blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2078121

EP2078121 - THERMAL INSULATING COMPOSITE PANEL, METHOD OF ITS PRODUCTION AND BUILDING STRUCTURES FROM SUCH PANELS [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  16.12.2011
Database last updated on 15.07.2024
Most recent event   Tooltip16.12.2011Application deemed to be withdrawnpublished on 18.01.2012  [2012/03]
Applicant(s)For all designated states
Denev, Svetogor, Svetoslavov
17 Tsar Asen Str, No. 17
1000 Sofia / BG
[2009/29]
Inventor(s)01 / see applicant
...
 [2009/29]
Representative(s)Pavlova, Silva Pavlova
Zh.k. "Yavorov", bl. 41, vh.B et1 P.O. Box 12
1111 Sofia / BG
[2009/29]
Application number, filing date06761020.413.07.2006
[2009/29]
WO2006BG00014
Priority number, dateBG2006010941623.01.2006         Original published format: BG 10941606
[2009/29]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2007082356
Date:26.07.2007
Language:EN
[2007/30]
Type: A1 Application with search report 
No.:EP2078121
Date:15.07.2009
Language:EN
The application published by WIPO in one of the EPO official languages on 26.07.2007 takes the place of the publication of the European patent application.
[2009/29]
Search report(s)International search report - published on:EP26.07.2007
ClassificationIPC:E04B1/76, E04B1/14, E04C2/20
[2009/29]
CPC:
E04B1/80 (EP); E04B1/14 (EP); E04C2/296 (EP);
E04C2/384 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2009/29]
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:WÄRMEISOLIERVERBUNDPLATTE, VERFAHREN ZU IHRER HERSTELLUNG UND AUS SOLCHEN PLATTEN HERGESTELLTE GEBÄUDESTRUKTUREN[2009/29]
English:THERMAL INSULATING COMPOSITE PANEL, METHOD OF ITS PRODUCTION AND BUILDING STRUCTURES FROM SUCH PANELS[2009/29]
French:PANNEAU COMPOSITE D'ISOLATION THERMIQUE, PROCEDE POUR SA PRODUCTION ET STRUCTURES DE BATIMENTS CONSTITUEES DE TELS PANNEAUX[2009/29]
Entry into regional phase22.05.2009National basic fee paid 
22.05.2009Designation fee(s) paid 
28.07.2008Examination fee paid 
Examination procedure28.07.2008Examination requested  [2009/29]
27.07.2009Loss of particular rights, legal effect: Claims
31.08.2009Despatch of communication of loss of particular rights: Claims {1}
14.12.2009Despatch of a communication from the examining division (Time limit: M04)
30.03.2010Reply to a communication from the examining division
09.08.2010Despatch of a communication from the examining division (Time limit: M04)
29.11.2010Reply to a communication from the examining division
08.04.2011Communication of intention to grant the patent
28.06.2011Fee for grant paid
28.06.2011Fee for publishing/printing paid
19.08.2011Application deemed to be withdrawn, date of legal effect  [2012/03]
22.09.2011Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2012/03]
Public notification(s)"Noting of loss of rights pursuant to Rule 112(1) EPC" (EPO Form 1205A),dated 19.11.08
Denev, Svetogor, Svetoslavov
17 Tsar Asen Str, No. 17
1000 Sofia / BG
[2009/09]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  14.12.2009
Request for further processing for:The application is deemed to be withdrawn due to non-payment of designation fees
TR, SK, SI, SE, RO, PT, PL, NL, MC, LV, LU, LT, IT, IS, IE, HU, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT
22.05.2009Request for further processing filed
22.05.2009Full payment received (date of receipt of payment)
Request granted
17.06.2009Decision despatched
The application is deemed to be withdrawn due to non-payment of the filing fee
22.05.2009Request for further processing filed
22.05.2009Full payment received (date of receipt of payment)
Request granted
17.06.2009Decision despatched
Fees paidRenewal fee
02.03.2009Renewal fee patent year 03
28.01.2010Renewal fee patent year 04
20.01.2011Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
23.08.200803   M06   Fee paid on   02.03.2009
31.07.200904   M06   Fee paid on   28.01.2010
31.07.201005   M06   Fee paid on   20.01.2011
31.07.201106   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]WO9520711  (RAMIREZ PETER B [US]) [X] 1,6,14 * page 6, lines 20-23 * * page 11, lines 25-28 * * page 12, lines 12,13 * * page 13, lines 4-15 * * page 16, lines 26-28 * * page 17, lines 11-13; figures 1,5,9,10 *;
 [A]US2003033774  (PORTER WILLIAM H [US]) [A] 1,2,17 * figures 4A,7 *;
 [A]US5505031  (HEYDON JOHN J [US]) [A] 1,17 * column 18, lines 45-48; figures 6,11,12,14 *;
 [A]US4856244  (CLAPP GUY C [US]) [A] 1,17 * column 6, lines 46-63; figures 1-3,8 *;
 [A]US4349796  (CHIN MAURICE A, et al) [A] 1,17 * figure 9 *;
 [A]US4813193  (ALTIZER WAYNE D [US]) [A] 1,17 * the whole document *
by applicantWO9520711
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.