EP1910860 - A POSITIONING SYSTEM AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.04.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 14.05.2021 | ||
Former | Grant of patent is intended Status updated on 04.02.2021 | ||
Former | Examination is in progress Status updated on 04.04.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Elta Systems Ltd. 100 Sderot Itzhak Hanasie P.O.B. 330 77102 Ashdod / IL | [2008/16] | Inventor(s) | 01 /
FIREAIZEN, Moshe Neve Zuff 71945 Halamish / IL | [2011/34] |
Former [2009/40] | 01 /
FRIEAIZEN, Moshe Neve Zuff 71945 Halamish / IL | ||
Former [2008/16] | 01 /
FIEREIZEN, Moshe Neve Zuff 71945 Halamish / IL | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2021/24] |
Former [2008/16] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Maximilianstrasse 58 80538 München / DE | Application number, filing date | 06766178.5 | 25.07.2006 | [2008/16] | WO2006IL00863 | Priority number, date | IL20050169855 | 25.07.2005 Original published format: IL 16985505 | [2008/16] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2007013071 | Date: | 01.02.2007 | Language: | EN | [2007/05] | Type: | A1 Application with search report | No.: | EP1910860 | Date: | 16.04.2008 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.02.2007 takes the place of the publication of the European patent application. | [2008/16] | Type: | B1 Patent specification | No.: | EP1910860 | Date: | 16.06.2021 | Language: | EN | [2021/24] | Search report(s) | International search report - published on: | EP | 01.02.2007 | Classification | IPC: | G01S1/08, G01S1/20 | [2008/16] | CPC: |
G01S1/08 (EP,US);
G01S1/20 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2021/24] |
Former [2008/16] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR POSITIONIERUNG | [2008/16] | English: | A POSITIONING SYSTEM AND METHOD | [2008/16] | French: | SYSTÈME DE POSITIONNEMENT ET PROCÉDÉ | [2008/16] | Entry into regional phase | 18.02.2008 | National basic fee paid | 18.02.2008 | Designation fee(s) paid | 18.02.2008 | Examination fee paid | Examination procedure | 24.05.2007 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 18.02.2008 | Examination requested [2008/16] | 10.05.2011 | Despatch of a communication from the examining division (Time limit: M06) | 17.11.2011 | Reply to a communication from the examining division | 08.07.2015 | Despatch of a communication from the examining division (Time limit: M06) | 18.01.2016 | Reply to a communication from the examining division | 22.03.2017 | Despatch of a communication from the examining division (Time limit: M06) | 02.10.2017 | Reply to a communication from the examining division | 16.11.2018 | Despatch of a communication from the examining division (Time limit: M06) | 21.05.2019 | Reply to a communication from the examining division | 14.01.2020 | Despatch of a communication from the examining division (Time limit: M02) | 20.03.2020 | Reply to a communication from the examining division | 05.02.2021 | Communication of intention to grant the patent | 07.05.2021 | Fee for grant paid | 07.05.2021 | Fee for publishing/printing paid | 07.05.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.05.2011 | Opposition(s) | 17.03.2022 | No opposition filed within time limit [2022/21] | Fees paid | Renewal fee | 18.02.2008 | Renewal fee patent year 03 | 29.07.2009 | Renewal fee patent year 04 | 27.07.2010 | Renewal fee patent year 05 | 28.07.2011 | Renewal fee patent year 06 | 27.07.2012 | Renewal fee patent year 07 | 31.07.2013 | Renewal fee patent year 08 | 10.09.2014 | Renewal fee patent year 09 | 28.08.2015 | Renewal fee patent year 10 | 27.07.2016 | Renewal fee patent year 11 | 12.07.2017 | Renewal fee patent year 12 | 30.07.2018 | Renewal fee patent year 13 | 26.07.2019 | Renewal fee patent year 14 | 27.07.2020 | Renewal fee patent year 15 | Penalty fee | Additional fee for renewal fee | 31.07.2014 | 09   M06   Fee paid on   10.09.2014 | 31.07.2015 | 10   M06   Fee paid on   28.08.2015 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.07.2006 | AT | 16.06.2021 | CY | 16.06.2021 | CZ | 16.06.2021 | DK | 16.06.2021 | EE | 16.06.2021 | ES | 16.06.2021 | FI | 16.06.2021 | LT | 16.06.2021 | LV | 16.06.2021 | MC | 16.06.2021 | NL | 16.06.2021 | PL | 16.06.2021 | RO | 16.06.2021 | SE | 16.06.2021 | SI | 16.06.2021 | SK | 16.06.2021 | TR | 16.06.2021 | IE | 25.07.2021 | LU | 25.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | LI | 31.07.2021 | BG | 16.09.2021 | GR | 17.09.2021 | IS | 16.10.2021 | PT | 18.10.2021 | [2024/29] |
Former [2023/29] | HU | 25.07.2006 | |
AT | 16.06.2021 | ||
CY | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
IE | 25.07.2021 | ||
LU | 25.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2023/24] | AT | 16.06.2021 | |
CY | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
IE | 25.07.2021 | ||
LU | 25.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/35] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
IE | 25.07.2021 | ||
LU | 25.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/34] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
LU | 25.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/29] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
LU | 25.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/24] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
LU | 25.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/21] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/18] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/10] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/09] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
RO | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
PT | 18.10.2021 | ||
Former [2022/08] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
SE | 16.06.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2022/07] | AT | 16.06.2021 | |
FI | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
SE | 16.06.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2021/49] | FI | 16.06.2021 | |
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
SE | 16.06.2021 | ||
BG | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2021/47] | FI | 16.06.2021 | |
LT | 16.06.2021 | ||
BG | 16.09.2021 | ||
Former [2021/46] | FI | 16.06.2021 | |
LT | 16.06.2021 | Cited in | International search | [X]US4087816 (BARSZCZEWSKI ANDRZEJ, et al) [X] 2-5,7,8,15 * abstract *; | [Y]US4283726 (SPENCE LEWIS C, et al) [Y] 2-5,7,8,15* abstract *; | [Y]US5883598 (PARL STEEN A [US], et al) [Y] 2-5,7,8,15 * abstract * * column 9, line 6 - line 15 *; | [X]WO0194974 (BATTELLE MEMORIAL INSTITUTE [US]) [X] 2-5,7,8,15 * abstract *; | [X]US2004260506 (JONES ALED WYNNE [GB], et al) [X] 2-5,7,8,15 * paragraph [0187] - paragraph [0188]; figure 23 * * paragraph [0050] - paragraph [0051]; figure 4 * * paragraph [0058] - paragraph [0065]; figure 6 * | Examination | US2001020917 |