blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1946145

EP1946145 - PULSE DOPPLER COHERENT METHOD AND SYSTEM FOR SNR ENHANCEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.07.2014
Database last updated on 31.08.2024
Most recent event   Tooltip24.07.2015Lapse of the patent in a contracting state
New state(s): BG, HU, LU
published on 26.08.2015  [2015/35]
Applicant(s)For all designated states
Elta Systems Ltd.
100 Yitzchak Hanassi Boulevard P.O.Box 330
77102 Ashdod / IL
[2008/30]
Inventor(s)01 / BEILIN, Ella
9b HaTzyonut
Apartment 24
77456 Ashdod / IL
02 / GRIZIM, Jehezkel
21 Ben-Gurion Street
54031 Givat-Shmuel / IL
03 / VAGMAN, Yacov
12/63 Israel Galili Street
75426 Rishon LeZion / IL
04 / LOMES, Alexander
753 Nachal Poleg
71908 Maccabim / IL
 [2013/38]
Former [2008/44]01 / BEILIN, Ella
9b HaTzyonut, Apartment 24
77456 Ashdod / IL
02 / GRIZIM, Jehezkel
21 Ben-Gurion Street
54031 Givat-Shmuel / IL
03 / VAGMAN, Yacov
12/63 Israel Galili Street
75426 Rishon LeZion / IL
04 / LOMES, Alexander
753 Nachal Poleg
71908 Maccabim / IL
Former [2008/30]01 / BEILIN, Ella
12/18 Har Hermon Street
77709 Ashdod / IL
02 / GRIZIM, Jehezkel
21 Ben-Gurion Street
54031 Givat-Shmuel / IL
03 / VAGMAN, Yacov
12/63 Israel Galili Street
75426 Rishon LeZion / IL
04 / LOMES, Alexander
753 Nachal Poleg
71908 Maccabim / IL
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstrasse 4
80802 München / DE
[N/P]
Former [2013/38]Grünecker, Kinkeldey, Stockmair & Schwanhäusser
Leopoldstrasse 4
80802 München / DE
Former [2008/30]Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät
Leopoldstrasse 4
80802 München / DE
Former [2008/26]Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät
Leopoldstrasse 4
80802 München / DE
Application number, filing date06796154.005.10.2006
[2008/30]
WO2006IL01161
Priority number, dateIL2005017146419.10.2005         Original published format: IL 17146405
IL2006017546507.05.2006         Original published format: IL 17546506
[2008/30]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2007046082
Date:26.04.2007
Language:EN
[2007/17]
Type: A1 Application with search report 
No.:EP1946145
Date:23.07.2008
Language:EN
The application published by WIPO in one of the EPO official languages on 26.04.2007 takes the place of the publication of the European patent application.
[2008/30]
Type: B1 Patent specification 
No.:EP1946145
Date:18.09.2013
Language:EN
[2013/38]
Search report(s)International search report - published on:EP26.04.2007
ClassificationIPC:G01S13/22, G01S13/524
[2013/14]
CPC:
G01S13/227 (EP,US); G01S13/53 (KR); G01S13/5246 (EP,US)
Former IPC [2008/30]G01S13/22
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2008/30]
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:IMPULS-DOPPLER-KOHÄRENZVERFAHREN UND -SYSTEM ZUR VERBESSERUNG DES SNR[2008/30]
English:PULSE DOPPLER COHERENT METHOD AND SYSTEM FOR SNR ENHANCEMENT[2008/30]
French:PROCEDE COHERENT A DOPPLER A IMPULSIONS ET SYSTEME D'AMELIORATION DE RAPPORT SIGNAL-BRUIT[2008/30]
Entry into regional phase22.04.2008National basic fee paid 
22.04.2008Designation fee(s) paid 
22.04.2008Examination fee paid 
Examination procedure22.04.2008Amendment by applicant (claims and/or description)
22.04.2008Examination requested  [2008/30]
24.04.2009Despatch of a communication from the examining division (Time limit: M04)
04.08.2009Reply to a communication from the examining division
01.04.2011Despatch of a communication from the examining division (Time limit: M04)
11.07.2011Reply to a communication from the examining division
27.03.2013Communication of intention to grant the patent
01.08.2013Fee for grant paid
01.08.2013Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  24.04.2009
Opposition(s)19.06.2014No opposition filed within time limit [2014/35]
Fees paidRenewal fee
30.10.2008Renewal fee patent year 03
30.10.2009Renewal fee patent year 04
29.10.2010Renewal fee patent year 05
28.10.2011Renewal fee patent year 06
30.10.2012Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.10.2006
AT18.09.2013
BE18.09.2013
BG18.09.2013
CY18.09.2013
CZ18.09.2013
DK18.09.2013
EE18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
MC18.09.2013
NL18.09.2013
PL18.09.2013
RO18.09.2013
SE18.09.2013
SI18.09.2013
SK18.09.2013
TR18.09.2013
IE05.10.2013
LU05.10.2013
CH31.10.2013
LI31.10.2013
GR19.12.2013
IS18.01.2014
PT20.01.2014
[2015/34]
Former [2015/32]AT18.09.2013
BE18.09.2013
CY18.09.2013
CZ18.09.2013
DK18.09.2013
EE18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
MC18.09.2013
NL18.09.2013
PL18.09.2013
RO18.09.2013
SE18.09.2013
SI18.09.2013
SK18.09.2013
TR18.09.2013
IE05.10.2013
CH31.10.2013
LI31.10.2013
GR19.12.2013
IS18.01.2014
PT20.01.2014
Former [2014/48]AT18.09.2013
BE18.09.2013
CY18.09.2013
CZ18.09.2013
DK18.09.2013
EE18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
MC18.09.2013
NL18.09.2013
PL18.09.2013
RO18.09.2013
SE18.09.2013
SI18.09.2013
SK18.09.2013
IE05.10.2013
CH31.10.2013
LI31.10.2013
GR19.12.2013
IS18.01.2014
PT20.01.2014
Former [2014/41]AT18.09.2013
BE18.09.2013
CY18.09.2013
CZ18.09.2013
DK18.09.2013
EE18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
MC18.09.2013
NL18.09.2013
PL18.09.2013
RO18.09.2013
SE18.09.2013
SI18.09.2013
SK18.09.2013
CH31.10.2013
LI31.10.2013
GR19.12.2013
IS18.01.2014
PT20.01.2014
Former [2014/34]AT18.09.2013
BE18.09.2013
CY18.09.2013
CZ18.09.2013
EE18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
MC18.09.2013
NL18.09.2013
PL18.09.2013
RO18.09.2013
SE18.09.2013
SI18.09.2013
SK18.09.2013
CH31.10.2013
LI31.10.2013
GR19.12.2013
IS18.01.2014
PT20.01.2014
Former [2014/29]AT18.09.2013
BE18.09.2013
CY18.09.2013
CZ18.09.2013
EE18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
MC18.09.2013
NL18.09.2013
PL18.09.2013
RO18.09.2013
SE18.09.2013
SI18.09.2013
SK18.09.2013
GR19.12.2013
IS18.01.2014
PT20.01.2014
Former [2014/28]AT18.09.2013
BE18.09.2013
CY18.09.2013
CZ18.09.2013
EE18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
NL18.09.2013
PL18.09.2013
RO18.09.2013
SE18.09.2013
SI18.09.2013
SK18.09.2013
GR19.12.2013
IS18.01.2014
PT20.01.2014
Former [2014/24]AT18.09.2013
BE18.09.2013
CY18.09.2013
CZ18.09.2013
EE18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
NL18.09.2013
PL18.09.2013
RO18.09.2013
SE18.09.2013
SI18.09.2013
SK18.09.2013
GR19.12.2013
IS18.01.2014
Former [2014/23]BE18.09.2013
CY18.09.2013
CZ18.09.2013
EE18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
NL18.09.2013
RO18.09.2013
SE18.09.2013
SI18.09.2013
SK18.09.2013
GR19.12.2013
IS18.01.2014
Former [2014/22]BE18.09.2013
CY18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
NL18.09.2013
RO18.09.2013
SE18.09.2013
SI18.09.2013
GR19.12.2013
Former [2014/18]BE18.09.2013
CY18.09.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
SE18.09.2013
SI18.09.2013
GR19.12.2013
Former [2014/12]CY26.06.2013
ES18.09.2013
FI18.09.2013
LT18.09.2013
LV18.09.2013
SE18.09.2013
SI18.09.2013
GR19.12.2013
Former [2014/11]CY26.06.2013
FI18.09.2013
LT18.09.2013
SE18.09.2013
Former [2014/10]CY26.06.2013
LT18.09.2013
SE18.09.2013
Former [2014/09]LT18.09.2013
SE18.09.2013
Former [2014/08]LT18.09.2013
Cited inInternational search[X]US4714927  (SIEGEL HARALD [DE], et al) [X] 1-3,16-20,24 * column 3, line 24 - line 44 * * column 4, line 12 - line 25 *;
 [XY]FR2736161  (LE CENTRE THOMSON D APPLIC RAD [FR]) [X] 1-3,6,16-20,24 * page 1, line 1 - line 9 * * page 7, line 3 - line 14 * * page 10, line 1 - page 11, line 30 * * page 12, line 22 - line 27 * [Y] 4,5;
 [YA]US5627545  (VAN GENDEREN PIETER [NL], et al) [Y] 4,5 * column 4, line 26 - column 5, line 27 *[A] 7,21-23
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.