blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1778005

EP1778005 - MUSSEL SOCK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  31.01.2014
Database last updated on 11.09.2024
Most recent event   Tooltip17.07.2015Lapse of the patent in a contracting state
New state(s): HU, LU
published on 19.08.2015  [2015/34]
Applicant(s)For all designated states
Go Deep International Inc.
P.O. Box 493 Station A
Fredericton NB E3B 4Z9 / CA
[2007/18]
Inventor(s)01 / FERGUSON, Kent
101 Robby's Road
Masonworth, New Brunswick E3C 1M2 / CA
 [2007/18]
Representative(s)Rickard, David John, et al
Ipulse
26 Mallinson Road
London SW11 1BP / GB
[N/P]
Former [2010/51]Rickard, David John, et al
Ipulse 26 Mallinson Road London
SW11 1BP / GB
Former [2008/44]Rickard, David John
Ipulse 26 Mallinson Road London
SW11 1BP / GB
Former [2007/18]Rickard, David John
26 Mallinson Road
London, Greater London SW11 1BP / GB
Application number, filing date04737906.030.06.2004
[2007/18]
WO2004CA00967
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2006002504
Date:12.01.2006
Language:EN
[2006/02]
Type: A1 Application with search report 
No.:EP1778005
Date:02.05.2007
Language:EN
The application published by WIPO in one of the EPO official languages on 12.01.2006 takes the place of the publication of the European patent application.
[2007/18]
Type: B1 Patent specification 
No.:EP1778005
Date:27.03.2013
Language:EN
[2013/13]
Search report(s)International search report - published on:EP12.01.2006
ClassificationIPC:A01K61/00
[2007/18]
CPC:
A01K61/54 (EP); Y02A40/81 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2007/18]
TitleGerman:MUSCHELNETZSCHLÄUCHE[2007/18]
English:MUSSEL SOCK[2007/18]
French:Boudin de mytiliculture[2012/41]
Former [2007/18]BOUDIN
Entry into regional phase30.01.2007National basic fee paid 
30.01.2007Designation fee(s) paid 
30.01.2007Examination fee paid 
Examination procedure30.01.2007Amendment by applicant (claims and/or description)
30.01.2007Examination requested  [2007/18]
09.10.2007Despatch of a communication from the examining division (Time limit: M06)
14.04.2008Reply to a communication from the examining division
14.08.2009Despatch of a communication from the examining division (Time limit: M06)
10.02.2010Reply to a communication from the examining division
15.11.2010Despatch of a communication from the examining division (Time limit: M06)
25.05.2011Reply to a communication from the examining division
05.10.2012Communication of intention to grant the patent
11.02.2013Fee for grant paid
11.02.2013Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  09.10.2007
Opposition(s)03.01.2014No opposition filed within time limit [2014/10]
Fees paidRenewal fee
30.01.2007Renewal fee patent year 03
18.06.2007Renewal fee patent year 04
25.06.2008Renewal fee patent year 05
24.06.2009Renewal fee patent year 06
29.06.2010Renewal fee patent year 07
29.06.2011Renewal fee patent year 08
26.06.2012Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.06.2004
AT27.03.2013
BE27.03.2013
CY27.03.2013
CZ27.03.2013
DK27.03.2013
EE27.03.2013
FI27.03.2013
MC27.03.2013
PL27.03.2013
RO27.03.2013
SE27.03.2013
SI27.03.2013
SK27.03.2013
TR27.03.2013
BG27.06.2013
CH30.06.2013
LI30.06.2013
LU30.06.2013
PT29.07.2013
DE01.01.2014
[2015/34]
Former [2015/32]AT27.03.2013
BE27.03.2013
CY27.03.2013
CZ27.03.2013
DK27.03.2013
EE27.03.2013
FI27.03.2013
MC27.03.2013
PL27.03.2013
RO27.03.2013
SE27.03.2013
SI27.03.2013
SK27.03.2013
TR27.03.2013
BG27.06.2013
CH30.06.2013
LI30.06.2013
PT29.07.2013
DE01.01.2014
Former [2014/22]AT27.03.2013
BE27.03.2013
CY27.03.2013
CZ27.03.2013
DK27.03.2013
EE27.03.2013
FI27.03.2013
MC27.03.2013
PL27.03.2013
RO27.03.2013
SE27.03.2013
SI27.03.2013
SK27.03.2013
BG27.06.2013
CH30.06.2013
LI30.06.2013
PT29.07.2013
DE01.01.2014
Former [2014/20]AT27.03.2013
BE27.03.2013
CY27.03.2013
CZ27.03.2013
DK27.03.2013
EE27.03.2013
FI27.03.2013
MC27.03.2013
PL27.03.2013
RO27.03.2013
SE27.03.2013
SI27.03.2013
SK27.03.2013
BG27.06.2013
CH30.06.2013
LI30.06.2013
PT29.07.2013
Former [2014/09]AT27.03.2013
BE27.03.2013
CY27.03.2013
CZ27.03.2013
DK27.03.2013
EE27.03.2013
FI27.03.2013
MC27.03.2013
PL27.03.2013
RO27.03.2013
SE27.03.2013
SI27.03.2013
SK27.03.2013
BG27.06.2013
PT29.07.2013
Former [2014/08]AT27.03.2013
BE27.03.2013
CY27.03.2013
CZ27.03.2013
EE27.03.2013
FI27.03.2013
MC27.03.2013
PL27.03.2013
RO27.03.2013
SE27.03.2013
SI27.03.2013
SK27.03.2013
BG27.06.2013
PT29.07.2013
Former [2013/52]AT27.03.2013
BE27.03.2013
CY27.03.2013
CZ27.03.2013
EE27.03.2013
FI27.03.2013
PL27.03.2013
RO27.03.2013
SE27.03.2013
SI27.03.2013
SK27.03.2013
BG27.06.2013
PT29.07.2013
Former [2013/50]AT27.03.2013
BE27.03.2013
CZ27.03.2013
EE27.03.2013
FI27.03.2013
PL27.03.2013
RO27.03.2013
SE27.03.2013
SI27.03.2013
SK27.03.2013
BG27.06.2013
PT29.07.2013
Former [2013/49]AT27.03.2013
BE27.03.2013
CZ27.03.2013
EE27.03.2013
FI27.03.2013
RO27.03.2013
SE27.03.2013
SI27.03.2013
SK27.03.2013
BG27.06.2013
PT29.07.2013
Former [2013/48]AT27.03.2013
BE27.03.2013
EE27.03.2013
FI27.03.2013
SE27.03.2013
SI27.03.2013
BG27.06.2013
PT29.07.2013
Former [2013/47]BE27.03.2013
FI27.03.2013
SE27.03.2013
SI27.03.2013
BG27.06.2013
PT29.07.2013
Former [2013/44]BE27.03.2013
FI27.03.2013
SE27.03.2013
SI27.03.2013
BG27.06.2013
Former [2013/37]FI27.03.2013
SE27.03.2013
SI27.03.2013
BG27.06.2013
Former [2013/34]SE27.03.2013
BG27.06.2013
Cited inInternational search[A]FR993170  (PLANET HENRI) [A] 1,10* the whole document *;
 [Y]FR2521065  (NORTENE SA [FR]) [Y] 17,19 * page 2, lines 37-39 *;
 [XY]FR2554319  (LHONNEUR PIERRE [FR]) [X] 1,5,7,9,10,12,13 * page 1, line 26 - page 2, line 11 * * page 2, line 33 - page 3, line 16 * * page 4, line 22 - page 6, line 3 * * page 6, line 33 - page 7, line 5 * * page 9, lines 13-27 * * figures 7,8 * [Y] 2-4,6,8,11,14-20;
 [Y]FR2583613  (NORLAC PLASTIQUES [FR]) [Y] 3,15 * page 2, lines 1-4 *;
 [Y]FR2636206  (LHONNEUR PIERRE [FR]) [Y] 4,16 * page 6, line 34 - page 7, line 9 *;
 [Y]US5511514  (HITCHINS MICHAEL W [NZ], et al) [Y] 18,20 * column 3, lines 40-58 *;
 [Y]EP1321371  (INTERMAS NETS SA [ES]) [Y] 2,6,8,11,14 * paragraphs [0012] , [0016] * * figures 1,3 *
by applicantFR2554319
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.