EP1685675 - MULTI-CARRIER OFDM UWB COMMUNICATIONS SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.12.2009 Database last updated on 12.07.2024 | Most recent event Tooltip | 07.10.2011 | Lapse of the patent in a contracting state New state(s): CY, TR | published on 09.11.2011 [2011/45] | Applicant(s) | For all designated states NXP B.V. High Tech Campus 60 5656 AG Eindhoven / NL | [2007/31] |
Former [2006/31] | For all designated states Koninklijke Philips Electronics N.V. Groenewoudseweg 1 5621 BA Eindhoven / NL | Inventor(s) | 01 /
RAZZELL, Charles 1109 McKay Drive, M/S-SJ41 San Jose, CA 95131-1706 / US | [2006/31] | Representative(s) | Williamson, Paul Lewis, et al NXP Semiconductors Intellectual Property and Licensing Red Central 60 High Street, Redhill Surrey RH1 1NY / GB | [N/P] |
Former [2009/09] | Williamson, Paul Lewis, et al NXP Semiconductors UK Ltd. Intellectual Property Department Betchworth House Station Road Redhill Surrey RH1 1DL / GB | ||
Former [2007/01] | White, Andrew Gordon, et al NXP Semiconductors Intellectual Property Department Cross Oak Lane Redhill, Surrey RH1 5HA / GB | ||
Former [2006/31] | Volmer, Georg Philips Intellectual Property & Standards GmbH, Postfach 50 04 42 52088 Aachen / DE | Application number, filing date | 04770157.8 | 01.10.2004 | [2006/31] | WO2004IB51954 | Priority number, date | US20030507753P | 01.10.2003 Original published format: US 507753 P | US20040853436 | 24.05.2004 Original published format: US 853436 | [2006/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2005034419 | Date: | 14.04.2005 | Language: | EN | [2005/15] | Type: | A1 Application with search report | No.: | EP1685675 | Date: | 02.08.2006 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.04.2005 takes the place of the publication of the European patent application. | [2006/31] | Type: | B1 Patent specification | No.: | EP1685675 | Date: | 11.02.2009 | Language: | EN | [2009/07] | Search report(s) | International search report - published on: | EP | 14.04.2005 | Classification | IPC: | H04L5/02 | [2006/31] | CPC: |
H04L27/2602 (EP,KR,US);
H04L27/26 (KR);
H04L27/2601 (EP,US);
H04L5/02 (KR);
H04L5/026 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2006/31] | Extension states | AL | Not yet paid | HR | Not yet paid | LT | Not yet paid | LV | Not yet paid | MK | Not yet paid | Title | German: | MEHRTRÄGER-OFDM-UBB-KOMMUNIKATIONSSYSTEME | [2006/31] | English: | MULTI-CARRIER OFDM UWB COMMUNICATIONS SYSTEMS | [2006/31] | French: | SYSTEMES DE TRANSMISSION BUL MROF MULTIPORTEUSE | [2006/31] | Entry into regional phase | 02.05.2006 | National basic fee paid | 02.05.2006 | Designation fee(s) paid | 02.05.2006 | Examination fee paid | Examination procedure | 02.05.2006 | Examination requested [2006/31] | 28.12.2007 | Despatch of a communication from the examining division (Time limit: M04) | 07.05.2008 | Reply to a communication from the examining division | 08.09.2008 | Communication of intention to grant the patent | 15.12.2008 | Fee for grant paid | 15.12.2008 | Fee for publishing/printing paid | Opposition(s) | 12.11.2009 | No opposition filed within time limit [2010/03] | Fees paid | Renewal fee | 31.10.2006 | Renewal fee patent year 03 | 31.10.2007 | Renewal fee patent year 04 | 31.10.2008 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 11.02.2009 | BE | 11.02.2009 | CY | 11.02.2009 | CZ | 11.02.2009 | DK | 11.02.2009 | EE | 11.02.2009 | FI | 11.02.2009 | IT | 11.02.2009 | NL | 11.02.2009 | PL | 11.02.2009 | RO | 11.02.2009 | SI | 11.02.2009 | SK | 11.02.2009 | TR | 11.02.2009 | BG | 11.05.2009 | SE | 11.05.2009 | GR | 12.05.2009 | ES | 22.05.2009 | PT | 13.07.2009 | HU | 12.08.2009 | IE | 01.10.2009 | LU | 01.10.2009 | CH | 31.10.2009 | LI | 31.10.2009 | MC | 31.10.2009 | [2011/44] |
Former [2011/32] | AT | 11.02.2009 | |
BE | 11.02.2009 | ||
CZ | 11.02.2009 | ||
DK | 11.02.2009 | ||
EE | 11.02.2009 | ||
FI | 11.02.2009 | ||
IT | 11.02.2009 | ||
NL | 11.02.2009 | ||
PL | 11.02.2009 | ||
RO | 11.02.2009 | ||
SI | 11.02.2009 | ||
SK | 11.02.2009 | ||
BG | 11.05.2009 | ||
SE | 11.05.2009 | ||
GR | 12.05.2009 | ||
ES | 22.05.2009 | ||
PT | 13.07.2009 | ||
HU | 12.08.2009 | ||
IE | 01.10.2009 | ||
LU | 01.10.2009 | ||
CH | 31.10.2009 | ||
LI | 31.10.2009 | ||
MC | 31.10.2009 | ||
Former [2011/21] | AT | 11.02.2009 | |
BE | 11.02.2009 | ||
CZ | 11.02.2009 | ||
DK | 11.02.2009 | ||
EE | 11.02.2009 | ||
FI | 11.02.2009 | ||
IT | 11.02.2009 | ||
NL | 11.02.2009 | ||
PL | 11.02.2009 | ||
RO | 11.02.2009 | ||
SI | 11.02.2009 | ||
SK | 11.02.2009 | ||
BG | 11.05.2009 | ||
SE | 11.05.2009 | ||
GR | 12.05.2009 | ||
ES | 22.05.2009 | ||
PT | 13.07.2009 | ||
IE | 01.10.2009 | ||
LU | 01.10.2009 | ||
CH | 31.10.2009 | ||
LI | 31.10.2009 | ||
MC | 31.10.2009 | ||
Former [2011/15] | AT | 11.02.2009 | |
BE | 11.02.2009 | ||
CZ | 11.02.2009 | ||
DK | 11.02.2009 | ||
EE | 11.02.2009 | ||
FI | 11.02.2009 | ||
IT | 11.02.2009 | ||
NL | 11.02.2009 | ||
PL | 11.02.2009 | ||
RO | 11.02.2009 | ||
SI | 11.02.2009 | ||
SK | 11.02.2009 | ||
BG | 11.05.2009 | ||
SE | 11.05.2009 | ||
GR | 12.05.2009 | ||
ES | 22.05.2009 | ||
PT | 13.07.2009 | ||
IE | 01.10.2009 | ||
CH | 31.10.2009 | ||
LI | 31.10.2009 | ||
MC | 31.10.2009 | ||
Former [2010/46] | AT | 11.02.2009 | |
BE | 11.02.2009 | ||
CZ | 11.02.2009 | ||
DK | 11.02.2009 | ||
EE | 11.02.2009 | ||
FI | 11.02.2009 | ||
NL | 11.02.2009 | ||
PL | 11.02.2009 | ||
RO | 11.02.2009 | ||
SI | 11.02.2009 | ||
SK | 11.02.2009 | ||
BG | 11.05.2009 | ||
SE | 11.05.2009 | ||
GR | 12.05.2009 | ||
ES | 22.05.2009 | ||
PT | 13.07.2009 | ||
IE | 01.10.2009 | ||
CH | 31.10.2009 | ||
LI | 31.10.2009 | ||
MC | 31.10.2009 | ||
Former [2010/25] | AT | 11.02.2009 | |
BE | 11.02.2009 | ||
CZ | 11.02.2009 | ||
DK | 11.02.2009 | ||
EE | 11.02.2009 | ||
FI | 11.02.2009 | ||
NL | 11.02.2009 | ||
PL | 11.02.2009 | ||
RO | 11.02.2009 | ||
SI | 11.02.2009 | ||
SK | 11.02.2009 | ||
BG | 11.05.2009 | ||
SE | 11.05.2009 | ||
ES | 22.05.2009 | ||
PT | 13.07.2009 | ||
MC | 31.10.2009 | ||
Former [2010/10] | AT | 11.02.2009 | |
BE | 11.02.2009 | ||
CZ | 11.02.2009 | ||
DK | 11.02.2009 | ||
EE | 11.02.2009 | ||
FI | 11.02.2009 | ||
NL | 11.02.2009 | ||
PL | 11.02.2009 | ||
RO | 11.02.2009 | ||
SI | 11.02.2009 | ||
SK | 11.02.2009 | ||
BG | 11.05.2009 | ||
SE | 11.05.2009 | ||
ES | 22.05.2009 | ||
PT | 13.07.2009 | ||
Former [2009/51] | AT | 11.02.2009 | |
BE | 11.02.2009 | ||
CZ | 11.02.2009 | ||
DK | 11.02.2009 | ||
EE | 11.02.2009 | ||
FI | 11.02.2009 | ||
NL | 11.02.2009 | ||
PL | 11.02.2009 | ||
RO | 11.02.2009 | ||
SI | 11.02.2009 | ||
SK | 11.02.2009 | ||
SE | 11.05.2009 | ||
ES | 22.05.2009 | ||
PT | 13.07.2009 | ||
Former [2009/46] | AT | 11.02.2009 | |
BE | 11.02.2009 | ||
DK | 11.02.2009 | ||
FI | 11.02.2009 | ||
NL | 11.02.2009 | ||
PL | 11.02.2009 | ||
SI | 11.02.2009 | ||
SE | 11.05.2009 | ||
ES | 22.05.2009 | ||
Former [2009/44] | AT | 11.02.2009 | |
BE | 11.02.2009 | ||
FI | 11.02.2009 | ||
NL | 11.02.2009 | ||
PL | 11.02.2009 | ||
SI | 11.02.2009 | ||
SE | 11.05.2009 | ||
ES | 22.05.2009 | ||
Former [2009/41] | AT | 11.02.2009 | |
FI | 11.02.2009 | ||
NL | 11.02.2009 | ||
PL | 11.02.2009 | ||
SI | 11.02.2009 | ||
SE | 11.05.2009 | ||
ES | 22.05.2009 | ||
Former [2009/36] | FI | 11.02.2009 | |
NL | 11.02.2009 | ||
SI | 11.02.2009 | ||
ES | 22.05.2009 | ||
Former [2009/35] | NL | 11.02.2009 | |
ES | 22.05.2009 | Cited in | International search | [X]EP1045531 (BRITISH BROADCASTING CORP [GB]) [X] 1-14 * paragraph [0012] * * paragraphs [0022] , [0023] *; | [E]US2004228269 (BALAKRISHNAN JAIGANESH [US], et al) [E] 1,6 * paragraph [0063] * * paragraph [0066]; figure 11 ** paragraph [0068]; figure 12 *; | [X] - VANDENDORPE L, "Multitone spread spectrum multiple access communications system in a multipath Rician fading channel", IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, IEEE INC. NEW YORK, US, (199505), vol. 44, no. 2, ISSN 0018-9545, pages 327 - 337, XP002086456 [X] 1-14 * "A. Transmitted Signal" on page 328;;; figures 1,2 * * "D. Parameters" on page 329 * DOI: http://dx.doi.org/10.1109/25.385926 | [A] - ANUJ BUTRA ET AL, "Multi-band OFDM Physical Layer Proposal for IEEE 802.15 Task Group 3a", PROJECT: IEEE P802.15 WORKING GROUP FOR WIRELESS PERSONAL AREA NETWORKS (WPANS), XX, XX, (20030915), pages 1 - 69, XP002306910 [A] 1-14 * "1.1.1.1 Mathematical description of the signal" on pages 6,7 * * "1.3.13 Time-domain Spreading" on page 33 * * "1.4.1 Operating band frequencies" on pages 34-35;;; figures 14,15 * | Examination | WO2004112289 | EP1636928 |