| EP1624124 - Adjustable heavy girder tiedown [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.12.2012 Database last updated on 21.03.2026 | Most recent event Tooltip | 18.07.2014 | Lapse of the patent in a contracting state New state(s): HU | published on 20.08.2014 [2014/34] | Applicant(s) | For all designated states SIMPSON STRONG-TIE COMPANY, INC. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 / US | [2012/04] |
| Former [2006/06] | For all designated states SIMPSON STRONG-TIE COMPANY, INC. 4120 Dublin Boulevard, Suite 400 Dublin California 94568-3166 / US | Inventor(s) | 01 /
Gilstrap, Jeremy 5404 Sandalwood drive, Mckinney Texas 75070 / US | 02 /
Lin, Jin-Jie 4132 Camrose avenue, Livermore California 94550 / US | 03 /
Gray, Daniel M. P.O.Box 216, Mckinney Texas 75069 / US | [2006/06] | Representative(s) | Pluckrose, Anthony William BOULT WADE TENNANT Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | [N/P] |
| Former [2012/05] | Pluckrose, Anthony William Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | ||
| Former [2006/06] | Pluckrose, Anthony William BOULT WADE TENNANT, Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | Application number, filing date | 05254870.8 | 04.08.2005 | [2006/06] | Priority number, date | US20040912260 | 04.08.2004 Original published format: US 912260 | [2006/06] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP1624124 | Date: | 08.02.2006 | Language: | EN | [2006/06] | Type: | A3 Search report | No.: | EP1624124 | Date: | 28.01.2009 | [2009/05] | Type: | B1 Patent specification | No.: | EP1624124 | Date: | 01.02.2012 | Language: | EN | [2012/05] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 30.12.2008 | Classification | IPC: | E04B7/04, E04B1/26 | [2006/06] | CPC: |
E04B7/045 (EP,US);
E04B2001/2616 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2006/06] | Title | German: | Einstellbare Trägerverankerung | [2006/06] | English: | Adjustable heavy girder tiedown | [2006/06] | French: | Ancrage de poutrelle réglable | [2006/06] | Examination procedure | 14.07.2009 | Examination requested [2009/35] | 21.09.2009 | Despatch of a communication from the examining division (Time limit: M06) | 20.07.2010 | Reply to a communication from the examining division | 06.05.2011 | Communication of intention to grant the patent | 28.10.2011 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 19.12.2011 | Fee for grant paid | 19.12.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.09.2009 | Opposition(s) | 05.11.2012 | No opposition filed within time limit [2013/02] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 19.12.2011 | Request for further processing filed | 19.12.2011 | Full payment received (date of receipt of payment) Request granted | 28.12.2011 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the examination report | 20.07.2010 | Request for further processing filed | 20.07.2010 | Full payment received (date of receipt of payment) Request granted | 06.09.2010 | Decision despatched | Fees paid | Renewal fee | 28.08.2007 | Renewal fee patent year 03 | 27.08.2008 | Renewal fee patent year 04 | 24.08.2009 | Renewal fee patent year 05 | 31.08.2010 | Renewal fee patent year 06 | 26.08.2011 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.08.2005 | AT | 01.02.2012 | BE | 01.02.2012 | CY | 01.02.2012 | CZ | 01.02.2012 | DK | 01.02.2012 | EE | 01.02.2012 | FI | 01.02.2012 | IT | 01.02.2012 | LT | 01.02.2012 | LV | 01.02.2012 | NL | 01.02.2012 | PL | 01.02.2012 | RO | 01.02.2012 | SE | 01.02.2012 | SI | 01.02.2012 | SK | 01.02.2012 | TR | 01.02.2012 | BG | 01.05.2012 | GR | 02.05.2012 | ES | 12.05.2012 | IS | 01.06.2012 | PT | 01.06.2012 | IE | 04.08.2012 | LU | 04.08.2012 | CH | 31.08.2012 | LI | 31.08.2012 | MC | 31.08.2012 | [2014/34] |
| Former [2014/27] | AT | 01.02.2012 | |
| BE | 01.02.2012 | ||
| CY | 01.02.2012 | ||
| CZ | 01.02.2012 | ||
| DK | 01.02.2012 | ||
| EE | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| IT | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| RO | 01.02.2012 | ||
| SE | 01.02.2012 | ||
| SI | 01.02.2012 | ||
| SK | 01.02.2012 | ||
| TR | 01.02.2012 | ||
| BG | 01.05.2012 | ||
| GR | 02.05.2012 | ||
| ES | 12.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| IE | 04.08.2012 | ||
| LU | 04.08.2012 | ||
| CH | 31.08.2012 | ||
| LI | 31.08.2012 | ||
| MC | 31.08.2012 | ||
| Former [2014/21] | AT | 01.02.2012 | |
| BE | 01.02.2012 | ||
| CY | 01.02.2012 | ||
| CZ | 01.02.2012 | ||
| DK | 01.02.2012 | ||
| EE | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| IT | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| RO | 01.02.2012 | ||
| SE | 01.02.2012 | ||
| SI | 01.02.2012 | ||
| SK | 01.02.2012 | ||
| TR | 01.02.2012 | ||
| BG | 01.05.2012 | ||
| GR | 02.05.2012 | ||
| ES | 12.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| IE | 04.08.2012 | ||
| CH | 31.08.2012 | ||
| LI | 31.08.2012 | ||
| MC | 31.08.2012 | ||
| Former [2013/33] | AT | 01.02.2012 | |
| BE | 01.02.2012 | ||
| CY | 01.02.2012 | ||
| CZ | 01.02.2012 | ||
| DK | 01.02.2012 | ||
| EE | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| IT | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| RO | 01.02.2012 | ||
| SE | 01.02.2012 | ||
| SI | 01.02.2012 | ||
| SK | 01.02.2012 | ||
| BG | 01.05.2012 | ||
| GR | 02.05.2012 | ||
| ES | 12.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| IE | 04.08.2012 | ||
| CH | 31.08.2012 | ||
| LI | 31.08.2012 | ||
| MC | 31.08.2012 | ||
| Former [2013/22] | AT | 01.02.2012 | |
| BE | 01.02.2012 | ||
| CY | 01.02.2012 | ||
| CZ | 01.02.2012 | ||
| DK | 01.02.2012 | ||
| EE | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| IT | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| RO | 01.02.2012 | ||
| SE | 01.02.2012 | ||
| SI | 01.02.2012 | ||
| SK | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| ES | 12.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| CH | 31.08.2012 | ||
| LI | 31.08.2012 | ||
| MC | 31.08.2012 | ||
| Former [2013/20] | AT | 01.02.2012 | |
| BE | 01.02.2012 | ||
| CY | 01.02.2012 | ||
| CZ | 01.02.2012 | ||
| DK | 01.02.2012 | ||
| EE | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| IT | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| RO | 01.02.2012 | ||
| SE | 01.02.2012 | ||
| SI | 01.02.2012 | ||
| SK | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| CH | 31.08.2012 | ||
| LI | 31.08.2012 | ||
| MC | 31.08.2012 | ||
| Former [2013/16] | AT | 01.02.2012 | |
| BE | 01.02.2012 | ||
| CY | 01.02.2012 | ||
| CZ | 01.02.2012 | ||
| DK | 01.02.2012 | ||
| EE | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| IT | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| RO | 01.02.2012 | ||
| SE | 01.02.2012 | ||
| SI | 01.02.2012 | ||
| SK | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| MC | 31.08.2012 | ||
| Former [2013/07] | AT | 01.02.2012 | |
| BE | 01.02.2012 | ||
| CY | 01.02.2012 | ||
| CZ | 01.02.2012 | ||
| DK | 01.02.2012 | ||
| EE | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| IT | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| RO | 01.02.2012 | ||
| SE | 01.02.2012 | ||
| SI | 01.02.2012 | ||
| SK | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| Former [2012/50] | BE | 01.02.2012 | |
| CY | 01.02.2012 | ||
| CZ | 01.02.2012 | ||
| DK | 01.02.2012 | ||
| EE | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| IT | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| RO | 01.02.2012 | ||
| SE | 01.02.2012 | ||
| SI | 01.02.2012 | ||
| SK | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| Former [2012/49] | BE | 01.02.2012 | |
| CY | 01.02.2012 | ||
| CZ | 01.02.2012 | ||
| DK | 01.02.2012 | ||
| EE | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| RO | 01.02.2012 | ||
| SE | 01.02.2012 | ||
| SI | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| Former [2012/48] | BE | 01.02.2012 | |
| CY | 01.02.2012 | ||
| EE | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| SE | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| Former [2012/41] | BE | 01.02.2012 | |
| CY | 01.02.2012 | ||
| FI | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| Former [2012/39] | BE | 01.02.2012 | |
| FI | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| LV | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| Former [2012/37] | BE | 01.02.2012 | |
| FI | 01.02.2012 | ||
| LT | 01.02.2012 | ||
| NL | 01.02.2012 | ||
| PL | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| IS | 01.06.2012 | ||
| PT | 01.06.2012 | ||
| Former [2012/36] | LT | 01.02.2012 | |
| NL | 01.02.2012 | ||
| GR | 02.05.2012 | ||
| IS | 01.06.2012 | ||
| Former [2012/35] | LT | 01.02.2012 | |
| NL | 01.02.2012 | ||
| IS | 01.06.2012 | ||
| Former [2012/34] | LT | 01.02.2012 | |
| IS | 01.06.2012 | ||
| Former [2012/33] | LT | 01.02.2012 | Documents cited: | Search | [X] EP0357273 (BREC BUILDERS LTD et al.) [X] 1,2,8-10,31-34,39 * figure 17 * |