EP1854256 - SELECTION OF TRAINING SEQUENCES IN A MULTILPE-IN MULTIPLE-OUT COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.09.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 05.10.2018 | ||
Former | Grant of patent is intended Status updated on 28.05.2018 | Most recent event Tooltip | 09.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 11.08.2021 [2021/32] | Applicant(s) | For all designated states Sony Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2010/27] |
Former [2007/46] | For all designated states IPWireless, Inc. 1001 Bayhill Drive, 2nd Floor San Bruno, CA 94066 / US | Inventor(s) | 01 /
DARWOOD, Peter, B. 78 Forres Road Crookes Sheffield Yorkshire S10 1WE / GB | 02 /
PONNAMPALAM, Vishakan 24 Royal Albert Road Bristol BS6 7NY / GB | 03 /
JONES, Alan, Edward 21 Petty Lane Derry Hill Calne Wiltshire SN11 9QY / GB | [2018/45] |
Former [2008/20] | 01 /
DARWOOD, Peter, B. 78 Forres Road, Crookes Sheffield Yorkshire S10 1WE / GB | ||
02 /
PONNAMPALAM, Vishakan 24 Royal Albert Road Bristol BS6 7NY / GB | |||
03 /
JONES, Alan, Edward 21 Petty Lane, Derry Hill Calne Wiltshire SN11 9QY / GB | |||
Former [2007/46] | 01 /
DARWOOD, Peter, B. 78 Forres Road, Crookes Sheffield Yorkshire S10 1WE / GB | ||
02 /
PONNAMPALAM, Vishakan Flat 11, All Saints Road Clifton Bristol BS8 2JH / GB | |||
03 /
JONES, Alan, Edward 21 Petty Lane, Derry Hill Calne Wiltshire SN11 9QY / GB | Representative(s) | D Young & Co LLP 3 Noble Street London EC2V 7BQ / GB | [N/P] |
Former [2018/45] | D Young & Co LLP 120 Holborn London EC1N 2DY / GB | ||
Former [2010/26] | DeVile, Jonathan Mark, et al D Young & Co LLP Briton House Briton Street Southampton SO14 3EB / GB | ||
Former [2009/28] | Wray, Antony John, et al Optimus The Strategic Patent Service Grove House Lutyens Close Chineham Court Basingstoke Hampshire RG24 8AG / GB | ||
Former [2007/46] | Wray, Antony John, et al Optimus Patents Limited Grove House Lutyens Close Chineham Court Basingstoke Hampshire, RG24 8AG / GB | Application number, filing date | 06707969.9 | 01.02.2006 | [2007/46] | WO2006EP50608 | Priority number, date | US20050061958 | 17.02.2005 Original published format: US 61958 | [2007/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2006087265 | Date: | 24.08.2006 | Language: | EN | [2006/34] | Type: | A1 Application with search report | No.: | EP1854256 | Date: | 14.11.2007 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.08.2006 takes the place of the publication of the European patent application. | [2007/46] | Type: | B1 Patent specification | No.: | EP1854256 | Date: | 07.11.2018 | Language: | EN | [2018/45] | Search report(s) | International search report - published on: | EP | 24.08.2006 | Classification | IPC: | H04L5/00, H04L25/02 | [2016/10] | CPC: |
H04L5/0023 (EP,KR,US);
H04B7/0684 (KR,US);
H04B1/7105 (KR,US);
H04B7/0413 (KR,US);
H04B7/0632 (US);
H04B7/0851 (KR);
|
Former IPC [2007/46] | H04L25/02, H04L1/06 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2018/45] |
Former [2007/46] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | AUSWAHL VON ÜBUNGSSEQUENZEN IN EINEM KOMMUNIKATIONSSYSTEM MIT MEHREREN EINGÄNGEN UND MEHREREN AUSGÄNGEN | [2007/46] | English: | SELECTION OF TRAINING SEQUENCES IN A MULTILPE-IN MULTIPLE-OUT COMMUNICATION SYSTEM | [2007/46] | French: | SELECTION DE SEQUENCES DE FORMATION DANS UN SYSTEME DE COMMUNICATION A ENTREES MULTIPLES ET SORTIES MULTIPLES | [2007/46] | Entry into regional phase | 17.09.2007 | National basic fee paid | 17.09.2007 | Designation fee(s) paid | 17.09.2007 | Examination fee paid | Examination procedure | 14.09.2006 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 19.07.2007 | Amendment by applicant (claims and/or description) | 17.09.2007 | Examination requested [2007/46] | 03.02.2010 | Despatch of a communication from the examining division (Time limit: M06) | 03.08.2010 | Reply to a communication from the examining division | 25.11.2011 | Despatch of a communication from the examining division (Time limit: M06) | 18.04.2012 | Reply to a communication from the examining division | 08.03.2016 | Despatch of a communication from the examining division (Time limit: M04) | 12.07.2016 | Reply to a communication from the examining division | 29.05.2018 | Communication of intention to grant the patent | 18.09.2018 | Receipt of the translation of the claim(s) | 29.09.2018 | Fee for grant paid | 29.09.2018 | Fee for publishing/printing paid | Divisional application(s) | EP10169717.5 / EP2237509 | EP10169718.3 / EP2237510 | EP10169722.5 / EP2237465 | EP10169723.3 / EP2237466 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 03.02.2010 | Opposition(s) | 08.08.2019 | No opposition filed within time limit [2019/42] | Fees paid | Renewal fee | 29.02.2008 | Renewal fee patent year 03 | 02.03.2009 | Renewal fee patent year 04 | 16.02.2010 | Renewal fee patent year 05 | 15.02.2011 | Renewal fee patent year 06 | 15.02.2012 | Renewal fee patent year 07 | 12.02.2013 | Renewal fee patent year 08 | 20.02.2014 | Renewal fee patent year 09 | 23.02.2015 | Renewal fee patent year 10 | 22.02.2016 | Renewal fee patent year 11 | 17.02.2017 | Renewal fee patent year 12 | 22.02.2018 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.02.2006 | AT | 07.11.2018 | CY | 07.11.2018 | CZ | 07.11.2018 | DK | 07.11.2018 | EE | 07.11.2018 | ES | 07.11.2018 | FI | 07.11.2018 | IT | 07.11.2018 | LT | 07.11.2018 | LV | 07.11.2018 | MC | 07.11.2018 | NL | 07.11.2018 | PL | 07.11.2018 | RO | 07.11.2018 | SE | 07.11.2018 | SI | 07.11.2018 | SK | 07.11.2018 | TR | 07.11.2018 | IE | 01.02.2019 | LU | 01.02.2019 | BG | 07.02.2019 | GR | 08.02.2019 | BE | 28.02.2019 | CH | 28.02.2019 | FR | 28.02.2019 | LI | 28.02.2019 | IS | 07.03.2019 | PT | 07.03.2019 | [2021/32] |
Former [2021/26] | AT | 07.11.2018 | |
CY | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
TR | 07.11.2018 | ||
IE | 01.02.2019 | ||
LU | 01.02.2019 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
FR | 28.02.2019 | ||
LI | 28.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/17] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
TR | 07.11.2018 | ||
IE | 01.02.2019 | ||
LU | 01.02.2019 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
FR | 28.02.2019 | ||
LI | 28.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/12] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
IE | 01.02.2019 | ||
LU | 01.02.2019 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
FR | 28.02.2019 | ||
LI | 28.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/09] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
IE | 01.02.2019 | ||
LU | 01.02.2019 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/04] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
LU | 01.02.2019 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/50] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
LU | 01.02.2019 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/47] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SK | 07.11.2018 | ||
LU | 01.02.2019 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/45] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SK | 07.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/40] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SK | 07.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/37] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/35] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/34] | AT | 07.11.2018 | |
DK | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/26] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/24] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/23] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
BG | 07.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/22] | FI | 07.11.2018 | |
LT | 07.11.2018 | ||
BG | 07.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/21] | FI | 07.11.2018 | |
LT | 07.11.2018 | ||
IS | 07.03.2019 | ||
Former [2019/20] | LT | 07.11.2018 | Cited in | International search | [A]EP0993138 (NORTEL NETWORKS CORP [CA]) [A] 1-32 * paragraph [0010] * * paragraph [0015] - paragraph [0018] * * paragraph [0020] *; | [A]EP1047218 (LUCENT TECHNOLOGIES INC [US]) [A] 1-32* page 5, paragraph 3 *; | [A]WO0203557 (IOSPAN WIRELESS INC [US]) [A] 1-32 * claims 1,2 *; | [X]WO2004073276 (DOCOMO COMM LAB EUROPE GMBH [DE], et al) [X] 1-32 * abstract * * page 5, paragraph 3 * * page 7, paragraph 5 *; | [A]EP1473862 (SAMSUNG ELECTRONICS CO LTD [KR], et al) [A] 1-32 * abstract * * paragraph [0017] - paragraph [0018] * * table 2 *; | [A] - LEI M ET AL, "CHANNEL ESTIMATION BASED ON MIDAMBLE IN UNTRA-TDD SYSTEM", PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON TELECOMMUNICATIONSICT, (20020623), vol. 2, pages 434 - 438, XP008028023 [A] 1-32 * the whole document * | Examination | EP1185048 | US2002122382 | - IPWIRELESS, "Midamble Allocation and Channelisation Code Allocation Signalling to Support MIMO in UTRA TDD", 3GPP DRAFT; R1-040987, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20040812), vol. RAN WG1, no. Prague, Czech Republic; 20040812, XP050099191 | - IPWIRELESS, "Text Proposal for MIMO TR 25.876 (Midamble Allocation and Code Allocation Signalling)", 3GPP DRAFT; R1-040988, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20040812), vol. RAN WG1, no. Prague, Czech Republic; 20040812, XP050099192 | - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Physical channels and mapping of transport channels onto physical channels (TDD) (Release 5)", 3GPP STANDARD; 3GPP TS 25.221, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20030601), no. V5.5.0, pages 1 - 97, XP050366970 | by applicant | EP0993138 | WO2004073276 |