EP1682730 - CONSTRUCTION INDUSTRY PODS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.10.2010 Database last updated on 15.11.2024 | Most recent event Tooltip | 19.10.2012 | Lapse of the patent in a contracting state New state(s): TR | published on 21.11.2012 [2012/47] | Applicant(s) | For all designated states Thin Floor Pods Limited Phelans Pharmacy, Main Street Carrigaline, County Cork / IE | [2007/36] |
Former [2006/30] | For all designated states O'Callaghan, Patrick Donal 5 Mount Ovel Rochestown Cork / IE | ||
For all designated states Lisson, Eric Ballindeasig Nohoval Cork / IE | Inventor(s) | 01 /
O'Callaghan, Patrick Donal 5 Mount Level Rochestown, Cork / IE | 02 /
Lisson, Eric Ballindeasig Nohoval, Cork / IE | [2009/35] |
Former [2006/30] | 01 /
see applicant ... | Representative(s) | McKeown, Yvonne Mary, et al MacLachlan & Donaldson 2B Clonskeagh Square Clonskeagh Road Dublin 14 / IE | [N/P] |
Former [2007/31] | McKeown, Yvonne Mary, et al MacLachlan & Donaldson 47 Merrion Square Dublin 2 / IE | ||
Former [2006/30] | Weldon, Michael James c/o John A. O'Brien & Associates, Third Floor, Duncairn House, 14 Carysfort Avenue Blackrock, Co. Dublin / IE | Application number, filing date | 04770422.6 | 22.10.2004 | [2006/30] | WO2004IE00148 | Priority number, date | IE20030000800 | 24.10.2003 Original published format: IE 030800 | [2006/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2005040515 | Date: | 06.05.2005 | Language: | EN | [2005/18] | Type: | A1 Application with search report | No.: | EP1682730 | Date: | 26.07.2006 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.05.2005 takes the place of the publication of the European patent application. | [2006/30] | Type: | B1 Patent specification | No.: | EP1682730 | Date: | 23.12.2009 | Language: | EN | [2009/52] | Search report(s) | International search report - published on: | EP | 06.05.2005 | Classification | IPC: | E04B1/348 | [2006/30] | CPC: |
E04B1/34869 (EP,US);
E04B1/348 (GB)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2006/30] | Extension states | AL | Not yet paid | HR | Not yet paid | LT | Not yet paid | LV | Not yet paid | MK | Not yet paid | Title | German: | KAPSEL FÜR DIE BAUINDUSTRIE | [2006/30] | English: | CONSTRUCTION INDUSTRY PODS | [2006/30] | French: | ENCEINTES POUR INDUSTRIE DU BATIMENT | [2009/34] |
Former [2006/30] | ENCEINTES POUR INDUSTRIE DU B TIMENT | Entry into regional phase | 22.04.2006 | National basic fee paid | 22.04.2006 | Designation fee(s) paid | 22.04.2006 | Examination fee paid | Examination procedure | 24.04.2006 | Examination requested [2006/30] | 07.11.2007 | Despatch of a communication from the examining division (Time limit: M06) | 16.05.2008 | Reply to a communication from the examining division | 09.06.2009 | Despatch of a communication from the examining division (Time limit: M04) | 07.07.2009 | Reply to a communication from the examining division | 06.08.2009 | Communication of intention to grant the patent | 10.11.2009 | Fee for grant paid | 10.11.2009 | Fee for publishing/printing paid | Opposition(s) | 24.09.2010 | No opposition filed within time limit [2010/48] | Fees paid | Renewal fee | 10.07.2006 | Renewal fee patent year 03 | 11.07.2007 | Renewal fee patent year 04 | 30.07.2008 | Renewal fee patent year 05 | 07.08.2009 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 23.12.2009 | BE | 23.12.2009 | CY | 23.12.2009 | CZ | 23.12.2009 | DK | 23.12.2009 | EE | 23.12.2009 | FI | 23.12.2009 | NL | 23.12.2009 | RO | 23.12.2009 | SE | 23.12.2009 | SI | 23.12.2009 | SK | 23.12.2009 | TR | 23.12.2009 | BG | 23.03.2010 | GR | 24.03.2010 | ES | 03.04.2010 | PT | 23.04.2010 | HU | 24.06.2010 | [2012/47] |
Former [2012/42] | AT | 23.12.2009 | |
BE | 23.12.2009 | ||
CY | 23.12.2009 | ||
CZ | 23.12.2009 | ||
DK | 23.12.2009 | ||
EE | 23.12.2009 | ||
FI | 23.12.2009 | ||
NL | 23.12.2009 | ||
RO | 23.12.2009 | ||
SE | 23.12.2009 | ||
SI | 23.12.2009 | ||
SK | 23.12.2009 | ||
BG | 23.03.2010 | ||
GR | 24.03.2010 | ||
ES | 03.04.2010 | ||
PT | 23.04.2010 | ||
HU | 24.06.2010 | ||
Former [2011/07] | AT | 23.12.2009 | |
BE | 23.12.2009 | ||
CY | 23.12.2009 | ||
CZ | 23.12.2009 | ||
DK | 23.12.2009 | ||
EE | 23.12.2009 | ||
FI | 23.12.2009 | ||
NL | 23.12.2009 | ||
RO | 23.12.2009 | ||
SE | 23.12.2009 | ||
SI | 23.12.2009 | ||
SK | 23.12.2009 | ||
BG | 23.03.2010 | ||
GR | 24.03.2010 | ||
ES | 03.04.2010 | ||
PT | 23.04.2010 | ||
Former [2010/51] | AT | 23.12.2009 | |
BE | 23.12.2009 | ||
CY | 23.12.2009 | ||
CZ | 23.12.2009 | ||
EE | 23.12.2009 | ||
FI | 23.12.2009 | ||
NL | 23.12.2009 | ||
RO | 23.12.2009 | ||
SE | 23.12.2009 | ||
SI | 23.12.2009 | ||
SK | 23.12.2009 | ||
BG | 23.03.2010 | ||
GR | 24.03.2010 | ||
ES | 03.04.2010 | ||
PT | 23.04.2010 | ||
Former [2010/39] | AT | 23.12.2009 | |
BE | 23.12.2009 | ||
CZ | 23.12.2009 | ||
EE | 23.12.2009 | ||
FI | 23.12.2009 | ||
NL | 23.12.2009 | ||
RO | 23.12.2009 | ||
SE | 23.12.2009 | ||
SI | 23.12.2009 | ||
SK | 23.12.2009 | ||
BG | 23.03.2010 | ||
ES | 03.04.2010 | ||
PT | 23.04.2010 | ||
Former [2010/38] | AT | 23.12.2009 | |
BE | 23.12.2009 | ||
CZ | 23.12.2009 | ||
EE | 23.12.2009 | ||
FI | 23.12.2009 | ||
NL | 23.12.2009 | ||
RO | 23.12.2009 | ||
SE | 23.12.2009 | ||
SI | 23.12.2009 | ||
BG | 23.03.2010 | ||
ES | 03.04.2010 | ||
PT | 23.04.2010 | ||
Former [2010/36] | AT | 23.12.2009 | |
CZ | 23.12.2009 | ||
EE | 23.12.2009 | ||
FI | 23.12.2009 | ||
NL | 23.12.2009 | ||
RO | 23.12.2009 | ||
SE | 23.12.2009 | ||
SI | 23.12.2009 | ||
BG | 23.03.2010 | ||
ES | 03.04.2010 | ||
PT | 23.04.2010 | ||
Former [2010/35] | AT | 23.12.2009 | |
EE | 23.12.2009 | ||
FI | 23.12.2009 | ||
NL | 23.12.2009 | ||
RO | 23.12.2009 | ||
SE | 23.12.2009 | ||
SI | 23.12.2009 | ||
BG | 23.03.2010 | ||
ES | 03.04.2010 | ||
PT | 23.04.2010 | ||
Former [2010/33] | AT | 23.12.2009 | |
FI | 23.12.2009 | ||
SE | 23.12.2009 | ||
SI | 23.12.2009 | ||
ES | 03.04.2010 | ||
Former [2010/30] | AT | 23.12.2009 | |
FI | 23.12.2009 | ||
SE | 23.12.2009 | ||
SI | 23.12.2009 | ||
Former [2010/23] | FI | 23.12.2009 | |
SE | 23.12.2009 | ||
SI | 23.12.2009 | ||
Former [2010/22] | FI | 23.12.2009 | |
SE | 23.12.2009 | Cited in | International search | [Y]JPH11269953 ; | [XY]EP0159976 (VER EDELSTAHLWERKE AG [AT]); | [XY]DE9402979U (DEBA MASCHINENBAU GMBH [DE]); | [Y]US5567335 (BAESSLER PETER [CH], et al); | [Y]EP1070804 (LOEFFLER ALBRECHT [DE]) |