blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1652873

EP1652873 - RUBBER MASTER BATCH AND METHOD FOR PRODUCTION THEREOF [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  10.08.2012
Database last updated on 25.09.2024
Most recent event   Tooltip10.08.2012Application deemed to be withdrawnpublished on 12.09.2012  [2012/37]
Applicant(s)For all designated states
Bridgestone Corporation
10-1, Kyobashi 1-chome
Chuo-ku
Tokyo 104-8340 / JP
[N/P]
Former [2006/18]For all designated states
Bridgestone Corporation
10-1, Kyobashi 1-chome, Chuo-ku
Tokyo 104-8340 / JP
Inventor(s)01 / YANAGISAWA, Kazuhiro
3-1-1, ogawahigashi-cho
Kodaira-shi, Tokyo 1878531 / JP
02 / SOMENO, Kazuaki
3-1-1, ogawahigashi-cho
Kodaira-shi, Tokyo 1878531 / JP
 [2006/18]
Representative(s)Oxley, Robin John George, et al
Marks & Clerk LLP
15 Fetter Lane
London EC4A 1BW / GB
[N/P]
Former [2012/17]Oxley, Robin John George, et al
Marks & Clerk LLP
90 Long Acre
London
WC2E 9RA / GB
Former [2006/18]Whalley, Kevin
Marks & Clerk 90 Long Acre
London WC2E 9RA / GB
Application number, filing date04746900.202.07.2004
[2006/18]
WO2004JP09431
Priority number, dateJP2003028674305.08.2003         Original published format: JP 2003286743
[2006/18]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2005012396
Date:10.02.2005
Language:EN
[2005/06]
Type: A1 Application with search report 
No.:EP1652873
Date:03.05.2006
Language:EN
The application published by WIPO in one of the EPO official languages on 10.02.2005 takes the place of the publication of the European patent application.
[2006/18]
Search report(s)International search report - published on:JP10.02.2005
(Supplementary) European search report - dispatched on:EP11.09.2009
ClassificationIPC:C08J3/22, B60C1/00, C08K3/04, C08K3/22, C08K3/36, C08L21/00
[2006/18]
CPC:
B29B7/005 (EP,US); B29B7/90 (EP,US); C08J3/215 (EP,US);
C08K3/013 (EP,US); C08J2321/00 (EP,US)
C-Set:
C08K3/013, C08L21/00 (EP,US)
Designated contracting statesDE,   ES,   FR,   GB,   IT [2006/45]
Former [2006/18]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
Extension statesALNot yet paid
HRNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
TitleGerman:KAUTSCHUKMASTERBATCH UND HERSTELLUNGSVERFAHREN DAFÜR[2006/18]
English:RUBBER MASTER BATCH AND METHOD FOR PRODUCTION THEREOF[2006/18]
French:MELANGE MAITRE DE CAOUTCHOUC ET SON PROCEDE D'OBTENTION[2006/18]
Entry into regional phase31.01.2006Translation filed 
30.01.2006National basic fee paid 
30.01.2006Search fee paid 
30.01.2006Designation fee(s) paid 
30.01.2006Examination fee paid 
Examination procedure31.01.2006Examination requested  [2006/18]
10.03.2010Despatch of a communication from the examining division (Time limit: M04)
14.07.2010Reply to a communication from the examining division
11.01.2011Despatch of a communication from the examining division (Time limit: M04)
20.05.2011Reply to a communication from the examining division
10.06.2011Despatch of a communication from the examining division (Time limit: M04)
13.10.2011Reply to a communication from the examining division
07.11.2011Despatch of a communication from the examining division (Time limit: M04)
20.03.2012Application deemed to be withdrawn, date of legal effect  [2012/37]
24.04.2012Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2012/37]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  10.03.2010
Fees paidRenewal fee
12.07.2006Renewal fee patent year 03
13.07.2007Renewal fee patent year 04
31.03.2008Renewal fee patent year 05
10.07.2009Renewal fee patent year 06
14.07.2010Renewal fee patent year 07
12.07.2011Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]EP0426024  (DU PONT [US]) [X] 1-4,8-11 * page 3, line 53 - line 54 * * page 4, line 18 - line 38 * * page 6, line 47 - line 49 ** page 8, line 28 - line 39; figure 1; claim 1 *;
 [X]WO03024683  (BUEHLER AG [CH], et al) [X] 1-4,8-11 * page 4, line 18 - line 23 * * page 5, line 16 - line 22 * * page 6, line 6 - line 12 * * page 8, line 8 - line 12 * * page 8, line 20 - page 9, line 5 * * page 10, line 11 - line 14; figure 1; claims 1-9,38 *
International search[A]JP2002363295  (SUMITOMO RUBBER IND);
 [A]EP1283219  (BRIDGESTONE CORP [JP]);
 [A]US2003134943  (LABARRE DOMINIQUE [FR], et al)
ExaminationUS6348522
 JP2003138025
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.