blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1644149

EP1644149 - METHOD FOR MAKING GAS TURBINE ELEMENTS AND CORRESPONDING ELEMENT [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  02.08.2013
Database last updated on 02.11.2024
Most recent event   Tooltip02.08.2013Application deemed to be withdrawnpublished on 04.09.2013  [2013/36]
Applicant(s)For all designated states
MTU Aero Engines AG
Dachauer Strasse 665
80995 München / DE
[N/P]
Former [2006/15]For all designated states
MTU Aero Engines GmbH
Dachauer Strasse 665
80995 München / DE
Inventor(s)01 / BOHDAHL, Rudolf
Fasanenstrasse 52
85757 Karlsfeld / DE
 [2006/15]
Application number, filing date04762355.808.07.2004
[2006/15]
WO2004DE01467
Priority number, dateDE200313139711.07.2003         Original published format: DE 10331397
[2006/15]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report
No.:WO2005007326
Date:27.01.2005
Language:DE
[2005/04]
Type: A2 Application without search report 
No.:EP1644149
Date:12.04.2006
Language:DE
The application published by WIPO in one of the EPO official languages on 27.01.2005 takes the place of the publication of the European patent application.
[2006/15]
Search report(s)International search report - published on:EP16.06.2005
ClassificationIPC:B22F5/04, B22F7/06, B22F3/22
[2012/43]
CPC:
B22F3/225 (EP,US); B22F5/04 (EP,US); B22F7/062 (EP,US);
B22F2998/00 (EP,US); B22F2998/10 (EP,US); F05B2230/21 (EP,US);
F05B2230/22 (EP,US) (-)
C-Set:
B22F2998/00, B22F3/225 (EP,US);
B22F2998/10, B22F3/22, B22F7/062, B22F3/1021 (US,EP)
Former IPC [2006/15]B22F5/04
Designated contracting statesDE,   FR,   GB [2006/20]
Former [2006/15]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
Extension statesALNot yet paid
HRNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON BAUTEILEN EINER GASTURBINE SOWIE ENTSPRECHENDES BAUTEIL[2006/15]
English:METHOD FOR MAKING GAS TURBINE ELEMENTS AND CORRESPONDING ELEMENT[2006/15]
French:PROCEDE POUR REALISER DES ELEMENTS DE TURBINE A GAZ ET ELEMENT CORRESPONDANT[2006/15]
Entry into regional phase04.11.2005National basic fee paid 
04.11.2005Designation fee(s) paid 
04.11.2005Examination fee paid 
Examination procedure04.11.2005Examination requested  [2006/15]
09.02.2012Despatch of a communication from the examining division (Time limit: M04)
19.06.2012Reply to a communication from the examining division
30.10.2012Communication of intention to grant the patent
12.03.2013Application deemed to be withdrawn, date of legal effect  [2013/36]
18.04.2013Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2013/36]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  09.02.2012
Fees paidRenewal fee
13.07.2006Renewal fee patent year 03
28.07.2007Renewal fee patent year 04
15.07.2008Renewal fee patent year 05
20.07.2009Renewal fee patent year 06
27.07.2010Renewal fee patent year 07
25.07.2011Renewal fee patent year 08
23.07.2012Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[I]GB1470949  (FORD MOTOR CO) [I] 1-16 * page 1, column L, line 9 - line 41 * * page 1, column R, line 58 - line 75 * * page 2, column L, line 59 - column R, line 119 * * figure -; claims 1,3,7 *;
 [A]WO8605424  (MTU MUENCHEN GMBH [DE]) [A] 1-16 * the whole document *;
 [A]  - LANGE E ET AL, "HERSTELLUNG METALLISCHER TURBINEBAUTEILE NACH DER PM-SPRITZGIESSTECHNIK P/M INJECTION MOULDING OF METALLIC TURBINE PORTS", ZEITSCHRIFT FUER WERKSTOFFTECHNIK - JOURNAL OF MATERIALS TECHNOLOGY. MATERIALS TECHNOLOGY AND TESTING, VCH, WEINHEIM, DE, (1987), vol. 18, no. 10, ISSN 0049-8688, pages 337 - 344, XP001099034 [A] 1-16 * the whole document *
by applicantGB1470949
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.