EP1694034 - Method to establish a peer-to-peer connection between two user agents located behind symmetric NATs [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.03.2015 Database last updated on 12.07.2024 | Most recent event Tooltip | 13.10.2017 | Lapse of the patent in a contracting state New state(s): BG, CY, HU, TR | published on 15.11.2017 [2017/46] | Applicant(s) | For all designated states ALCATEL LUCENT 148/152 route de la Reine 92100 Boulogne-Billancourt / FR | [2014/34] |
Former [2014/21] | For all designated states Alcatel Lucent 3, avenue Octave Gréard 75007 Paris / FR | ||
Former [2012/08] | For all designated states Alcatel Lucent 3 avenue Octave Gréard 75007 Paris / FR | ||
Former [2007/14] | For all designated states Alcatel Lucent 54 rue La Boétie 75008 Paris / FR | ||
Former [2006/34] | For all designated states ALCATEL 54, rue la Boétie 75008 Paris / FR | Inventor(s) | 01 /
Wahl, Stefan Stettiner Str. 8 71701 Schwieberdingen / DE | [2014/20] |
Former [2006/34] | 01 /
Whal, Stefan Stettiner Str. 8 71701 Schwieberdingen / DE | Representative(s) | Wetzel, Emmanuelle, et al Alcatel-Lucent Intellectual Property Business Group 70430 Stuttgart / DE | [N/P] |
Former [2012/24] | Wetzel, Emmanuelle, et al Alcatel-Lucent Deutschland AG Intellectual Property & Corporate Standards Lorenzstrasse 10 70435 Stuttgart / DE | ||
Former [2008/46] | Brose, Gerhard, et al Alcatel Lucent Intellectual Property & Standards 70430 Stuttgart / DE | ||
Former [2006/34] | Brose, Gerhard, et al Alcatel, Intellectual Property Department Stuttgart 70430 Stuttgart / DE | Application number, filing date | 05290348.1 | 16.02.2005 | [2006/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP1694034 | Date: | 23.08.2006 | Language: | EN | [2006/34] | Type: | B1 Patent specification | No.: | EP1694034 | Date: | 21.05.2014 | Language: | EN | [2014/21] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.08.2005 | Classification | IPC: | H04L29/12 | [2006/34] | CPC: |
H04L61/2564 (EP,US);
H04L61/00 (EP,US);
H04L61/2575 (EP,US);
H04L61/2578 (EP,US);
H04L65/1069 (EP,US);
H04L65/1101 (US);
H04L65/1104 (EP,US)
(-)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2006/34] | Title | German: | Methode zum Aufbau einer Peer-to-Peer Verbindung zwischen zwei Benutzer-Agenten die hinter symmetrischen NATs angeordnet sind | [2006/34] | English: | Method to establish a peer-to-peer connection between two user agents located behind symmetric NATs | [2006/34] | French: | Méthode pour établir une connection du type homologue entre deux agents d'utilisateur situé arrière de translateurs d'adresses de réseau symmetriques | [2006/34] | Examination procedure | 12.10.2005 | Amendment by applicant (claims and/or description) | 31.08.2006 | Examination requested [2006/42] | 28.05.2008 | Despatch of a communication from the examining division (Time limit: M04) | 18.06.2008 | Reply to a communication from the examining division | 21.01.2014 | Communication of intention to grant the patent | 08.04.2014 | Fee for grant paid | 08.04.2014 | Fee for publishing/printing paid | 08.04.2014 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.05.2008 | Opposition(s) | 24.02.2015 | No opposition filed within time limit [2015/18] | Fees paid | Renewal fee | 13.02.2007 | Renewal fee patent year 03 | 14.02.2008 | Renewal fee patent year 04 | 18.02.2009 | Renewal fee patent year 05 | 24.02.2010 | Renewal fee patent year 06 | 22.02.2011 | Renewal fee patent year 07 | 22.02.2012 | Renewal fee patent year 08 | 21.02.2013 | Renewal fee patent year 09 | 20.02.2014 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Rights in Rem or Legal Means of Execution | ID: | 01 | For: | all designated states | Date: | 10.04.2013 | [2013/40] | Lapses during opposition Tooltip | HU | 16.02.2005 | AT | 21.05.2014 | BE | 21.05.2014 | BG | 21.05.2014 | CY | 21.05.2014 | CZ | 21.05.2014 | DK | 21.05.2014 | EE | 21.05.2014 | ES | 21.05.2014 | FI | 21.05.2014 | IT | 21.05.2014 | LT | 21.05.2014 | MC | 21.05.2014 | NL | 21.05.2014 | PL | 21.05.2014 | RO | 21.05.2014 | SE | 21.05.2014 | SI | 21.05.2014 | SK | 21.05.2014 | TR | 21.05.2014 | GR | 22.08.2014 | IS | 21.09.2014 | PT | 22.09.2014 | IE | 16.02.2015 | LU | 16.02.2015 | [2017/39] |
Former [2016/07] | AT | 21.05.2014 | |
BE | 21.05.2014 | ||
CZ | 21.05.2014 | ||
DK | 21.05.2014 | ||
EE | 21.05.2014 | ||
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
IT | 21.05.2014 | ||
LT | 21.05.2014 | ||
MC | 21.05.2014 | ||
NL | 21.05.2014 | ||
PL | 21.05.2014 | ||
RO | 21.05.2014 | ||
SE | 21.05.2014 | ||
SI | 21.05.2014 | ||
SK | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
PT | 22.09.2014 | ||
IE | 16.02.2015 | ||
LU | 16.02.2015 | ||
Former [2015/46] | AT | 21.05.2014 | |
BE | 21.05.2014 | ||
CZ | 21.05.2014 | ||
DK | 21.05.2014 | ||
EE | 21.05.2014 | ||
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
IT | 21.05.2014 | ||
LT | 21.05.2014 | ||
MC | 21.05.2014 | ||
NL | 21.05.2014 | ||
PL | 21.05.2014 | ||
RO | 21.05.2014 | ||
SE | 21.05.2014 | ||
SI | 21.05.2014 | ||
SK | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
PT | 22.09.2014 | ||
LU | 16.02.2015 | ||
Former [2015/44] | AT | 21.05.2014 | |
BE | 21.05.2014 | ||
CZ | 21.05.2014 | ||
DK | 21.05.2014 | ||
EE | 21.05.2014 | ||
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
IT | 21.05.2014 | ||
LT | 21.05.2014 | ||
NL | 21.05.2014 | ||
PL | 21.05.2014 | ||
RO | 21.05.2014 | ||
SE | 21.05.2014 | ||
SI | 21.05.2014 | ||
SK | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
PT | 22.09.2014 | ||
LU | 16.02.2015 | ||
Former [2015/36] | AT | 21.05.2014 | |
BE | 21.05.2014 | ||
CZ | 21.05.2014 | ||
DK | 21.05.2014 | ||
EE | 21.05.2014 | ||
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
IT | 21.05.2014 | ||
LT | 21.05.2014 | ||
NL | 21.05.2014 | ||
PL | 21.05.2014 | ||
RO | 21.05.2014 | ||
SE | 21.05.2014 | ||
SI | 21.05.2014 | ||
SK | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
PT | 22.09.2014 | ||
Former [2015/22] | AT | 21.05.2014 | |
BE | 21.05.2014 | ||
CZ | 21.05.2014 | ||
DK | 21.05.2014 | ||
EE | 21.05.2014 | ||
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
IT | 21.05.2014 | ||
LT | 21.05.2014 | ||
NL | 21.05.2014 | ||
PL | 21.05.2014 | ||
RO | 21.05.2014 | ||
SE | 21.05.2014 | ||
SK | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
PT | 22.09.2014 | ||
Former [2015/12] | AT | 21.05.2014 | |
BE | 21.05.2014 | ||
CZ | 21.05.2014 | ||
DK | 21.05.2014 | ||
EE | 21.05.2014 | ||
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
LT | 21.05.2014 | ||
NL | 21.05.2014 | ||
PL | 21.05.2014 | ||
RO | 21.05.2014 | ||
SE | 21.05.2014 | ||
SK | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
PT | 22.09.2014 | ||
Former [2015/11] | AT | 21.05.2014 | |
BE | 21.05.2014 | ||
CZ | 21.05.2014 | ||
DK | 21.05.2014 | ||
EE | 21.05.2014 | ||
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
LT | 21.05.2014 | ||
PL | 21.05.2014 | ||
RO | 21.05.2014 | ||
SE | 21.05.2014 | ||
SK | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
PT | 22.09.2014 | ||
Former [2015/10] | AT | 21.05.2014 | |
BE | 21.05.2014 | ||
CZ | 21.05.2014 | ||
DK | 21.05.2014 | ||
EE | 21.05.2014 | ||
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
LT | 21.05.2014 | ||
PL | 21.05.2014 | ||
SE | 21.05.2014 | ||
SK | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
PT | 22.09.2014 | ||
Former [2015/08] | AT | 21.05.2014 | |
BE | 21.05.2014 | ||
DK | 21.05.2014 | ||
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
LT | 21.05.2014 | ||
PL | 21.05.2014 | ||
SE | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
PT | 22.09.2014 | ||
Former [2015/02] | AT | 21.05.2014 | |
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
LT | 21.05.2014 | ||
PL | 21.05.2014 | ||
SE | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
PT | 22.09.2014 | ||
Former [2014/51] | AT | 21.05.2014 | |
ES | 21.05.2014 | ||
FI | 21.05.2014 | ||
LT | 21.05.2014 | ||
PL | 21.05.2014 | ||
SE | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
Former [2014/50] | ES | 21.05.2014 | |
FI | 21.05.2014 | ||
LT | 21.05.2014 | ||
PL | 21.05.2014 | ||
SE | 21.05.2014 | ||
GR | 22.08.2014 | ||
IS | 21.09.2014 | ||
Former [2014/49] | FI | 21.05.2014 | |
LT | 21.05.2014 | ||
IS | 21.09.2014 | ||
Former [2014/48] | LT | 21.05.2014 | Documents cited: | Search | [X]EP1185069 (NORTEL NETWORKS LTD [CA]) [X] 1,12 * the whole document *; | [Y]US2002085561 (CHOI JEONG-HYUN [KR], et al) [Y] 11 * paragraph [0031]; figures 6,7,8a * * paragraph [0050] - paragraph [0069] *; | [A]US2003118002 (BRADD PATRICK [GB], et al) [A] 11* paragraph [0040] - paragraph [0049]; figures 4,5 *; | [A]US2004177158 (BAUCH DAVID JAMES [US], et al) [A] 3 * paragraph [0110] - paragraph [0118]; figures 11-13 *; | [Y]WO2004088923 (ERICSSON TELEFON AB L M [SE], et al) [Y] 3 * page 13, line 1 - page 17, line 19 *; | [XY] - J. ROSENBERG; R. MAHY; S. SEN, "NAT and Firewall Scenarios and Solutions for SIP", DRAFT-IETF-SIPPING-NAT-SCENARIOS-00.TXT, IETF, GENEVA, (20020624), XP015003441 [X] 1,2,4-10,12 * Complete Chapter 5.2 "Solution II: External B2BUAWM"; page 46 - page 52 * [Y] 3,11 | [A] - STIEMERLING NEC H TSCHOFENIG SIEMENS M MARTIN NEC C AOUN NORTEL NETWORKS M, "NAT/Firewall NSIS Signaling Layer Protocol (NSLP)", IETF STANDARD-WORKING-DRAFT, INTERNET ENGINEERING TASK FORCE, IETF, CH, (20040216), vol. nsis, no. 1, ISSN 0000-0004, XP015024465 [A] 3 * page 5 - page 10; figure 1 * * Chapter 5.1 until (including) 5.3.4; page 35 - page 39 * |