07.2010
BG28.10.2010
GR29.10.2010
PT29.11.2010
IE20.01.2011
CH31.01.2011
LI31.01.2011
MC31.01.2011
[2012/08]
Former [2011/48]CY28.07.2010
DK28.07.2010
EE28.07.2010
SI28.07.2010
BG28.10.2010
GR29.10.2010
PT29.11.2010
CH31.01.2011
LI31.01.2011
MC31.01.2011
Former [2011/42]CY28.07.2010
DK28.07.2010
EE28.07.2010
SI28.07.2010
BG28.10.2010
GR29.10.2010
PT29.11.2010
MC31.01.2011
Former [2011/24]CY28.07.2010
DK28.07.2010
EE28.07.2010
SI28.07.2010
BG28.10.2010
GR29.10.2010
PT29.11.2010
Former [2011/19]CY28.07.2010
DK28.07.2010
SI28.07.2010
BG28.10.2010
GR29.10.2010
PT29.11.2010
Former [2011/15]CY28.07.2010
SI28.07.2010
BG28.10.2010
GR29.10.2010
PT29.11.2010
Former [2011/13]CY28.07.2010
SI28.07.2010
BG28.10.2010
PT29.11.2010
Former [2011/12]SI28.07.2010
BG28.10.2010
PT29.11.2010
Former [2011/10]SI28.07.2010
PT29.11.2010
Documents cited:Search   [ ] - No further relevant documents disclosed
International search[A]US5498277  (FLOYD JOHN M [AU], et al);
 [X]EP1067201  (TECH RESOURCES PTY LTD [AU]);
 [X]WO0164960  (TECH RESOURCES PTY LTD [AU], et al);
 [X]WO0224963  (TECH RESOURCES PTY LTD [AU], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.