EP1776776 - UPLINK TRANSMISSION POWER CONTROL IN WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.08.2017 Database last updated on 18.11.2024 | Most recent event Tooltip | 06.03.2020 | Lapse of the patent in a contracting state New state(s): TR | published on 08.04.2020 [2020/15] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | [2016/40] |
Former [2016/27] | For all designated states LG Electronics Inc. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | ||
Former [2007/17] | For all designated states LG Electronics Inc. 20, Yoido-dong Yongdungpo-gu Seoul 150-721 / KR | Inventor(s) | 01 /
KIM, Bong Hoe@c/o LG Institute Hogye 1(il)-dong, Dongan-gu Anyang-si, Gyeonggi-do 431-749 / KR | 02 /
AHN, Joon Kui, @108-1505 Gwanak Hyundai Apt. Sangdo 5(o)-dong Dongjak-gu Seoul, 156-781 / KR | 03 /
KIM, Hak Seong, @c/o LG Institute Hogye 1 (il)-dong, Dongan-gu, Anyang-si Gyeonggi-do, KOREA / KR | 04 /
ROH, Dong Wook, @103-1602 Woobang Apt. Sillim 4(sa)-dong, Gwanak-gu Seoul, 151-014 / KR | 05 /
SEO, Dong Youn 233-13 Nonhyeon 2(i)-dong Gangnam-gu Seoul, 135-012 / KR | 06 /
WON, Seung Hwan 622-201 Jugong Apt., 6 Danji Byeoryang-dong Gwacheon-si, Gyeonggi-do, 427-708 / KR | [2016/40] |
Former [2007/51] | 01 /
KIM, Bong Hoe c/o LG Institute Hogye 1(il)-dong, Dongan-gu Anyang-si, Gyeonggi-do 431-749 / KR | ||
02 /
AHN, Joon Kui, 108-1505 Gwanak Hyundai Apt. Sangdo 5(o)-dong, Dongjak-gu Seoul, 156-781 / KR | |||
03 /
KIM, Hak Seong, c/o LG Institute Hogye 1 (il)-dong, Dongan-gu, Anyang-si Gyeonggi-do, KOREA / KR | |||
04 /
ROH, Dong Wook, 103-1602 Woobang Apt. Sillim 4(sa)-dong, Gwanak-gu Seoul, 151-014 / KR | |||
05 /
SEO, Dong Youn 233-13 Nonhyeon 2(i)-dong, Gangnam-gu Seoul, 135-012 / KR | |||
06 /
WON, Seung Hwan 622-201 Jugong Apt., 6 Danji, Byeoryang-dong Gwacheon-si, Gyeonggi-do, 427-708 / KR | |||
Former [2007/38] | 01 /
KIM, Bong Hoe c/o LG Institute Hogye 1(il)-dong, Dongan-gu Anyang-si, Gyeonggi-do / KR | ||
02 /
AHN, Joon Kui, 108-1505 Gwanak Hyundai Apt. Sangdo 5(o)-dong, Dongjak-gu Seoul, 156-781 / KR | |||
03 /
KIM, Hak Seong, c/o LG Institute Hogye 1 (il)-dong, Dongan-gu, Anyang-si Gyeonggi-do, KOREA / KR | |||
04 /
ROH, Dong Wook, 103-1602 Woobang Apt. Sillim 4(sa)-dong, Gwanak-gu Seoul, 151-014 / KR | |||
05 /
SEO, Dong Youn 233-13 Nonhyeon 2(i)-dong, Gangnam-gu Seoul, 135-012 / KR | |||
06 /
WON, Seung Hwan 622-201 Jugong Apt., 6 Danji, Byeoryang-dong Gwacheon-si, Gyeonggi-do, 427-708 / KR | |||
Former [2007/29] | 01 /
KIM, Bong Hoe 103-105 Taeyeong Apt., Bono-dong, Sangnok-gu Ansan-si, Gyeonggi-do, 426-180 / KR | ||
02 /
AHN, Joon Kui, 108-1505 Gwanak Hyundai Apt. Sangdo 5(o)-dong, Dongjak-gu Seoul, 156-781 / KR | |||
03 /
KIM, Hak Seong, c/o LG Institute Hogye 1 (il)-dong, Dongan-gu, Anyang-si Gyeonggi-do, KOREA / KR | |||
04 /
ROH, Dong Wook, 103-1602 Woobang Apt. Sillim 4(sa)-dong, Gwanak-gu Seoul, 151-014 / KR | |||
05 /
SEO, Dong Youn 233-13 Nonhyeon 2(i)-dong, Gangnam-gu Seoul, 135-012 / KR | |||
06 /
WON, Seung Hwan 622-201 Jugong Apt., 6 Danji, Byeoryang-dong Gwacheon-si, Gyeonggi-do, 427-708 / KR | |||
Former [2007/17] | 01 /
KIM, Bong Hoe 103-105 Taeyeong Apt., Bono-dong, Sangnok-gu Ansan-si, Gyeonggi-do, 426-180 / KR | ||
02 /
AHN, Joon Kui, 108-1505 Gwanak Hyundai Apt. Sangdo 5(o)-dong, Dongjak-gu Seoul, 156-781 / KR | |||
03 /
KIM, Hak Seong, 111-1501 Daewoo Apt. Bongcheon 3(sam)-dong, Gwanak-gu Seoul, 151-053 / KR | |||
04 /
ROH, Dong Wook, 103-1602 Woobang Apt. Sillim 4(sa)-dong, Gwanak-gu Seoul, 151-014 / KR | |||
05 /
SEO, Dong Youn 233-13 Nonhyeon 2(i)-dong, Gangnam-gu Seoul, 135-012 / KR | |||
06 /
WON, Seung Hwan 622-201 Jugong Apt., 6 Danji, Byeoryang-dong Gwacheon-si, Gyeonggi-do, 427-708 / KR | Representative(s) | Ter Meer Steinmeister & Partner Patentanwälte mbB Nymphenburger Straße 4 80335 München / DE | [2016/40] |
Former [2007/17] | Urner, Peter ter Meer Steinmeister & Partner GbR Mauerkircherstrasse 45 D-81679 München / DE | Application number, filing date | 05771061.8 | 11.08.2005 | [2007/17] | WO2005KR02608 | Priority number, date | KR20040063124 | 11.08.2004 Original published format: KR 2004063124 | [2007/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2006016776 | Date: | 16.02.2006 | Language: | EN | [2006/07] | Type: | A2 Application without search report | No.: | EP1776776 | Date: | 25.04.2007 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.02.2006 takes the place of the publication of the European patent application. | [2007/17] | Type: | B1 Patent specification | No.: | EP1776776 | Date: | 05.10.2016 | Language: | EN | [2016/40] | Search report(s) | International search report - published on: | AT | 07.12.2006 | (Supplementary) European search report - dispatched on: | EP | 21.02.2012 | Classification | IPC: | H04B7/005, H04W4/00 | [2012/14] | CPC: |
H04W52/146 (EP,KR,US);
H04W36/18 (KR);
H04W52/267 (EP,KR,US);
H04W52/38 (EP,KR,US);
H04W52/40 (EP,KR,US);
H04W52/44 (EP,KR,US)
|
Former IPC [2007/17] | H04B7/005, H04Q7/38 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2016/40] |
Former [2007/17] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | AUFWÄRTSSTRECKEN-SENDELEISTUNGSREGELUNG IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM | [2007/17] | English: | UPLINK TRANSMISSION POWER CONTROL IN WIRELESS COMMUNICATION SYSTEM | [2007/17] | French: | COMMANDE DE PUISSANCE DE TRANSMISSION DE LIAISON MONTANTE DANS UN SYSTEME DE COMMUNICATION SANS FIL | [2007/17] | Entry into regional phase | 06.02.2007 | National basic fee paid | 06.02.2007 | Search fee paid | 06.02.2007 | Designation fee(s) paid | 06.02.2007 | Examination fee paid | Examination procedure | 06.02.2007 | Examination requested [2007/17] | 19.09.2012 | Amendment by applicant (claims and/or description) | 28.08.2014 | Despatch of a communication from the examining division (Time limit: M04) | 05.01.2015 | Reply to a communication from the examining division | 17.05.2016 | Communication of intention to grant the patent | 25.08.2016 | Fee for grant paid | 25.08.2016 | Fee for publishing/printing paid | 25.08.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.08.2014 | Opposition(s) | 06.07.2017 | No opposition filed within time limit [2017/37] | Fees paid | Renewal fee | 06.02.2007 | Renewal fee patent year 03 | 27.03.2008 | Renewal fee patent year 04 | 17.08.2009 | Renewal fee patent year 05 | 23.08.2010 | Renewal fee patent year 06 | 26.08.2011 | Renewal fee patent year 07 | 23.08.2012 | Renewal fee patent year 08 | 23.08.2013 | Renewal fee patent year 09 | 25.08.2014 | Renewal fee patent year 10 | 20.08.2015 | Renewal fee patent year 11 | 22.08.2016 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.08.2005 | AT | 05.10.2016 | BE | 05.10.2016 | CY | 05.10.2016 | CZ | 05.10.2016 | DK | 05.10.2016 | EE | 05.10.2016 | ES | 05.10.2016 | FI | 05.10.2016 | IT | 05.10.2016 | LT | 05.10.2016 | LV | 05.10.2016 | MC | 05.10.2016 | PL | 05.10.2016 | RO | 05.10.2016 | SE | 05.10.2016 | SI | 05.10.2016 | SK | 05.10.2016 | TR | 05.10.2016 | BG | 05.01.2017 | GR | 06.01.2017 | IS | 05.02.2017 | PT | 06.02.2017 | [2020/15] |
Former [2019/46] | HU | 11.08.2005 | |
AT | 05.10.2016 | ||
BE | 05.10.2016 | ||
CY | 05.10.2016 | ||
CZ | 05.10.2016 | ||
DK | 05.10.2016 | ||
EE | 05.10.2016 | ||
ES | 05.10.2016 | ||
FI | 05.10.2016 | ||
IT | 05.10.2016 | ||
LT | 05.10.2016 | ||
LV | 05.10.2016 | ||
MC | 05.10.2016 | ||
PL | 05.10.2016 | ||
RO | 05.10.2016 | ||
SE | 05.10.2016 | ||
SI | 05.10.2016 | ||
SK | 05.10.2016 | ||
BG | 05.01.2017 | ||
GR | 06.01.2017 | ||
IS | 05.02.2017 | ||
PT | 06.02.2017 | ||
Former [2019/31] | HU | 11.08.2005 | |
AT | 05.10.2016 | ||
BE | 05.10.2016 | ||
CZ | 05.10.2016 | ||
DK | 05.10.2016 | ||
EE | 05.10.2016 | ||
ES | 05.10.2016 | ||
FI | 05.10.2016 | ||
IT | 05.10.2016 | ||
LT | 05.10.2016 | ||
LV | 05.10.2016 | ||
MC | 05.10.2016 | ||
PL | 05.10.2016 | ||
RO | 05.10.2016 | ||
SE | 05.10.2016 | ||
SI | 05.10.2016 | ||
SK | 05.10.2016 | ||
BG | 05.01.2017 | ||
GR | 06.01.2017 | ||
IS | 05.02.2017 | ||
PT | 06.02.2017 | ||
Former [2018/18] | AT | 05.10.2016 | |
BE | 05.10.2016 | ||
CZ | 05.10.2016 | ||
DK | 05.10.2016 | ||
EE | 05.10.2016 | ||
ES | 05.10.2016 | ||
FI | 05.10.2016 | ||
IT | 05.10.2016 | ||
LT | 05.10.2016 | ||
LV | 05.10.2016 | ||
MC | 05.10.2016 | ||
PL | 05.10.2016 | ||
RO | 05.10.2016 | ||
SE | 05.10.2016 | ||
SI | 05.10.2016 | ||
SK | 05.10.2016 | ||
BG | 05.01.2017 | ||
GR | 06.01.2017 | ||
IS | 05.02.2017 | ||
PT | 06.02.2017 | ||
Former [2017/52] | AT | 05.10.2016 | |
BE | 05.10.2016 | ||
CZ | 05.10.2016 | ||
DK | 05.10.2016 | ||
EE | 05.10.2016 | ||
ES | 05.10.2016 | ||
FI | 05.10.2016 | ||
IT | 05.10.2016 | ||
LT | 05.10.2016 | ||
LV | 05.10.2016 | ||
PL | 05.10.2016 | ||
RO | 05.10.2016 | ||
SE | 05.10.2016 | ||
SI | 05.10.2016 | ||
SK | 05.10.2016 | ||
BG | 05.01.2017 | ||
GR | 06.01.2017 | ||
IS | 05.02.2017 | ||
PT | 06.02.2017 | ||
Former [2017/38] | AT | 05.10.2016 | |
BE | 05.10.2016 | ||
CZ | 05.10.2016 | ||
DK | 05.10.2016 | ||
EE | 05.10.2016 | ||
ES | 05.10.2016 | ||
FI | 05.10.2016 | ||
IT | 05.10.2016 | ||
LT | 05.10.2016 | ||
LV | 05.10.2016 | ||
PL | 05.10.2016 | ||
RO | 05.10.2016 | ||
SE | 05.10.2016 | ||
SK | 05.10.2016 | ||
BG | 05.01.2017 | ||
GR | 06.01.2017 | ||
IS | 05.02.2017 | ||
PT | 06.02.2017 | ||
Former [2017/37] | AT | 05.10.2016 | |
BE | 05.10.2016 | ||
CZ | 05.10.2016 | ||
DK | 05.10.2016 | ||
EE | 05.10.2016 | ||
ES | 05.10.2016 | ||
FI | 05.10.2016 | ||
IT | 05.10.2016 | ||
LT | 05.10.2016 | ||
LV | 05.10.2016 | ||
PL | 05.10.2016 | ||
RO | 05.10.2016 | ||
SE | 05.10.2016 | ||
SK | 05.10.2016 | ||
GR | 06.01.2017 | ||
IS | 05.02.2017 | ||
PT | 06.02.2017 | ||
Former [2017/36] | AT | 05.10.2016 | |
BE | 05.10.2016 | ||
CZ | 05.10.2016 | ||
DK | 05.10.2016 | ||
EE | 05.10.2016 | ||
ES | 05.10.2016 | ||
FI | 05.10.2016 | ||
LT | 05.10.2016 | ||
LV | 05.10.2016 | ||
PL | 05.10.2016 | ||
RO | 05.10.2016 | ||
SE | 05.10.2016 | ||
SK | 05.10.2016 | ||
GR | 06.01.2017 | ||
IS | 05.02.2017 | ||
PT | 06.02.2017 | ||
Former [2017/35] | AT | 05.10.2016 | |
BE | 05.10.2016 | ||
CZ | 05.10.2016 | ||
DK | 05.10.2016 | ||
EE | 05.10.2016 | ||
ES | 05.10.2016 | ||
FI | 05.10.2016 | ||
LT | 05.10.2016 | ||
LV | 05.10.2016 | ||
PL | 05.10.2016 | ||
RO | 05.10.2016 | ||
SE | 05.10.2016 | ||
GR | 06.01.2017 | ||
IS | 05.02.2017 | ||
PT | 06.02.2017 | ||
Former [2017/34] | AT | 05.10.2016 | |
BE | 05.10.2016 | ||
CZ | 05.10.2016 | ||
DK | 05.10.2016 | ||
ES | 05.10.2016 | ||
FI | 05.10.2016 | ||
LT | 05.10.2016 | ||
LV | 05.10.2016 | ||
PL | 05.10.2016 | ||
SE | 05.10.2016 | ||
GR | 06.01.2017 | ||
IS | 05.02.2017 | ||
PT | 06.02.2017 | ||
Former [2017/26] | AT | 05.10.2016 | |
BE | 05.10.2016 | ||
ES | 05.10.2016 | ||
FI | 05.10.2016 | ||
LT | 05.10.2016 | ||
LV | 05.10.2016 | ||
PL | 05.10.2016 | ||
SE | 05.10.2016 | ||
GR | 06.01.2017 | ||
IS | 05.02.2017 | ||
PT | 06.02.2017 | ||
Former [2017/12] | LV | 05.10.2016 | Documents cited: | Search | [XI]WO03017525 (ERICSSON TELEFON AB L M [SE]) [X] 9,20,31,37 * abstract * * claims 1,9,22,77 * [I] 1-39; | [A]WO03088519 (HUAWEI TECH CO LTD [CN], et al) [A] 1-39 * abstract * * figure 1 * * claims 1-3 *; | [A] - "UL Power Control for HSDPA", 3RD GENERATION PARTNERSHIP PROJECT (3GPP); TECHNICALSPECIFICATION GROUP (TSG) RADIO ACCESS NETWORK (RAN); WORKINGGROUP 1 (WG1), XX, XX, (20011119), no. 22, pages 1 - 4, XP002229769 [A] 1-39 * page 2 * | [A] - "HS-DPCCH Power Control in Soft-Handoff", 3RD GENERATION PARTNERSHIP PROJECT (3GPP); TECHNICALSPECIFICATION GROUP (TSG) RADIO ACCESS NETWORK (RAN); WORKINGGROUP 1 (WG1), XX, XX, (20020513), no. 26, pages 1 - 12, XP002229771 [A] 1-39 * Section 2.0; page 2 * | International search | [X]WO0147146 (ERICSSON TELEFON AB L M [SE]); | [X] - TORNQVIST D. ET AL, "Transmission timing - a control approach to distributed uplink scheduling in WCDMA.", PROCEEDINGS OF THE 2004 AMERICAN CONTROL CONFERENCE, BOSTON, MA, PISCATAWAY, NJ, IEEE, BOSTON, USA, (20040630), vol. 2, pages 1667 - 1672, XP010763128 | Examination | - NUAYMI L, "Association of power control and data rate selection in WCDMA", PERSONAL, INDOOR AND MOBILE RADIO COMMUNICATIONS, 2003. PIMRC 2003. 14TH IEEE PROCEEDINGS ON SEPT. 7-10, 2003, IEEE, PISCATAWAY, NJ, USA, (20030907), vol. 1, doi:10.1109/PIMRC.2003.1264282, ISBN 978-0-7803-7822-3, pages 301 - 305, XP010681606 DOI: http://dx.doi.org/10.1109/PIMRC.2003.1264282 | by applicant | WO03017525 |