blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1689127

EP1689127 - Method and apparatus for operation of a terminal based on relative grant of a non-serving base station [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.02.2014
Database last updated on 14.09.2024
Most recent event   Tooltip15.07.2016Lapse of the patent in a contracting state
New state(s): TR
published on 17.08.2016  [2016/33]
Applicant(s)For all designated states
Alcatel Lucent
3, avenue Octave Gréard
75007 Paris / FR
[2013/16]
Former [2012/08]For all designated states
Alcatel Lucent
3 avenue Octave Gréard
75007 Paris / FR
Former [2007/15]For all designated states
Alcatel Lucent
54 rue La Boétie
75008 Paris / FR
Former [2006/32]For all designated states
Alcatel
54, rue La Boétie
75008 Paris / FR
Inventor(s)01 / Yang, Tao
Alcatel Shanghai Bell
388, Ningqiao Road
Pudong Jinqiao, Shanghai 201206 / CN
02 / Lu, Ning
Alcatel Shanghai Bell
388, Ningqiao Road
Pudong Jinqiao, Shanghai 201206 / CN
03 / Zhu, Xueqing
Alcatel Shanghai Bell
388, Ningqiao Road
Pudong Jinqiao, Shangahi 201206 / CN
04 / You, Mingli
Alcatel Shanghai Bell
388, Ningqiao Road
Pudong Jinqiao, Shanghai 201206 / CN
05 / Luo, Zhigang
Alcatel Shanghai Bell
388, Ningqiao Road
Pudong Jinqiao, Shanghai 201206 / CN
 [2013/16]
Former [2006/32]01 / Yang, Tao
Alcatel Shanghai Bell, 388, Ningqiao Road
Pudong Jinqiao, Shanghai 201206 / CN
02 / Lu, Ning
Alcatel Shanghai Bell, 388, Ningqiao Road
Pudong Jinqiao, Shanghai 201206 / CN
03 / Zhu, Xueqing
Alcatel Shanghai Bell, 388, Ningqiao Road
Pudong Jinqiao, Shangahi 201206 / CN
04 / You, Mingli
Alcatel Shanghai Bell, 388, Ningqiao Road
Pudong Jinqiao, Shanghai 201206 / CN
05 / Luo, Zhigang
Alcatel Shanghai Bell, 388, Ningqiao Road
Pudong Jinqiao, Shanghai 201206 / CN
Representative(s)Wetzel, Emmanuelle, et al
Alcatel-Lucent
Intellectual Property Business Group
70430 Stuttgart / DE
[N/P]
Former [2013/01]Wetzel, Emmanuelle, et al
Alcatel-Lucent Deutschland AG
Intellectual Property & Standards
70430 Stuttgart / DE
Former [2006/32]Dreiss, Fuhlendorf, Steimle & Becker
Patentanwälte, Postfach 10 37 62
70032 Stuttgart / DE
Application number, filing date06001916.331.01.2006
[2006/32]
Priority number, dateCN200512390307.02.2005         Original published format: CN200510023903
[2006/32]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1689127
Date:09.08.2006
Language:EN
[2006/32]
Type: B1 Patent specification 
No.:EP1689127
Date:17.04.2013
Language:EN
[2013/16]
Search report(s)(Supplementary) European search report - dispatched on:EP12.04.2006
ClassificationIPC:H04W72/12
[2010/12]
CPC:
H04L1/1887 (EP,US); H04W52/286 (EP,US); H04W72/23 (EP,US);
H04L1/1812 (EP,US); H04W36/18 (EP,US); H04W52/146 (EP,US);
H04W52/40 (EP,US); H04W52/48 (EP,US) (-)
Former IPC [2006/32]H04L12/28, H04L12/56
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2006/32]
TitleGerman:Verfahren und Vorrichtung zur Steuerung von einem Endgerät aufgrund von relativen Bewilligungen einer nicht-bedienenden Basisstation[2006/32]
English:Method and apparatus for operation of a terminal based on relative grant of a non-serving base station[2006/32]
French:Méthode et appareil pour faire fonctionner un terminal sur la base des concessions relatives d'une station de base non-serveur[2006/32]
Examination procedure18.10.2006Examination requested  [2006/48]
04.12.2006Despatch of a communication from the examining division (Time limit: M06)
05.06.2007Reply to a communication from the examining division
09.11.2012Communication of intention to grant the patent
06.03.2013Fee for grant paid
06.03.2013Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  04.12.2006
Opposition(s)20.01.2014No opposition filed within time limit [2014/13]
Fees paidRenewal fee
14.01.2008Renewal fee patent year 03
14.01.2009Renewal fee patent year 04
22.01.2010Renewal fee patent year 05
24.01.2011Renewal fee patent year 06
25.01.2012Renewal fee patent year 07
28.01.2013Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Rights in Rem or Legal Means of ExecutionID:01
For:all designated states
Date:10.04.2013
[2013/40]
Lapses during opposition  TooltipHU31.01.2006
AT17.04.2013
BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
IT17.04.2013
LT17.04.2013
LV17.04.2013
MC17.04.2013
NL17.04.2013
PL17.04.2013
RO17.04.2013
SE17.04.2013
SI17.04.2013
SK17.04.2013
TR17.04.2013
BG17.07.2013
GR18.07.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
[2016/33]
Former [2016/32]HU31.01.2006
AT17.04.2013
BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
IT17.04.2013
LT17.04.2013
LV17.04.2013
MC17.04.2013
NL17.04.2013
PL17.04.2013
RO17.04.2013
SE17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
GR18.07.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
Former [2014/38]AT17.04.2013
BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
IT17.04.2013
LT17.04.2013
LV17.04.2013
MC17.04.2013
NL17.04.2013
PL17.04.2013
RO17.04.2013
SE17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
GR18.07.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
Former [2014/14]AT17.04.2013
BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
IT17.04.2013
LT17.04.2013
LV17.04.2013
NL17.04.2013
PL17.04.2013
RO17.04.2013
SE17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
GR18.07.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
Former [2014/11]AT17.04.2013
BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
IT17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
RO17.04.2013
SE17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
GR18.07.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
Former [2014/10]AT17.04.2013
BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
SE17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
GR18.07.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
Former [2014/09]AT17.04.2013
BE17.04.2013
CY17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
SE17.04.2013
SI17.04.2013
BG17.07.2013
GR18.07.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/52]AT17.04.2013
BE17.04.2013
CY17.04.2013
FI17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
SE17.04.2013
SI17.04.2013
BG17.07.2013
GR18.07.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/50]AT17.04.2013
BE17.04.2013
FI17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
SE17.04.2013
SI17.04.2013
BG17.07.2013
GR18.07.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/49]AT17.04.2013
BE17.04.2013
FI17.04.2013
LT17.04.2013
SE17.04.2013
SI17.04.2013
GR18.07.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/48]AT17.04.2013
LT17.04.2013
ES28.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/47]LT17.04.2013
PT19.08.2013
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.