Extract from the Register of European Patents

EP About this file: EP1701425

EP1701425 - Voltage regulation of a utility power network [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  20.04.2018
Database last updated on 11.04.2026
Most recent event   Tooltip20.04.2018Withdrawal of applicationpublished on 23.05.2018  [2018/21]
Applicant(s)For all designated states
American Superconductor Corporation
64 Jackson Road
Devens MA 01432 / US
[2008/31]
Former [2006/37]For all designated states
AMERICAN SUPERCONDUCTOR CORPORATION
2 Technology Drive
Westborough, MA 01581 / US
Inventor(s)01 / Buckles, Warren Elliott
1217 Rutledge Street
Madison, Wisconsin 53703 / US
02 / Hubert, Thomas Gregory
601 Eiken Drive
Rushford, MN 55971 / US
03 / Folts, Douglas C.
430 Third Street
Baraboo, Wisconsin 53913 / US
 [2006/44]
Former [2006/37]01 / Buckles, Warren Elliott
1217 Rutledge Street
Madison, Wisconsin 53703 / US
02 / Hubert, Thomas Gregory
N11636 Twelfth Avenue
Necedah, Wisconsin 54646 / US
03 / Folts, Douglas C.
430 Third Street
Baraboo, Wisconsin 53913 / US
Representative(s)Potter Clarkson
Chapel Quarter
Mount Street
Nottingham NG1 6HQ / GB
[N/P]
Former [2013/37]Potter Clarkson LLP
The Belgrave Centre
Talbot Street
Nottingham
NG1 5GG / GB
Former [2006/37]Charig, Raymond Julian
Eric Potter Clarkson LLP Park View House 58 The Ropewalk
Nottingham NG1 5DD / GB
Application number, filing date06075796.022.11.2000
[2006/37]
Priority number, dateUS19990167377P24.11.1999         Original published format: US 167377 P
[2006/37]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP1701425
Date:13.09.2006
Language:EN
[2006/37]
Type: A3 Search report 
No.:EP1701425
Date:05.01.2011
[2011/01]
Search report(s)(Supplementary) European search report - dispatched on:EP07.12.2010
ClassificationIPC:H02J3/18
[2006/37]
CPC:
H02J3/1842 (EP,US); Y02E40/20 (EP,US); Y02E40/30 (EP)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   TR [2006/37]
TitleGerman:Spannungsregelung eines Stromnetzes[2006/37]
English:Voltage regulation of a utility power network[2006/37]
French:Régulation de tension d'un réseau de services[2006/37]
Examination procedure27.04.2006Examination requested  [2006/37]
04.08.2006Loss of particular rights, legal effect: Claims
15.09.2006Despatch of communication of loss of particular rights: Claims {1}
10.08.2011Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
02.09.2011Amendment by applicant (claims and/or description)
16.04.2018Application withdrawn by applicant  [2018/21]
Parent application(s)   TooltipEP00979222.7  / EP1236261
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20000979222) is  02.12.2002
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
29.09.2011Request for further processing filed
29.09.2011Full payment received (date of receipt of payment)
Request granted
13.10.2011Decision despatched
Fees paidRenewal fee
27.04.2006Renewal fee patent year 03
27.04.2006Renewal fee patent year 04
27.04.2006Renewal fee patent year 05
27.04.2006Renewal fee patent year 06
27.11.2006Renewal fee patent year 07
27.11.2007Renewal fee patent year 08
25.11.2008Renewal fee patent year 09
25.11.2009Renewal fee patent year 10
24.11.2010Renewal fee patent year 11
23.11.2011Renewal fee patent year 12
26.11.2012Renewal fee patent year 13
27.11.2013Renewal fee patent year 14
26.11.2014Renewal fee patent year 15
30.11.2015Renewal fee patent year 16
28.11.2016Renewal fee patent year 17
27.11.2017Renewal fee patent year 18
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[I] US3217171  (COREY PHILIP D et al.)
 [A]   RAHIM A H M A ET AL: "CONTROL OF SUBSYNCHRONOUS RESONANT MODES IN A SERIES COMPENSATED SYSTEM THROUGH SUPERCONDUCTING MAGNETIC ENERGY STORAGE UNITS", IEEE TRANSACTIONS ON ENERGY CONVERSION,US,IEEE INC. NEW YORK, vol. 11, no. 1, 1 March 1996 (1996-03-01), pages 175 - 180, XP000580378, ISSN: 0885-8969

DOI:   http://dx.doi.org/10.1109/60.486593
by applicantUS3217171
   A. H. M. A. RAHIM ET AL.: "Control of Subsyschronus Resonant Modes in a Series Compensated System through Superconducting Magnetic Energy Storage Units", IEEE TRANSACTIONS ON ENERGY CONVERSION, vol. 3, no. 1, 1996, pages 175 - 180
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.