EP1751861 - POWER CONVERTER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.06.2017 Database last updated on 20.12.2024 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Faiveley Transport Immeuble Le Delage Hall Parc- Bâtiment 6A 3, rue du 19 mars 1962 92230 Gennevilliers / FR | [2012/01] |
Former [2011/49] | For all designated states Faiveley Transport Immeuble Le Delage Hall Parc Bat - 3, rue du 19 mars 1962 92230 Gennevilliers / FR | ||
Former [2010/20] | For all designated states FAIVELEY TRANSPORT 143 Boulevard Anatole France, Carrefour Pleyel 93200 Saint-Denis / FR | ||
Former [2007/07] | For all designated states FAIVELEY TRANSPORT 143 Boulevard Anatole France 93000 Saint-Denis / FR | Inventor(s) | 01 /
COYAUD, Martin 49 bis, rue de Sébastopol 37000 Tours / FR | [2016/34] |
Former [2007/07] | 01 /
COYAUD, Martin 49 bis, rue de Sébastopol F-37000 Tours / FR | Representative(s) | Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | [2012/49] |
Former [2007/07] | Callon de Lamarck, Jean-Robert, et al Cabinet Régimbeau 20, rue de Chazelles 75847 Paris cedex 17 / FR | Application number, filing date | 05762435.5 | 26.04.2005 | [2007/07] | WO2005FR01026 | Priority number, date | FR20040004878 | 06.05.2004 Original published format: FR 0404878 | [2007/07] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2005122399 | Date: | 22.12.2005 | Language: | FR | [2005/51] | Type: | A1 Application with search report | No.: | EP1751861 | Date: | 14.02.2007 | Language: | FR | The application published by WIPO in one of the EPO official languages on 22.12.2005 takes the place of the publication of the European patent application. | [2007/07] | Type: | B1 Patent specification | No.: | EP1751861 | Date: | 24.08.2016 | Language: | FR | [2016/34] | Search report(s) | International search report - published on: | EP | 22.12.2005 | Classification | IPC: | H03K17/0814, H02M3/335 | [2007/07] | CPC: |
H02M1/34 (EP);
H02M3/335 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2016/34] |
Former [2007/07] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | STROMWANDLER | [2007/07] | English: | POWER CONVERTER | [2007/07] | French: | CONVERTISSEUR DE PUISSANCE | [2007/07] | Entry into regional phase | 30.11.2006 | National basic fee paid | 30.11.2006 | Designation fee(s) paid | 30.11.2006 | Examination fee paid | Examination procedure | 30.11.2006 | Examination requested [2007/07] | 06.09.2010 | Despatch of a communication from the examining division (Time limit: M04) | 15.12.2010 | Reply to a communication from the examining division | 05.04.2016 | Communication of intention to grant the patent | 20.06.2016 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 20.06.2016 | Fee for grant paid | 20.06.2016 | Fee for publishing/printing paid | 18.07.2016 | Information about intention to grant a patent | 18.07.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.09.2010 | Opposition(s) | 26.05.2017 | No opposition filed within time limit [2017/31] | Fees paid | Renewal fee | 30.11.2006 | Renewal fee patent year 03 | 28.03.2008 | Renewal fee patent year 04 | 14.04.2009 | Renewal fee patent year 05 | 26.03.2010 | Renewal fee patent year 06 | 11.04.2011 | Renewal fee patent year 07 | 29.03.2012 | Renewal fee patent year 08 | 22.07.2013 | Renewal fee patent year 09 | 29.04.2014 | Renewal fee patent year 10 | 09.04.2015 | Renewal fee patent year 11 | 31.03.2016 | Renewal fee patent year 12 | Penalty fee | Additional fee for renewal fee | 30.04.2013 | 09   M06   Fee paid on   22.07.2013 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.04.2005 | AT | 24.08.2016 | CY | 24.08.2016 | CZ | 24.08.2016 | DK | 24.08.2016 | EE | 24.08.2016 | FI | 24.08.2016 | LT | 24.08.2016 | MC | 24.08.2016 | NL | 24.08.2016 | RO | 24.08.2016 | SE | 24.08.2016 | SI | 24.08.2016 | SK | 24.08.2016 | TR | 24.08.2016 | BG | 24.11.2016 | GR | 25.11.2016 | IS | 24.12.2016 | PT | 26.12.2016 | IE | 26.04.2017 | LU | 26.04.2017 | [2020/33] |
Former [2020/15] | HU | 26.04.2005 | |
AT | 24.08.2016 | ||
CY | 24.08.2016 | ||
CZ | 24.08.2016 | ||
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
FI | 24.08.2016 | ||
LT | 24.08.2016 | ||
MC | 24.08.2016 | ||
NL | 24.08.2016 | ||
RO | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
TR | 24.08.2016 | ||
BG | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
IE | 26.04.2017 | ||
LU | 26.04.2017 | ||
Former [2019/46] | HU | 26.04.2005 | |
AT | 24.08.2016 | ||
CY | 24.08.2016 | ||
CZ | 24.08.2016 | ||
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
FI | 24.08.2016 | ||
LT | 24.08.2016 | ||
MC | 24.08.2016 | ||
NL | 24.08.2016 | ||
RO | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
BG | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
IE | 26.04.2017 | ||
LU | 26.04.2017 | ||
Former [2019/31] | HU | 26.04.2005 | |
AT | 24.08.2016 | ||
CZ | 24.08.2016 | ||
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
FI | 24.08.2016 | ||
LT | 24.08.2016 | ||
MC | 24.08.2016 | ||
NL | 24.08.2016 | ||
RO | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
BG | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
IE | 26.04.2017 | ||
LU | 26.04.2017 | ||
Former [2018/23] | AT | 24.08.2016 | |
CZ | 24.08.2016 | ||
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
FI | 24.08.2016 | ||
LT | 24.08.2016 | ||
MC | 24.08.2016 | ||
NL | 24.08.2016 | ||
RO | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
BG | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
IE | 26.04.2017 | ||
LU | 26.04.2017 | ||
Former [2018/14] | AT | 24.08.2016 | |
CZ | 24.08.2016 | ||
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
FI | 24.08.2016 | ||
LT | 24.08.2016 | ||
MC | 24.08.2016 | ||
NL | 24.08.2016 | ||
RO | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
BG | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
LU | 26.04.2017 | ||
Former [2018/06] | AT | 24.08.2016 | |
CZ | 24.08.2016 | ||
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
FI | 24.08.2016 | ||
LT | 24.08.2016 | ||
MC | 24.08.2016 | ||
NL | 24.08.2016 | ||
RO | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
BG | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/37] | AT | 24.08.2016 | |
CZ | 24.08.2016 | ||
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
FI | 24.08.2016 | ||
LT | 24.08.2016 | ||
NL | 24.08.2016 | ||
RO | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
BG | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/32] | AT | 24.08.2016 | |
CZ | 24.08.2016 | ||
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
FI | 24.08.2016 | ||
LT | 24.08.2016 | ||
NL | 24.08.2016 | ||
RO | 24.08.2016 | ||
SE | 24.08.2016 | ||
SK | 24.08.2016 | ||
BG | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/12] | AT | 24.08.2016 | |
FI | 24.08.2016 | ||
LT | 24.08.2016 | ||
NL | 24.08.2016 | ||
SE | 24.08.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/10] | FI | 24.08.2016 | |
LT | 24.08.2016 | ||
NL | 24.08.2016 | ||
SE | 24.08.2016 | ||
Former [2017/09] | FI | 24.08.2016 | |
LT | 24.08.2016 | ||
NL | 24.08.2016 | ||
Former [2017/07] | LT | 24.08.2016 | Cited in | International search | [DY]EP1231704 (FAIVELEY TRANSP) [DY] 1-7 * the whole document *; | [A]US5379206 (DAVIDSON CHRISTOPHER D) [A] 1-7 * abstract *; | [A]AT386497B (SCHRACK ELEKTRONIK AG ; SCHRACK ELEKTRONIK AG (0W)) [A] 1-7 * figure 1a *; | [A]US6477064 (WENG DAFENG ET AL) [A] 1-7 * figure 3 *; | [A]US6501194 (JIANG YIMIN ET AL) [A] 1-7 * abstract * | [Y] - TARDIFF D ET AL, "A summary of resonant snubber circuits for transistors and GTOs", CONFERENCE RECORD OF THE IAS, SAN DIEGO OCT. 1-5 1989, NEW YORK, US, (19891001), vol. 24, pages 1176 - 1180, XP010091002 [Y] 1-7 * page 1177 - page 1177; figure 3 * |