blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1724483

EP1724483 - Pressure piece assembly for a synchromesh device and a synchromesh device for a gearbox, in particular for motor vehicules [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.04.2010
Database last updated on 03.10.2024
Most recent event   Tooltip18.03.2011Lapse of the patent in a contracting statepublished on 20.04.2011  [2011/16]
Applicant(s)For all designated states
ZF Friedrichshafen AG
Graf-von-Soden-Platz 1
88046 Friedrichshafen / DE
[N/P]
Former [2006/47]For all designated states
ZF Friedrichshafen AG
88038 Friedrichshafen / DE
Inventor(s)01 / König, Jan-Peter
Gartenstrasse 9a
14550 Gross-Kreutz / DE
 [2006/47]
Application number, filing date06007939.915.04.2006
[2006/47]
Priority number, dateDE2005102324820.05.2005         Original published format: DE102005023248
[2006/47]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP1724483
Date:22.11.2006
Language:DE
[2006/47]
Type: B1 Patent specification 
No.:EP1724483
Date:03.06.2009
Language:DE
[2009/23]
Search report(s)(Supplementary) European search report - dispatched on:EP16.08.2006
ClassificationIPC:F16D23/06
[2006/47]
CPC:
F16D23/06 (EP); F16D2023/0618 (EP); F16D23/0612 (EP)
Designated contracting statesAT,   DE,   FR,   GB,   IT [2007/30]
Former [2006/47]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Druckstückeinheit für eine Synchronisiereinrichtung und Synchronisiereinrichtung für Schaltgetriebe, insbesondere für Kraftfahrzeuge[2006/47]
English:Pressure piece assembly for a synchromesh device and a synchromesh device for a gearbox, in particular for motor vehicules[2006/47]
French:Poussoir pour un dispositif de synchronisation et dispositif de synchronisation pour boîte de vitesses, en particulier pour véhicule automobiles[2006/47]
Examination procedure16.02.2007Amendment by applicant (claims and/or description)
16.02.2007Examination requested  [2007/15]
08.12.2008Communication of intention to grant the patent
01.04.2009Fee for grant paid
01.04.2009Fee for publishing/printing paid
Opposition(s)04.03.2010No opposition filed within time limit [2010/19]
Fees paidRenewal fee
28.03.2008Renewal fee patent year 03
16.04.2009Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipIT03.06.2009
[2011/16]
Documents cited:Search[X]DE1555158  (DAIMLER BENZ AG) [X] 1-7,12,13,16-18,20 * figure - *;
 [X]EP0870941  (RENAULT [FR]) [X] 1-10,12-14,16,17,20 * figure - *;
 [X]FR2803640  (PEUGEOT CITROEN AUTOMOBILES SA [FR]) [X] 1-7,12,13,16-18,20 * figure 2 *;
 [X]DE10006347  (DAIMLER CHRYSLER AG [DE]) [X] 1-16,18-20 * column 5, line 40 - line 44; figures 4-6; claim 2 *;
 [X]DE20216782U  (SCHWARZBICH JOERG [DE]) [X] 1-7,12-20 * figure - *;
 [A]EP1460298  (PEUGEOT CITROEN AUTOMOBILES SA [FR]) [A] 11-20* paragraph [0025]; figure - *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.