EP1841574 - CENTER HEATED DIE PLATE FOR UNDERWATER PELLETIZER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.08.2019 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 21.09.2018 | ||
Former | Grant of patent is intended Status updated on 13.05.2018 | ||
Former | Examination is in progress Status updated on 03.05.2017 | Most recent event Tooltip | 09.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 11.08.2021 [2021/32] | Applicant(s) | For all designated states Gala Industries, Inc. 181 Pauley Street, Eagle Rock Virginia 24085 / US | [2018/43] |
Former [2007/41] | For all designated states Gala Industries, Inc. 181 Pauley Street, Eagle Rock Virginia 24085 / US | Inventor(s) | 01 /
FRIDLEY, Michael, A. 211 Fairfield Lane Troutville, Virginia 24175 / US | [2008/19] |
Former [2007/41] | 01 /
FRIDLEY, Michael, A. 181 Branch Road Eagle Rock, Virginia 24085 / US | Representative(s) | Laufhütte, Dieter, et al Lorenz Seidler Gossel Rechtsanwälte Patentanwälte Partnerschaft mbB Widenmayerstraße 23 80538 München / DE | [2018/43] |
Former [2007/41] | Laufhütte, Dieter, et al Lorenz-Seidler-Gossel Widenmayerstrasse 23 80538 München / DE | Application number, filing date | 06733778.2 | 20.01.2006 | [2007/41] | WO2006US02033 | Priority number, date | US20050041865 | 25.01.2005 Original published format: US 41865 | [2007/41] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2006081140 | Date: | 03.08.2006 | Language: | EN | [2006/31] | Type: | A1 Application with search report | No.: | EP1841574 | Date: | 10.10.2007 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.08.2006 takes the place of the publication of the European patent application. | [2007/41] | Type: | B1 Patent specification | No.: | EP1841574 | Date: | 24.10.2018 | Language: | EN | [2018/43] | Search report(s) | International search report - published on: | EP | 03.08.2006 | Classification | IPC: | B29B9/06, B29C47/30, B29C47/86 | [2007/41] | CPC: |
B29B9/065 (EP,BR,US);
B29C48/25 (KR);
B29B7/582 (EP);
B29B7/826 (EP);
B29C48/04 (EP,BR,US);
B29C48/05 (EP,US);
B29C48/30 (BR);
B29C48/345 (EP,BR,US);
B29C48/86 (EP,BR,US);
B29C48/865 (EP,US);
B29B2009/125 (EP,BR,US);
B29C2035/0811 (EP,BR,US);
B29C2793/009 (EP,US)
(-)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2018/43] |
Former [2007/41] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | MITTIG ERHITZTE MATRIZENPLATTE FÜR EINEN UNTERWASSERPELLETIERER | [2007/41] | English: | CENTER HEATED DIE PLATE FOR UNDERWATER PELLETIZER | [2007/41] | French: | PLAQUE PORTE-FILÈRE CHAUFFÉE PAR LE CENTRE POUR GRANULATEUR IMMERGÉ | [2007/41] | Entry into regional phase | 12.07.2007 | National basic fee paid | 12.07.2007 | Designation fee(s) paid | 12.07.2007 | Examination fee paid | Examination procedure | 27.11.2006 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 12.07.2007 | Examination requested [2007/41] | 27.01.2010 | Despatch of a communication from the examining division (Time limit: M06) | 14.06.2010 | Reply to a communication from the examining division | 10.11.2014 | Despatch of a communication from the examining division (Time limit: M06) | 06.05.2015 | Reply to a communication from the examining division | 24.04.2017 | Despatch of a communication from the examining division (Time limit: M02) | 14.06.2017 | Reply to a communication from the examining division | 14.05.2018 | Communication of intention to grant the patent | 13.09.2018 | Fee for grant paid | 13.09.2018 | Fee for publishing/printing paid | 13.09.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.01.2010 | Opposition(s) | 25.07.2019 | No opposition filed within time limit [2019/40] | Fees paid | Renewal fee | 30.01.2008 | Renewal fee patent year 03 | 30.01.2009 | Renewal fee patent year 04 | 28.01.2010 | Renewal fee patent year 05 | 27.01.2011 | Renewal fee patent year 06 | 30.01.2012 | Renewal fee patent year 07 | 31.01.2013 | Renewal fee patent year 08 | 30.01.2014 | Renewal fee patent year 09 | 29.01.2015 | Renewal fee patent year 10 | 28.01.2016 | Renewal fee patent year 11 | 20.01.2017 | Renewal fee patent year 12 | 26.01.2018 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.01.2006 | CY | 24.10.2018 | CZ | 24.10.2018 | DK | 24.10.2018 | EE | 24.10.2018 | ES | 24.10.2018 | FI | 24.10.2018 | LT | 24.10.2018 | LV | 24.10.2018 | MC | 24.10.2018 | NL | 24.10.2018 | PL | 24.10.2018 | RO | 24.10.2018 | SE | 24.10.2018 | SI | 24.10.2018 | SK | 24.10.2018 | IE | 20.01.2019 | LU | 20.01.2019 | BG | 24.01.2019 | GB | 24.01.2019 | GR | 25.01.2019 | CH | 31.01.2019 | FR | 31.01.2019 | LI | 31.01.2019 | IS | 24.02.2019 | PT | 24.02.2019 | [2021/32] |
Former [2021/26] | CY | 24.10.2018 | |
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
IE | 20.01.2019 | ||
LU | 20.01.2019 | ||
BG | 24.01.2019 | ||
GB | 24.01.2019 | ||
GR | 25.01.2019 | ||
CH | 31.01.2019 | ||
FR | 31.01.2019 | ||
LI | 31.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2020/09] | CZ | 24.10.2018 | |
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
IE | 20.01.2019 | ||
LU | 20.01.2019 | ||
BG | 24.01.2019 | ||
GB | 24.01.2019 | ||
GR | 25.01.2019 | ||
CH | 31.01.2019 | ||
FR | 31.01.2019 | ||
LI | 31.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2020/04] | CZ | 24.10.2018 | |
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
LU | 20.01.2019 | ||
BG | 24.01.2019 | ||
GB | 24.01.2019 | ||
GR | 25.01.2019 | ||
CH | 31.01.2019 | ||
FR | 31.01.2019 | ||
LI | 31.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2020/03] | CZ | 24.10.2018 | |
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
LU | 20.01.2019 | ||
BG | 24.01.2019 | ||
GB | 24.01.2019 | ||
GR | 25.01.2019 | ||
FR | 31.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/49] | CZ | 24.10.2018 | |
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
LU | 20.01.2019 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
FR | 31.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/44] | CZ | 24.10.2018 | |
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
SE | 24.10.2018 | ||
SK | 24.10.2018 | ||
LU | 20.01.2019 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/40] | CZ | 24.10.2018 | |
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
SE | 24.10.2018 | ||
SK | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/37] | CZ | 24.10.2018 | |
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/35] | CZ | 24.10.2018 | |
DK | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/34] | DK | 24.10.2018 | |
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/26] | ES | 24.10.2018 | |
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/24] | ES | 24.10.2018 | |
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/23] | ES | 24.10.2018 | |
FI | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
BG | 24.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/22] | FI | 24.10.2018 | |
LT | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
BG | 24.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/21] | FI | 24.10.2018 | |
LT | 24.10.2018 | ||
NL | 24.10.2018 | ||
IS | 24.02.2019 | ||
Former [2019/20] | LT | 24.10.2018 | |
NL | 24.10.2018 | ||
Former [2019/17] | NL | 24.10.2018 | Cited in | International search | [X]US3521325 (SCHIPPERS HEINZ) [X] 1,3,6,17,18 * abstract * * column 3, line 52 - column 5, line 44 * * figures 1,2 *; | [A]US4071307 (PORRO LUIGI) [A] 1,6 * column 1, line 5 - line 8 * * column 2, line 29 - column 3, line 14 ** figures 1,2 *; | [X]DE19609065 (BERSTORFF GMBH MASCH HERMANN [DE]) [X] 1,2,5-8,17,18 * column 1, line 3 - line 65 * * column 2, line 36 - column 3, line 63 * * figure . *; | [X]US6474969 (READY KELLY [CA], et al) [X] 1,3-7,9-19 * abstract * * column 1, line 36 - line 53 * * column 2, line 8 - line 39 * * column 3, line 40 - column 4, line 20 * * column 4, line 48 - column 5, line 32 * * figure - * | by applicant | US3521325 | US4123207 | US4621996 | US4728276 | US5403176 | DE19609065 | US5624688 | US6474969 | US6824371 |