EP1826939 - Resource block candidate selection technique employing packet scheduling in wireless communication systems [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.06.2017 Database last updated on 16.07.2024 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Sun Patent Trust 450 Lexington Avenue, 38th Floor New York, NY 10017 / US | [N/P] |
Former [2016/33] | For all designated states Sun Patent Trust 450 Lexington Avenue, 38th Floor New York NY 10017 / US | ||
Former [2014/30] | For all designated states Panasonic Intellectual Property Corporation of America 20000 Mariner Avenue Suite 200 Torrance CA 90503 / US | ||
Former [2008/47] | For all designated states Panasonic Corporation 1006, Oaza Kadoma Kadoma-shi Osaka 571-8501 / JP | ||
Former [2007/35] | For all designated states Matsushita Electric Industrial Co., Ltd. 1006, Ohaza Kadoma Kadoma-shi Osaka 571-8501 / JP | Inventor(s) | 01 /
Wengerter, Christian Panasonic R&D Center Germany GmbH Monzastrasse 4c 63225 Langen / DE | 02 /
Löhr, Joachim Panasonic R&D Center Germany GmbH Monzastrasse 4c 63225 Langen / DE | [2016/33] |
Former [2007/35] | 01 /
Wengerter, Christian Panasonic R&D Center Germany GmbH Monzastrasse 4c 63225 Langen / DE | ||
02 /
Löhr, Joachim Panasonic R&D Center Germany GmbH Monzastrasse 4c 63225 Langen / DE | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2016/33] |
Former [2007/35] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Maximilianstrasse 58 80538 München / DE | Application number, filing date | 06003825.4 | 24.02.2006 | [2007/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP1826939 | Date: | 29.08.2007 | Language: | EN | [2007/35] | Type: | B1 Patent specification | No.: | EP1826939 | Date: | 17.08.2016 | Language: | EN | [2016/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.07.2006 | Classification | IPC: | H04L1/18, // H04L1/00, H04L1/16 | [2016/03] | CPC: |
H04L1/0026 (EP,CN,US);
H04L1/1887 (EP,CN,US);
H04W72/20 (US);
H04L1/16 (CN,US);
H04L5/0007 (US);
H04W72/0446 (US);
H04W72/0453 (US);
H04W72/23 (US);
H04L1/1819 (EP,CN,US);
H04L2001/0093 (EP,CN,US)
(-)
|
Former IPC [2007/35] | H04L1/18 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2016/33] |
Former [2007/35] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | Verfahren zur Auswahl von einem Ressourceblockkandidaten unter Verwendung von Paketablaufsteuerung in drahtlosen Kommunikationssystemen | [2007/35] | English: | Resource block candidate selection technique employing packet scheduling in wireless communication systems | [2007/35] | French: | Technique de sélection de candidat de ressource de bloc utilisant une planification de paquets dans des systèmes de communication sans fil | [2007/35] | Examination procedure | 04.02.2008 | Examination requested [2008/12] | 02.04.2008 | Despatch of a communication from the examining division (Time limit: M04) | 25.07.2008 | Reply to a communication from the examining division | 28.03.2011 | Despatch of a communication from the examining division (Time limit: M04) | 08.08.2011 | Reply to a communication from the examining division | 09.01.2013 | Despatch of a communication from the examining division (Time limit: M04) | 16.05.2013 | Reply to a communication from the examining division | 22.12.2014 | Despatch of a communication from the examining division (Time limit: M04) | 08.04.2015 | Reply to a communication from the examining division | 12.01.2016 | Communication of intention to grant the patent | 17.05.2016 | Fee for grant paid | 17.05.2016 | Fee for publishing/printing paid | 17.05.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | EP16167758.8 / EP3073664 | EP18209530.7 / EP3471301 | EP19196404.8 / EP3598678 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 02.04.2008 | Opposition(s) | 18.05.2017 | No opposition filed within time limit [2017/30] | Fees paid | Renewal fee | 28.02.2008 | Renewal fee patent year 03 | 31.03.2008 | Renewal fee patent year 04 | 26.02.2010 | Renewal fee patent year 05 | 25.02.2011 | Renewal fee patent year 06 | 28.02.2012 | Renewal fee patent year 07 | 26.02.2013 | Renewal fee patent year 08 | 20.02.2014 | Renewal fee patent year 09 | 23.02.2015 | Renewal fee patent year 10 | 22.02.2016 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.02.2006 | AT | 17.08.2016 | BE | 17.08.2016 | CY | 17.08.2016 | CZ | 17.08.2016 | DK | 17.08.2016 | EE | 17.08.2016 | ES | 17.08.2016 | FI | 17.08.2016 | IT | 17.08.2016 | LT | 17.08.2016 | LV | 17.08.2016 | MC | 17.08.2016 | NL | 17.08.2016 | PL | 17.08.2016 | RO | 17.08.2016 | SE | 17.08.2016 | SI | 17.08.2016 | SK | 17.08.2016 | TR | 17.08.2016 | BG | 17.11.2016 | GR | 18.11.2016 | IS | 17.12.2016 | PT | 19.12.2016 | IE | 24.02.2017 | LU | 24.02.2017 | CH | 28.02.2017 | LI | 28.02.2017 | [2020/33] |
Former [2020/15] | HU | 24.02.2006 | |
AT | 17.08.2016 | ||
BE | 17.08.2016 | ||
CY | 17.08.2016 | ||
CZ | 17.08.2016 | ||
DK | 17.08.2016 | ||
EE | 17.08.2016 | ||
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
LV | 17.08.2016 | ||
MC | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
RO | 17.08.2016 | ||
SE | 17.08.2016 | ||
SI | 17.08.2016 | ||
SK | 17.08.2016 | ||
TR | 17.08.2016 | ||
BG | 17.11.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
IE | 24.02.2017 | ||
LU | 24.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2019/46] | HU | 24.02.2006 | |
AT | 17.08.2016 | ||
BE | 17.08.2016 | ||
CY | 17.08.2016 | ||
CZ | 17.08.2016 | ||
DK | 17.08.2016 | ||
EE | 17.08.2016 | ||
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
LV | 17.08.2016 | ||
MC | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
RO | 17.08.2016 | ||
SE | 17.08.2016 | ||
SI | 17.08.2016 | ||
SK | 17.08.2016 | ||
BG | 17.11.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
IE | 24.02.2017 | ||
LU | 24.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2019/31] | HU | 24.02.2006 | |
AT | 17.08.2016 | ||
BE | 17.08.2016 | ||
CZ | 17.08.2016 | ||
DK | 17.08.2016 | ||
EE | 17.08.2016 | ||
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
LV | 17.08.2016 | ||
MC | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
RO | 17.08.2016 | ||
SE | 17.08.2016 | ||
SI | 17.08.2016 | ||
SK | 17.08.2016 | ||
BG | 17.11.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
IE | 24.02.2017 | ||
LU | 24.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/13] | AT | 17.08.2016 | |
BE | 17.08.2016 | ||
CZ | 17.08.2016 | ||
DK | 17.08.2016 | ||
EE | 17.08.2016 | ||
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
LV | 17.08.2016 | ||
MC | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
RO | 17.08.2016 | ||
SE | 17.08.2016 | ||
SI | 17.08.2016 | ||
SK | 17.08.2016 | ||
BG | 17.11.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
IE | 24.02.2017 | ||
LU | 24.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/04] | AT | 17.08.2016 | |
BE | 17.08.2016 | ||
CZ | 17.08.2016 | ||
DK | 17.08.2016 | ||
EE | 17.08.2016 | ||
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
LV | 17.08.2016 | ||
MC | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
RO | 17.08.2016 | ||
SE | 17.08.2016 | ||
SI | 17.08.2016 | ||
SK | 17.08.2016 | ||
BG | 17.11.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
LU | 24.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2017/51] | AT | 17.08.2016 | |
BE | 17.08.2016 | ||
CZ | 17.08.2016 | ||
DK | 17.08.2016 | ||
EE | 17.08.2016 | ||
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
LV | 17.08.2016 | ||
MC | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
RO | 17.08.2016 | ||
SE | 17.08.2016 | ||
SI | 17.08.2016 | ||
SK | 17.08.2016 | ||
BG | 17.11.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2017/45] | AT | 17.08.2016 | |
BE | 17.08.2016 | ||
CZ | 17.08.2016 | ||
DK | 17.08.2016 | ||
EE | 17.08.2016 | ||
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
LV | 17.08.2016 | ||
MC | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
RO | 17.08.2016 | ||
SE | 17.08.2016 | ||
SI | 17.08.2016 | ||
SK | 17.08.2016 | ||
BG | 17.11.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
Former [2017/37] | AT | 17.08.2016 | |
BE | 17.08.2016 | ||
CZ | 17.08.2016 | ||
DK | 17.08.2016 | ||
EE | 17.08.2016 | ||
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
LV | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
RO | 17.08.2016 | ||
SE | 17.08.2016 | ||
SI | 17.08.2016 | ||
SK | 17.08.2016 | ||
BG | 17.11.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
Former [2017/32] | AT | 17.08.2016 | |
BE | 17.08.2016 | ||
CZ | 17.08.2016 | ||
DK | 17.08.2016 | ||
EE | 17.08.2016 | ||
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
LV | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
RO | 17.08.2016 | ||
SE | 17.08.2016 | ||
SK | 17.08.2016 | ||
BG | 17.11.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
Former [2017/13] | AT | 17.08.2016 | |
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
LV | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
SE | 17.08.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
Former [2017/12] | AT | 17.08.2016 | |
ES | 17.08.2016 | ||
FI | 17.08.2016 | ||
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
SE | 17.08.2016 | ||
GR | 18.11.2016 | ||
PT | 19.12.2016 | ||
Former [2017/10] | FI | 17.08.2016 | |
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
NL | 17.08.2016 | ||
PL | 17.08.2016 | ||
SE | 17.08.2016 | ||
Former [2017/09] | FI | 17.08.2016 | |
IT | 17.08.2016 | ||
LT | 17.08.2016 | ||
NL | 17.08.2016 | ||
Former [2017/07] | LT | 17.08.2016 | Documents cited: | Search | [X]US2003081692 (KWAN RAYMOND [FI], et al) [X] 1,5-9,12-15,19-28 * the whole document *; | [Y]GB2387751 (SAMSUNG ELECTRONICS CO LTD [KR]) [Y] 2-4,11,16-18 * abstract ** figure 4 *; | [XY]US2004199846 (MATSUMOTO ATSUSHI [JP], et al) [X] 1,5-10,12-15,19-28 * abstract * * page 2, paragraph 38 - page 4, paragraph 64 * * figures 1-4 * [Y] 2-4,11,16-18 | Examination | - NTT DOCOMO, "Physical Channels and Multiplexing in Evolved UTRA Downlink", 3GPP DRAFT; R1-050590_PHYSICAL CHENNELS AND MULTIPLEXING IN DL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20050616), vol. RAN WG1, no. Sophia Antipolis, France; 20050616, XP050111408 | by applicant | US2003081692 | US2004199846 |