EP1675323 - Buffer control method in a communication system [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.12.2013 Database last updated on 30.10.2024 | Most recent event Tooltip | 17.07.2015 | Lapse of the patent in a contracting state New state(s): HU | published on 19.08.2015 [2015/34] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do, 443-742 / KR | [2012/39] |
Former [2006/26] | For all designated states Samsung Electronics Co., Ltd. 416 Maetan-Dong, Yeongtong-Gu Suwon-si, Gyeonggi-Do / KR | Inventor(s) | 01 /
Han, Ki-Tae Samsung Electronics Co., Ltd. 416, Maetan-dong Yeongtong-gu Suwon-si Gyeonggi-do / KR | 02 /
Chang, Sun-Ny Samsung Electronics Co., Ltd. 416, Maetan-dong Yeongtong-gu Suwon-si Gyeonggi-do / KR | 03 /
Park, Yun-Sang Samsung Electronics Co., Ltd. 416, Maetan-dong Yeongtong-gu Suwon-si Gyeonggi-do / KR | [2013/07] |
Former [2006/26] | 01 /
Han, Ki-Tae Samsung Electronics Co., Ltd. 416, Maetan-dong Yeongtong-gu Suwon-si Gyeonggi-do / KR | ||
02 /
Chang, Sun-Ny Samsung Electronics Co., Ltd. 416, Maetan-dong Yeongtong-gu Suwon-si Gyeonggi-do / KR | |||
03 /
Park, Yun-Sang Samsung Electronics Co., Ltd. 416, Maetan-dong Yeongtong-gu Suwon-si Gyeonggi-do / KR | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstrasse 4 80802 München / DE | [N/P] |
Former [2013/07] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Leopoldstrasse 4 80802 München / DE | ||
Former [2006/26] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Maximilianstrasse 58 80538 München / DE | Application number, filing date | 05028112.0 | 21.12.2005 | [2006/26] | Priority number, date | KR20040109937 | 21.12.2004 Original published format: KR 2004109937 | [2006/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP1675323 | Date: | 28.06.2006 | Language: | EN | [2006/26] | Type: | B1 Patent specification | No.: | EP1675323 | Date: | 13.02.2013 | Language: | EN | [2013/07] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.03.2006 | Classification | IPC: | H04L12/66 | [2013/07] | CPC: |
H04L49/901 (EP,KR,US);
H04L49/90 (EP,KR,US);
H04L49/9015 (KR);
H04L27/2601 (EP,US);
H04W28/14 (EP,US)
|
Former IPC [2006/26] | H04L12/56 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2006/26] | Title | German: | Kontrollverfahren für einen Zwischenspeicher in einem Kommunikationssystem | [2006/26] | English: | Buffer control method in a communication system | [2006/26] | French: | Procédé de contrôle pour une mémoire intermédiaire dans un système de communication | [2006/26] | Examination procedure | 21.12.2005 | Examination requested [2006/26] | 11.09.2006 | Despatch of a communication from the examining division (Time limit: M06) | 27.02.2007 | Reply to a communication from the examining division | 14.06.2012 | Communication of intention to grant the patent | 22.10.2012 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 08.11.2012 | Communication of intention to grant the patent | 29.11.2012 | Fee for grant paid | 29.11.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.09.2006 | Opposition(s) | 14.11.2013 | No opposition filed within time limit [2014/04] | Fees paid | Renewal fee | 28.12.2007 | Renewal fee patent year 03 | 23.12.2008 | Renewal fee patent year 04 | 29.12.2009 | Renewal fee patent year 05 | 29.12.2010 | Renewal fee patent year 06 | 29.12.2011 | Renewal fee patent year 07 | 21.12.2012 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.12.2005 | AT | 13.02.2013 | BE | 13.02.2013 | CY | 13.02.2013 | CZ | 13.02.2013 | DK | 13.02.2013 | EE | 13.02.2013 | FI | 13.02.2013 | IT | 13.02.2013 | LT | 13.02.2013 | LV | 13.02.2013 | MC | 13.02.2013 | PL | 13.02.2013 | RO | 13.02.2013 | SE | 13.02.2013 | SI | 13.02.2013 | SK | 13.02.2013 | TR | 13.02.2013 | BG | 13.05.2013 | GR | 14.05.2013 | ES | 24.05.2013 | IS | 13.06.2013 | PT | 13.06.2013 | [2015/34] |
Former [2015/32] | AT | 13.02.2013 | |
BE | 13.02.2013 | ||
CY | 13.02.2013 | ||
CZ | 13.02.2013 | ||
DK | 13.02.2013 | ||
EE | 13.02.2013 | ||
FI | 13.02.2013 | ||
IT | 13.02.2013 | ||
LT | 13.02.2013 | ||
LV | 13.02.2013 | ||
MC | 13.02.2013 | ||
PL | 13.02.2013 | ||
RO | 13.02.2013 | ||
SE | 13.02.2013 | ||
SI | 13.02.2013 | ||
SK | 13.02.2013 | ||
TR | 13.02.2013 | ||
BG | 13.05.2013 | ||
GR | 14.05.2013 | ||
ES | 24.05.2013 | ||
IS | 13.06.2013 | ||
PT | 13.06.2013 | ||
Former [2014/38] | AT | 13.02.2013 | |
BE | 13.02.2013 | ||
CY | 13.02.2013 | ||
CZ | 13.02.2013 | ||
DK | 13.02.2013 | ||
EE | 13.02.2013 | ||
FI | 13.02.2013 | ||
IT | 13.02.2013 | ||
LT | 13.02.2013 | ||
LV | 13.02.2013 | ||
MC | 13.02.2013 | ||
PL | 13.02.2013 | ||
RO | 13.02.2013 | ||
SE | 13.02.2013 | ||
SI | 13.02.2013 | ||
SK | 13.02.2013 | ||
BG | 13.05.2013 | ||
GR | 14.05.2013 | ||
ES | 24.05.2013 | ||
IS | 13.06.2013 | ||
PT | 13.06.2013 | ||
Former [2014/03] | AT | 13.02.2013 | |
BE | 13.02.2013 | ||
CY | 13.02.2013 | ||
CZ | 13.02.2013 | ||
DK | 13.02.2013 | ||
EE | 13.02.2013 | ||
FI | 13.02.2013 | ||
IT | 13.02.2013 | ||
LT | 13.02.2013 | ||
LV | 13.02.2013 | ||
PL | 13.02.2013 | ||
RO | 13.02.2013 | ||
SE | 13.02.2013 | ||
SI | 13.02.2013 | ||
SK | 13.02.2013 | ||
BG | 13.05.2013 | ||
GR | 14.05.2013 | ||
ES | 24.05.2013 | ||
IS | 13.06.2013 | ||
PT | 13.06.2013 | ||
Former [2013/52] | AT | 13.02.2013 | |
BE | 13.02.2013 | ||
CY | 13.02.2013 | ||
CZ | 13.02.2013 | ||
DK | 13.02.2013 | ||
EE | 13.02.2013 | ||
FI | 13.02.2013 | ||
LT | 13.02.2013 | ||
LV | 13.02.2013 | ||
PL | 13.02.2013 | ||
RO | 13.02.2013 | ||
SE | 13.02.2013 | ||
SI | 13.02.2013 | ||
SK | 13.02.2013 | ||
BG | 13.05.2013 | ||
GR | 14.05.2013 | ||
ES | 24.05.2013 | ||
IS | 13.06.2013 | ||
PT | 13.06.2013 | ||
Former [2013/49] | AT | 13.02.2013 | |
BE | 13.02.2013 | ||
CZ | 13.02.2013 | ||
DK | 13.02.2013 | ||
EE | 13.02.2013 | ||
FI | 13.02.2013 | ||
LT | 13.02.2013 | ||
LV | 13.02.2013 | ||
PL | 13.02.2013 | ||
RO | 13.02.2013 | ||
SE | 13.02.2013 | ||
SI | 13.02.2013 | ||
SK | 13.02.2013 | ||
BG | 13.05.2013 | ||
GR | 14.05.2013 | ||
ES | 24.05.2013 | ||
IS | 13.06.2013 | ||
PT | 13.06.2013 | ||
Former [2013/48] | AT | 13.02.2013 | |
BE | 13.02.2013 | ||
DK | 13.02.2013 | ||
EE | 13.02.2013 | ||
FI | 13.02.2013 | ||
LT | 13.02.2013 | ||
LV | 13.02.2013 | ||
PL | 13.02.2013 | ||
SE | 13.02.2013 | ||
SI | 13.02.2013 | ||
BG | 13.05.2013 | ||
GR | 14.05.2013 | ||
ES | 24.05.2013 | ||
IS | 13.06.2013 | ||
PT | 13.06.2013 | ||
Former [2013/40] | AT | 13.02.2013 | |
BE | 13.02.2013 | ||
FI | 13.02.2013 | ||
LT | 13.02.2013 | ||
LV | 13.02.2013 | ||
PL | 13.02.2013 | ||
SE | 13.02.2013 | ||
SI | 13.02.2013 | ||
BG | 13.05.2013 | ||
GR | 14.05.2013 | ||
ES | 24.05.2013 | ||
IS | 13.06.2013 | ||
PT | 13.06.2013 | ||
Former [2013/38] | AT | 13.02.2013 | |
BE | 13.02.2013 | ||
FI | 13.02.2013 | ||
LT | 13.02.2013 | ||
LV | 13.02.2013 | ||
PL | 13.02.2013 | ||
SE | 13.02.2013 | ||
SI | 13.02.2013 | ||
BG | 13.05.2013 | ||
GR | 14.05.2013 | ||
ES | 24.05.2013 | ||
IS | 13.06.2013 | ||
Former [2013/37] | AT | 13.02.2013 | |
FI | 13.02.2013 | ||
LT | 13.02.2013 | ||
PL | 13.02.2013 | ||
SE | 13.02.2013 | ||
SI | 13.02.2013 | ||
BG | 13.05.2013 | ||
GR | 14.05.2013 | ||
ES | 24.05.2013 | ||
IS | 13.06.2013 | ||
Former [2013/36] | AT | 13.02.2013 | |
LT | 13.02.2013 | ||
PL | 13.02.2013 | ||
SE | 13.02.2013 | ||
BG | 13.05.2013 | ||
ES | 24.05.2013 | ||
IS | 13.06.2013 | ||
Former [2013/34] | LT | 13.02.2013 | |
SE | 13.02.2013 | ||
BG | 13.05.2013 | ||
IS | 13.06.2013 | ||
Former [2013/33] | LT | 13.02.2013 | Documents cited: | Search | [A]WO03042782 (RADISYS MICROWARE COMM SOFTWAR [US], et al) [A] 1-20 * figure 5 * * page 5, lines 5-19 * * page 7, lines 5-20 * * page 13, lines 13-21 * * page 23, lines 1-15 ** page 33, lines 12-19 *; | [X]WO2004043011 (WUHAN FIBERHOME NETWORKS CO LT [CN], et al) [X] 1-20 * figures 3,9,16,17 * * page 2, lines 10-25 * * page 18, lines 15-25 * * page 22, lines 1-24 * * page 53, lines 15-19 * * page 54, lines 1-7 * * page 62, lines 1-6 *; | [X]US2004153588 (KASPER CHRISTIAN D [US]) [X] 1-20 * figures 1,3,4,6,8 * * page 2, paragraphs 24,25 * * page 3, paragraph 48 * * page 4, paragraphs 48,51 * * page 6, paragraphs 72,75 * * page 7, paragraph 76 * |