blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1943862

EP1943862 - PS HANDOVER SUPPORT INDICATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.04.2014
Database last updated on 25.09.2024
Most recent event   Tooltip17.07.2015Lapse of the patent in a contracting state
New state(s): HU, LU
published on 19.08.2015  [2015/34]
Applicant(s)For all designated states
Intellectual Ventures I LLC
2711 Centerville Road, Suite 400
Wilmington, DE 19808 / US
[2011/44]
Former [2011/42]For all designated states
Intellectual Ventures I LLC
3150 139th Avenue SE, Building 4
Bellevue WA 98005 / US
Former [2008/30]For all designated states
Spyder Navigations L.L.C.
1209 Orange Street
Wilmington, DE 19801 / US
Former [2008/29]For all designated states
Nokia Corporation
Keilalahdentie 4
02150 Espoo / FI
For all designated states
Spyder Navigations L.L.C.
1209 Orange Street
Wilmington, DE 19801 / US
Inventor(s)01 / HWANG, Woonhee
Juhanintie 6a
FIN-02180 Espoo / FI
 [2008/29]
Representative(s)Small, Gary James, et al
Carpmaels & Ransford LLP
One Southampton Row
London WC1B 5HA / GB
[N/P]
Former [2010/44]Small, Gary James, et al
Carpmaels & Ransford One Southampton Row London
WC1B 5HA / GB
Former [2008/29]Roberts, Mark Peter
J.A. Kemp & Co. 14 South Square Gray's Inn
London WC1R 5JJ / GB
Application number, filing date06820837.001.11.2006
[2008/29]
WO2006IB03072
Priority number, dateUS20050732681P01.11.2005         Original published format: US 732681 P
[2008/29]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2007052130
Date:10.05.2007
Language:EN
[2007/19]
Type: A2 Application without search report 
No.:EP1943862
Date:16.07.2008
Language:EN
The application published by WIPO in one of the EPO official languages on 10.05.2007 takes the place of the publication of the European patent application.
[2008/29]
Type: B1 Patent specification 
No.:EP1943862
Date:12.06.2013
Language:EN
[2013/24]
Search report(s)International search report - published on:SE19.07.2007
(Supplementary) European search report - dispatched on:EP15.12.2009
ClassificationIPC:H04W36/00
[2012/44]
CPC:
H04W36/0066 (EP,KR,US); H04W36/0061 (KR); H04W36/00222 (KR);
H04W36/10 (EP,KR,US); H04W36/14 (KR); H04W92/22 (EP,US)
Former IPC [2008/29]H04Q7/38, H04B7/005, H04L12/56
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2008/29]
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:ANZEIGE EINER PS-WEITERLEITUNGS-UNTERSTÜTZUNG[2008/29]
English:PS HANDOVER SUPPORT INDICATION[2008/29]
French:INDICATION D'ACCEPTATION DE TRANSFERT PAR COMMUTATION PAR PAQUETS[2008/29]
Entry into regional phase10.04.2008National basic fee paid 
10.04.2008Search fee paid 
10.04.2008Designation fee(s) paid 
10.04.2008Examination fee paid 
Examination procedure11.06.2007Request for preliminary examination filed
International Preliminary Examining Authority: SE
10.04.2008Amendment by applicant (claims and/or description)
10.04.2008Examination requested  [2008/29]
05.03.2010Despatch of a communication from the examining division (Time limit: M04)
02.07.2010Reply to a communication from the examining division
08.05.2012Despatch of a communication from the examining division (Time limit: M04)
18.09.2012Reply to a communication from the examining division
20.11.2012Communication of intention to grant the patent
02.04.2013Fee for grant paid
02.04.2013Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  05.03.2010
Opposition(s)13.03.2014No opposition filed within time limit [2014/21]
Fees paidRenewal fee
07.11.2008Renewal fee patent year 03
06.11.2009Renewal fee patent year 04
22.10.2010Renewal fee patent year 05
07.11.2011Renewal fee patent year 06
07.11.2012Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.11.2006
AT12.06.2013
BE12.06.2013
CY12.06.2013
CZ12.06.2013
DK12.06.2013
EE12.06.2013
FI12.06.2013
IT12.06.2013
LT12.06.2013
LV12.06.2013
MC12.06.2013
NL12.06.2013
PL12.06.2013
RO12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
TR12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
IE01.11.2013
LU01.11.2013
CH30.11.2013
LI30.11.2013
[2015/34]
Former [2015/32]AT12.06.2013
BE12.06.2013
CY12.06.2013
CZ12.06.2013
DK12.06.2013
EE12.06.2013
FI12.06.2013
IT12.06.2013
LT12.06.2013
LV12.06.2013
MC12.06.2013
NL12.06.2013
PL12.06.2013
RO12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
TR12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
IE01.11.2013
CH30.11.2013
LI30.11.2013
Former [2015/30]AT12.06.2013
BE12.06.2013
CY12.06.2013
CZ12.06.2013
DK12.06.2013
EE12.06.2013
FI12.06.2013
IT12.06.2013
LT12.06.2013
LV12.06.2013
MC12.06.2013
NL12.06.2013
PL12.06.2013
RO12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
IE01.11.2013
CH30.11.2013
LI30.11.2013
Former [2014/48]AT12.06.2013
BE12.06.2013
CZ12.06.2013
DK12.06.2013
EE12.06.2013
FI12.06.2013
IT12.06.2013
LT12.06.2013
LV12.06.2013
MC12.06.2013
NL12.06.2013
PL12.06.2013
RO12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
IE01.11.2013
CH30.11.2013
LI30.11.2013
Former [2014/34]AT12.06.2013
BE12.06.2013
CZ12.06.2013
DK12.06.2013
EE12.06.2013
FI12.06.2013
IT12.06.2013
LT12.06.2013
LV12.06.2013
MC12.06.2013
NL12.06.2013
PL12.06.2013
RO12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
CH30.11.2013
LI30.11.2013
Former [2014/33]AT12.06.2013
BE12.06.2013
CZ12.06.2013
DK12.06.2013
EE12.06.2013
FI12.06.2013
IT12.06.2013
LT12.06.2013
LV12.06.2013
MC12.06.2013
NL12.06.2013
PL12.06.2013
RO12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
Former [2014/24]AT12.06.2013
BE12.06.2013
CZ12.06.2013
DK12.06.2013
EE12.06.2013
FI12.06.2013
IT12.06.2013
LT12.06.2013
LV12.06.2013
NL12.06.2013
PL12.06.2013
RO12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
Former [2014/21]AT12.06.2013
BE12.06.2013
CZ12.06.2013
DK12.06.2013
EE12.06.2013
FI12.06.2013
LT12.06.2013
LV12.06.2013
NL12.06.2013
PL12.06.2013
RO12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
Former [2014/14]AT12.06.2013
BE12.06.2013
CZ12.06.2013
EE12.06.2013
FI12.06.2013
LT12.06.2013
LV12.06.2013
NL12.06.2013
PL12.06.2013
RO12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
Former [2014/11]AT12.06.2013
BE12.06.2013
CZ12.06.2013
EE12.06.2013
FI12.06.2013
LT12.06.2013
LV12.06.2013
PL12.06.2013
RO12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
Former [2014/10]AT12.06.2013
BE12.06.2013
CZ12.06.2013
EE12.06.2013
FI12.06.2013
LT12.06.2013
LV12.06.2013
SE12.06.2013
SI12.06.2013
SK12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
IS12.10.2013
PT14.10.2013
Former [2014/09]AT12.06.2013
BE12.06.2013
EE12.06.2013
FI12.06.2013
LT12.06.2013
LV12.06.2013
SE12.06.2013
SI12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
PT14.10.2013
Former [2014/08]BE12.06.2013
FI12.06.2013
LT12.06.2013
LV12.06.2013
SE12.06.2013
SI12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
PT14.10.2013
Former [2014/02]FI12.06.2013
LT12.06.2013
LV12.06.2013
SE12.06.2013
SI12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
Former [2013/50]FI12.06.2013
LT12.06.2013
SE12.06.2013
SI12.06.2013
BG12.09.2013
GR13.09.2013
ES23.09.2013
Former [2013/49]FI12.06.2013
LT12.06.2013
SE12.06.2013
SI12.06.2013
GR13.09.2013
ES23.09.2013
Former [2013/48]LT12.06.2013
ES23.09.2013
Former [2013/47]LT12.06.2013
Documents cited:Search[A]EP1420604  (SIEMENS MOBILE COMM SPA [IT]) [A] 1-16,18-20 * abstract ** paragraph [0024] *;
 [Y]EP1503606  (SIEMENS MOBILE COMM SPA [IT]) [Y] 1-16,18-20 * abstract * * paragraphs [0010] , [0027] - [0039] - [0058] - [0062] * * paragraphs [0069] , [0082] * * page 19; table Appendix 2 * * figure 11 *;
 [Y]WO2005027561  (NOKIA CORP [FI], et al) [Y] 1-16,18-20 * abstract * * lines 4-38 - page 4 * * page 5, lines 34-6 *
International search[Y]US2002160785  (OVESJO FREDRIK [SE], et al);
 [P]WO2005125256  (NOKIA CORP [FI], et al);
 [X]  - "Proposed Draft Input to the TS on "Packet Switched Handover for GERAN A/Gb mode; Stage 2; (Release 6) v0.1.0", 3GPP TSG GERAN2#17-BIS, NOKIA TDOC G2-040082; AGENDA ITEM 5.4.5.2, (20040112), XP003009967
 [A]  - "Digital cellular telecommunications system (Phase 2+); Packet-switched handover for GERAN A/Gb mode; Stage 2; (3GPP TS 43.129 version 6.5.0 Release 6)", ETSI TS 143 129 V6.5.0, (200511), XP014032914
by applicantEP1503606
 WO2005027561
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.