| EP1938113 - A SAMPLING MODULE AND A METHOD OF SAMPLING ONE OR MORE ANALOGUE CHARACTERISTICS OF A POWER TRANSMISSION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.06.2010 Database last updated on 14.03.2026 | Most recent event Tooltip | 30.09.2011 | Lapse of the patent in a contracting state New state(s): TR | published on 02.11.2011 [2011/44] | Applicant(s) | For all designated states AREVA T&D UK Ltd. St. Leonard Works St. Leonard's Avenue Stafford, ST17 4LX / GB | [2008/27] | Inventor(s) | 01 /
KIDD, Simon 15 Featherbed Lane Hixon Staffordshire ST18 0QS / GB | [2008/27] | Representative(s) | Poulin, Gérard, et al BREVALEX 95, rue d'Amsterdam 75378 Paris Cedex 8 / FR | [N/P] |
| Former [N/P] | Poulin, Gérard, et al Brevatome 3, rue du Docteur Lancereaux 75008 Paris / FR | ||
| Former [2008/27] | Poulin, Gérard, et al Brevatome 3, rue du Docteur Lancereaux 75008 Paris / FR | Application number, filing date | 06807418.6 | 19.10.2006 | [2008/27] | WO2006EP67594 | Priority number, date | GB20050021411 | 21.10.2005 Original published format: GB 0521411 | [2008/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2007045682 | Date: | 26.04.2007 | Language: | EN | [2007/17] | Type: | A1 Application with search report | No.: | EP1938113 | Date: | 02.07.2008 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.04.2007 takes the place of the publication of the European patent application. | [2008/27] | Type: | B1 Patent specification | No.: | EP1938113 | Date: | 19.08.2009 | Language: | EN | [2009/34] | Search report(s) | International search report - published on: | EP | 26.04.2007 | Classification | IPC: | G01R19/25, G01R15/14, H03M3/02 | [2008/27] | CPC: |
G01R19/2509 (EP,US);
G01R19/2513 (EP,GB,US);
G01R15/14 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2008/27] | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | SAMPLING-MODUL UND VERFAHREN ZUM ABTASTEN EINER ODER MEHRERER ANALOGER KENNGRÖSSEN EINES ENERGIEÜBERTRAGUNGSSYSTEMS | [2009/14] | English: | A SAMPLING MODULE AND A METHOD OF SAMPLING ONE OR MORE ANALOGUE CHARACTERISTICS OF A POWER TRANSMISSION SYSTEM | [2008/27] | French: | MODULE D'ÉCHANTILLONNAGE ET MÉTHODE D'ÉCHANTILLONNAGE D'UNE OU DE PLUSIEURES CARACTÉRISTIQUES ANALOGIQUES D'UN SYSTÈME DE TRANSMISSION D'ÉNERGIE | [2008/27] |
| Former [2008/27] | SAMPLING-MODUL UND VERFAHREN ZUM SAMPELN EINER ODER MEHRERER ANALOGER KENNGRÖSSEN EINES ENERGIEÜBERTRAGUNGSSYSTEMS | Entry into regional phase | 10.04.2008 | National basic fee paid | 10.04.2008 | Designation fee(s) paid | 10.04.2008 | Examination fee paid | Examination procedure | 08.06.2007 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 10.04.2008 | Amendment by applicant (claims and/or description) | 10.04.2008 | Examination requested [2008/27] | 15.01.2009 | Despatch of a communication from the examining division (Time limit: M04) | 04.02.2009 | Reply to a communication from the examining division | 13.03.2009 | Communication of intention to grant the patent | 06.07.2009 | Fee for grant paid | 06.07.2009 | Fee for publishing/printing paid | Opposition(s) | 20.05.2010 | No opposition filed within time limit [2010/30] | Fees paid | Renewal fee | 21.10.2008 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 19.08.2009 | BE | 19.08.2009 | CY | 19.08.2009 | CZ | 19.08.2009 | DK | 19.08.2009 | EE | 19.08.2009 | FI | 19.08.2009 | IT | 19.08.2009 | LT | 19.08.2009 | LV | 19.08.2009 | NL | 19.08.2009 | PL | 19.08.2009 | RO | 19.08.2009 | SI | 19.08.2009 | SK | 19.08.2009 | TR | 19.08.2009 | IE | 19.10.2009 | LU | 19.10.2009 | MC | 31.10.2009 | BG | 19.11.2009 | GR | 20.11.2009 | IS | 19.12.2009 | PT | 21.12.2009 | HU | 20.02.2010 | [2011/44] |
| Former [2011/33] | AT | 19.08.2009 | |
| BE | 19.08.2009 | ||
| CY | 19.08.2009 | ||
| CZ | 19.08.2009 | ||
| DK | 19.08.2009 | ||
| EE | 19.08.2009 | ||
| FI | 19.08.2009 | ||
| IT | 19.08.2009 | ||
| LT | 19.08.2009 | ||
| LV | 19.08.2009 | ||
| NL | 19.08.2009 | ||
| PL | 19.08.2009 | ||
| RO | 19.08.2009 | ||
| SI | 19.08.2009 | ||
| SK | 19.08.2009 | ||
| IE | 19.10.2009 | ||
| LU | 19.10.2009 | ||
| MC | 31.10.2009 | ||
| BG | 19.11.2009 | ||
| GR | 20.11.2009 | ||
| IS | 19.12.2009 | ||
| PT | 21.12.2009 | ||
| HU | 20.02.2010 | ||
| Former [2011/22] | AT | 19.08.2009 | |
| BE | 19.08.2009 | ||
| CY | 19.08.2009 | ||
| CZ | 19.08.2009 | ||
| DK | 19.08.2009 | ||
| EE | 19.08.2009 | ||
| FI | 19.08.2009 | ||
| IT | 19.08.2009 | ||
| LT | 19.08.2009 | ||
| LV | 19.08.2009 | ||
| NL | 19.08.2009 | ||
| PL | 19.08.2009 | ||
| RO | 19.08.2009 | ||
| SI | 19.08.2009 | ||
| SK | 19.08.2009 | ||
| IE | 19.10.2009 | ||
| LU | 19.10.2009 | ||
| MC | 31.10.2009 | ||
| BG | 19.11.2009 | ||
| GR | 20.11.2009 | ||
| IS | 19.12.2009 | ||
| PT | 21.12.2009 | ||
| Former [2011/18] | AT | 19.08.2009 | |
| BE | 19.08.2009 | ||
| CY | 19.08.2009 | ||
| CZ | 19.08.2009 | ||
| DK | 19.08.2009 | ||
| EE | 19.08.2009 | ||
| FI | 19.08.2009 | ||
| IT | 19.08.2009 | ||
| LT | 19.08.2009 | ||
| LV | 19.08.2009 | ||
| NL | 19.08.2009 | ||
| PL | 19.08.2009 | ||
| RO | 19.08.2009 | ||
| SI | 19.08.2009 | ||
| SK | 19.08.2009 | ||
| IE | 19.10.2009 | ||
| MC | 31.10.2009 | ||
| BG | 19.11.2009 | ||
| GR | 20.11.2009 | ||
| IS | 19.12.2009 | ||
| PT | 21.12.2009 | ||
| Former [2011/05] | AT | 19.08.2009 | |
| BE | 19.08.2009 | ||
| CY | 19.08.2009 | ||
| CZ | 19.08.2009 | ||
| DK | 19.08.2009 | ||
| EE | 19.08.2009 | ||
| FI | 19.08.2009 | ||
| LT | 19.08.2009 | ||
| LV | 19.08.2009 | ||
| NL | 19.08.2009 | ||
| PL | 19.08.2009 | ||
| RO | 19.08.2009 | ||
| SI | 19.08.2009 | ||
| SK | 19.08.2009 | ||
| IE | 19.10.2009 | ||
| MC | 31.10.2009 | ||
| BG | 19.11.2009 | ||
| GR | 20.11.2009 | ||
| IS | 19.12.2009 | ||
| PT | 21.12.2009 | ||
| Former [2010/28] | AT | 19.08.2009 | |
| BE | 19.08.2009 | ||
| CY | 19.08.2009 | ||
| CZ | 19.08.2009 | ||
| DK | 19.08.2009 | ||
| EE | 19.08.2009 | ||
| FI | 19.08.2009 | ||
| LT | 19.08.2009 | ||
| LV | 19.08.2009 | ||
| NL | 19.08.2009 | ||
| PL | 19.08.2009 | ||
| RO | 19.08.2009 | ||
| SI | 19.08.2009 | ||
| SK | 19.08.2009 | ||
| MC | 31.10.2009 | ||
| BG | 19.11.2009 | ||
| IS | 19.12.2009 | ||
| PT | 21.12.2009 | ||
| Former [2010/26] | AT | 19.08.2009 | |
| CY | 19.08.2009 | ||
| CZ | 19.08.2009 | ||
| DK | 19.08.2009 | ||
| EE | 19.08.2009 | ||
| FI | 19.08.2009 | ||
| LT | 19.08.2009 | ||
| LV | 19.08.2009 | ||
| NL | 19.08.2009 | ||
| PL | 19.08.2009 | ||
| RO | 19.08.2009 | ||
| SI | 19.08.2009 | ||
| SK | 19.08.2009 | ||
| MC | 31.10.2009 | ||
| BG | 19.11.2009 | ||
| IS | 19.12.2009 | ||
| PT | 21.12.2009 | ||
| Former [2010/20] | AT | 19.08.2009 | |
| CY | 19.08.2009 | ||
| DK | 19.08.2009 | ||
| EE | 19.08.2009 | ||
| FI | 19.08.2009 | ||
| LT | 19.08.2009 | ||
| LV | 19.08.2009 | ||
| NL | 19.08.2009 | ||
| PL | 19.08.2009 | ||
| SI | 19.08.2009 | ||
| BG | 19.11.2009 | ||
| IS | 19.12.2009 | ||
| PT | 21.12.2009 | ||
| Former [2010/17] | AT | 19.08.2009 | |
| CY | 19.08.2009 | ||
| FI | 19.08.2009 | ||
| LT | 19.08.2009 | ||
| LV | 19.08.2009 | ||
| NL | 19.08.2009 | ||
| PL | 19.08.2009 | ||
| SI | 19.08.2009 | ||
| BG | 19.11.2009 | ||
| IS | 19.12.2009 | ||
| PT | 21.12.2009 | ||
| Former [2010/15] | AT | 19.08.2009 | |
| CY | 19.08.2009 | ||
| FI | 19.08.2009 | ||
| LT | 19.08.2009 | ||
| LV | 19.08.2009 | ||
| NL | 19.08.2009 | ||
| PL | 19.08.2009 | ||
| SI | 19.08.2009 | ||
| IS | 19.12.2009 | Cited in | International search | [A] VAN WYK W F: "Implementation of a modern microprocessor based voltage quality recorder", AFRICON, 1996., IEEE AFRICON 4TH STELLENBOSCH, SOUTH AFRICA 24-27 SEPT. 1996, NEW YORK, NY, USA,IEEE, US, vol. 2, 24 September 1996 (1996-09-24), pages 1024 - 1028, XP010207957, ISBN: 0-7803-3019-6 [A] 1,12 * page 1026, column 2, paragraph LAST * * figures 1,4 * DOI: http://dx.doi.org/10.1109/AFRCON.1996.563037 |