EP1958290 - PATCH ANTENNA ELEMENT AND APPLICATION THEREOF IN A PHASED ARRAY ANTENNA [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.01.2020 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 08.02.2019 | ||
Former | Grant of patent is intended Status updated on 05.02.2019 | ||
Former | Examination is in progress Status updated on 18.01.2019 | ||
Former | Grant of patent is intended Status updated on 21.10.2018 | ||
Former | Examination is in progress Status updated on 18.05.2018 | Most recent event Tooltip | 09.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 11.08.2021 [2021/32] | Applicant(s) | For all designated states Elta Systems Ltd. 100 Sderot Itzhak Hanasie P.O.B. 330 77102 Ashdod / IL | [2019/11] |
Former [2008/34] | For all designated states Elta Systems Ltd. 100 Sderot Itzhak Hanasie P.O.B. 330 77102 Ashdod / IL | Inventor(s) | 01 /
ILUZ, Zeev 19/2 Revivim Street 70800 Gan-yavne / IL | 02 /
BAUER, Reuven 14/9 Hahagana Street 76214 Rehovot / IL | [2008/34] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2019/11] |
Former [2012/32] | Vossius & Partner P.O. Box 86 07 67 81634 München / DE | ||
Former [2011/36] | Diehl & Partner GbR Patentanwälte Augustenstrasse 46 80333 München / DE | ||
Former [2008/34] | Diehl, Hermann O. Th. Diehl & Partner Augustenstrasse 46 80333 München / DE | Application number, filing date | 06821574.8 | 23.11.2006 | [2008/34] | WO2006IL01354 | Priority number, date | US20050296569 | 08.12.2005 Original published format: US 296569 | [2008/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2007066322 | Date: | 14.06.2007 | Language: | EN | [2007/24] | Type: | A1 Application with search report | No.: | EP1958290 | Date: | 20.08.2008 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.06.2007 takes the place of the publication of the European patent application. | [2008/34] | Type: | B1 Patent specification | No.: | EP1958290 | Date: | 13.03.2019 | Language: | EN | [2019/11] | Search report(s) | International search report - published on: | EP | 14.06.2007 | Classification | IPC: | H01Q9/04, H01Q21/06 | [2008/34] | CPC: |
H01Q9/0407 (EP,US);
H01Q21/065 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2019/11] |
Former [2008/34] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | PATCH-ANTENNENELEMENT UND SEINE ANWENDUNG IN EINER PHASENGESTEUERTEN GRUPPENANTENNE | [2008/34] | English: | PATCH ANTENNA ELEMENT AND APPLICATION THEREOF IN A PHASED ARRAY ANTENNA | [2008/34] | French: | ELEMENT D'ANTENNE A PLAQUE ET SON APPLICATION DANS UNE ANTENNE RESEAU A COMMANDE DE PHASE | [2008/34] | Entry into regional phase | 31.03.2008 | National basic fee paid | 31.03.2008 | Designation fee(s) paid | 31.03.2008 | Examination fee paid | Examination procedure | 02.10.2007 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 31.03.2008 | Examination requested [2008/34] | 04.11.2008 | Despatch of a communication from the examining division (Time limit: M06) | 25.03.2009 | Reply to a communication from the examining division | 27.01.2010 | Despatch of a communication from the examining division (Time limit: M06) | 29.07.2010 | Reply to a communication from the examining division | 15.02.2012 | Date of oral proceedings | 14.03.2012 | Despatch of communication that the application is refused, reason: substantive examination {1} | 14.03.2012 | Minutes of oral proceedings despatched | 08.05.2018 | Despatch of a communication from the examining division (Time limit: M04) | 05.09.2018 | Reply to a communication from the examining division | 22.10.2018 | Communication of intention to grant the patent | 15.01.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 15.01.2019 | Fee for grant paid | 15.01.2019 | Fee for publishing/printing paid | 05.02.2019 | Information about intention to grant a patent | 05.02.2019 | Receipt of the translation of the claim(s) | Appeal following examination | 21.05.2012 | Appeal received No. T1732/12 | 20.07.2012 | Statement of grounds filed | 20.11.2017 | Result of appeal procedure: remittal for grant | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.11.2008 | Opposition(s) | 16.12.2019 | No opposition filed within time limit [2020/08] | Fees paid | Renewal fee | 31.03.2008 | Renewal fee patent year 03 | 23.11.2009 | Renewal fee patent year 04 | 30.11.2010 | Renewal fee patent year 05 | 22.11.2011 | Renewal fee patent year 06 | 23.11.2012 | Renewal fee patent year 07 | 29.11.2013 | Renewal fee patent year 08 | 24.11.2014 | Renewal fee patent year 09 | 25.11.2015 | Renewal fee patent year 10 | 25.11.2016 | Renewal fee patent year 11 | 27.11.2017 | Renewal fee patent year 12 | 29.11.2018 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.11.2006 | AT | 13.03.2019 | CY | 13.03.2019 | CZ | 13.03.2019 | DK | 13.03.2019 | EE | 13.03.2019 | ES | 13.03.2019 | FI | 13.03.2019 | IT | 13.03.2019 | LT | 13.03.2019 | LV | 13.03.2019 | MC | 13.03.2019 | NL | 13.03.2019 | PL | 13.03.2019 | RO | 13.03.2019 | SE | 13.03.2019 | SI | 13.03.2019 | SK | 13.03.2019 | TR | 13.03.2019 | BG | 13.06.2019 | GR | 14.06.2019 | IS | 13.07.2019 | PT | 13.07.2019 | GB | 23.11.2019 | IE | 23.11.2019 | LU | 23.11.2019 | BE | 30.11.2019 | CH | 30.11.2019 | LI | 30.11.2019 | [2021/32] |
Former [2021/26] | AT | 13.03.2019 | |
CY | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
GB | 23.11.2019 | ||
IE | 23.11.2019 | ||
LU | 23.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/51] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
GB | 23.11.2019 | ||
IE | 23.11.2019 | ||
LU | 23.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/48] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
GB | 23.11.2019 | ||
IE | 23.11.2019 | ||
LU | 23.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/46] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
IE | 23.11.2019 | ||
LU | 23.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/36] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
LU | 23.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/35] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
LU | 23.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/34] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/17] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/13] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/09] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/04] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/03] | AT | 13.03.2019 | |
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2020/01] | CZ | 13.03.2019 | |
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/49] | CZ | 13.03.2019 | |
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RO | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/48] | ES | 13.03.2019 | |
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/47] | ES | 13.03.2019 | |
FI | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/46] | FI | 13.03.2019 | |
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/39] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/38] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/37] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
SE | 13.03.2019 | ||
GR | 14.06.2019 | ||
Former [2019/34] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
SE | 13.03.2019 | ||
Former [2019/33] | FI | 13.03.2019 | |
LT | 13.03.2019 | Cited in | International search | [X]EP0892461 (NORTHERN TELECOM LTD [CA]) [X] 1-9,14-20,22-27 * column 5, line 24 - column 10, line 2 * * figures 1-12 * * abstract *; | [X] - ZAVOSH F ET AL, "INFINITE PHASED ARRAYS OF CAVITY-BACKED PATCHES", IEEE TRANSACTIONS ON ANTENNAS AND PROPAGATION, IEEE SERVICE CENTER, PISCATAWAY, NJ, US, (19940301), vol. 42, no. 3, ISSN 0018-926X, pages 390 - 398, XP000440790 [X] 1-7,9-12,19,22-27 * page 390, paragraph 1; figure 1 * * page 394; figures 3,4; tables 1,2 * * abstract * DOI: http://dx.doi.org/10.1109/8.280726 | [X] - CHENG J-C ET AL, "THEORETICAL MODELING OF CAVITY-BACKED PATCH ANTENNAS USING A HYBRIDTECHNIQUE", IEEE TRANSACTIONS ON ANTENNAS AND PROPAGATION, IEEE SERVICE CENTER, PISCATAWAY, NJ, US, (19950901), vol. 43, no. 9, ISSN 0018-926X, pages 1003 - 1013, XP000522593 [X] 1-6,8,9,12,13,19 * the whole document * DOI: http://dx.doi.org/10.1109/8.410218 | Examination | - GONZALEZ M A ET AL, "Analysis of cavity-backed microstrip antennas by a 3-D finite element/segmentation method and a matrix Lanczos-Pade algorithm (SFELP)", IEEE ANTENNAS AND WIRELESS PROPAGATION LETTERS, IEEE, PISCATAWAY, NJ, US, (20020101), vol. 1, no. 11, doi:10.1109/LAWP.2002.807783, ISSN 1536-1225, pages 193 - 195, XP011095577 DOI: http://dx.doi.org/10.1109/LAWP.2002.807783 |