EP1941008 - STEAM REFORMING UNIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.03.2019 Database last updated on 22.01.2025 | |
Former | The patent has been granted Status updated on 30.03.2018 | ||
Former | Grant of patent is intended Status updated on 15.11.2017 | ||
Former | Examination is in progress Status updated on 09.11.2016 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): CY, IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Intelligent Energy, Inc. 2955 Redondo Avenue Long Beach, CA 90806 / US | [2018/18] |
Former [2008/28] | For all designated states Intelligent Energy, Inc. 2955 Redondo Avenue Long Beach, CA 90806 / US | Inventor(s) | 01 /
WOODS, Richard, Root 10 Valley View Irvine, CA 92612 / US | 02 /
PORTER, Brook, Forest Primafuel, Inc. 2774 Dawson Avenue Signal Hill, CA 90755 / US | 03 /
DURAISWAMY, Kandaswamy 8452 Spring Circle Huntington Beach, CA 92646 / US | 04 /
WESCHTA, Leonardo 4591 Orange Avenue, 302 Long Beach, CA 90807 / US | 05 /
HULTEBERG, Christian Ribevagen 16A Malmo 21746 / SE | [2018/18] |
Former [2008/37] | 01 /
WOODS, Richard, Root 10 Valley View Irvine, CA 92612 / US | ||
02 /
PORTER, Brook, Forest Primafuel, Inc. 2774 Dawson Avenue Signal Hill, CA 90755 / US | |||
03 /
DURAISWAMY, Kandaswamy 8452 Spring Circle Huntington Beach, CA 92646 / US | |||
04 /
WESCHTA, Leonardo 4591 Orange Avenue, 302 Long Beach, CA 90807 / US | |||
05 /
HULTEBERG, Christian Ribevagen 16A Malmo 21746 / SE | |||
Former [2008/28] | 01 /
WOODS, Richard, Root 10 Valley View Irvine, CA 92612 / US | ||
02 /
PORTER, Brook, Forest 13004 West Pacific Promenade, 119 Playa Vista, CA 90094 / US | |||
03 /
DURAISWAMY, Kandaswamy 8452 Spring Circle Huntington Beach, CA 92646 / US | |||
04 /
WESCHTA, Leonardo 4591 Orange Avenue, 302 Long Beach, CA 90807 / US | |||
05 /
HULTEBERG, Christian Ribevagen 16A Malmo 21746 / SE | Representative(s) | Creation IP Ltd Hillington Park Innovation Centre 1 Ainslie Road Glasgow G52 4RU / GB | [2018/18] |
Former [2008/28] | Crease, Devanand John, et al Keltie Fleet Place House 2 Fleet Place London EC4M 7ET / GB | Application number, filing date | 06826333.4 | 17.10.2006 | [2008/28] | WO2006US40997 | Priority number, date | US20050727636P | 17.10.2005 Original published format: US 727636 P | US20060829483P | 13.10.2006 Original published format: US 829483 P | [2008/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2007047898 | Date: | 26.04.2007 | Language: | EN | [2007/17] | Type: | A1 Application with search report | No.: | EP1941008 | Date: | 09.07.2008 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.04.2007 takes the place of the publication of the European patent application. | [2008/28] | Type: | B1 Patent specification | No.: | EP1941008 | Date: | 02.05.2018 | Language: | EN | [2018/18] | Search report(s) | International search report - published on: | US | 26.04.2007 | (Supplementary) European search report - dispatched on: | EP | 14.05.2012 | Classification | IPC: | C01B3/00, B01J8/04, C01B3/38, B01J19/24, C01B3/48 | [2012/24] | CPC: |
C01B3/384 (EP,US);
B01J19/249 (EP,US);
B01J8/0407 (EP,US);
B01J8/0419 (EP,US);
B01J8/0438 (EP,US);
B01J8/0442 (EP,US);
C01B3/0005 (EP,US);
C01B3/382 (EP,US);
C01B3/48 (EP,US);
B01J2208/00309 (EP,US);
B01J2208/00504 (EP,US);
B01J2208/0053 (EP,US);
B01J2208/022 (EP,US);
B01J2219/1943 (EP,US);
B01J2219/2453 (EP,US);
B01J2219/2458 (EP,US);
B01J2219/246 (EP,US);
B01J2219/2462 (EP,US);
B01J2219/2464 (EP,US);
B01J2219/2465 (EP,US);
B01J2219/247 (EP,US);
B01J2219/2479 (EP,US);
B01J2219/2481 (EP,US);
B01J2219/2482 (EP,US);
B01J2219/2491 (EP,US);
B01J2219/2493 (EP,US);
B01J2219/2495 (EP,US);
B01J2219/2496 (EP,US);
B01J2219/2498 (EP,US);
C01B2203/0233 (EP,US);
C01B2203/0283 (EP,US);
C01B2203/04 (EP,US);
C01B2203/0811 (EP,US);
C01B2203/0822 (EP,US);
C01B2203/0827 (EP,US);
C01B2203/1288 (EP,US);
C01B2203/142 (EP,US);
C01B2203/143 (EP,US);
Y02E60/32 (EP,US);
|
Former IPC [2008/28] | C10J3/06, C10B1/04, C01B3/32, B01J8/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2018/18] |
Former [2008/28] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | DAMPFREFORMIERUNGSEINHEIT | [2008/28] | English: | STEAM REFORMING UNIT | [2008/28] | French: | UNITE DE REFORMAGE A LA VAPEUR | [2008/28] | Entry into regional phase | 16.05.2008 | National basic fee paid | 16.05.2008 | Search fee paid | 16.05.2008 | Designation fee(s) paid | 16.05.2008 | Examination fee paid | Examination procedure | 16.05.2008 | Examination requested [2008/28] | 29.11.2012 | Amendment by applicant (claims and/or description) | 27.06.2016 | Despatch of a communication from the examining division (Time limit: M04) | 07.11.2016 | Reply to a communication from the examining division | 16.11.2017 | Communication of intention to grant the patent | 26.03.2018 | Fee for grant paid | 26.03.2018 | Fee for publishing/printing paid | 26.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.06.2016 | Opposition(s) | 05.02.2019 | No opposition filed within time limit [2019/15] | Fees paid | Renewal fee | 27.10.2008 | Renewal fee patent year 03 | 26.10.2009 | Renewal fee patent year 04 | 25.10.2010 | Renewal fee patent year 05 | 27.10.2011 | Renewal fee patent year 06 | 25.10.2012 | Renewal fee patent year 07 | 28.10.2013 | Renewal fee patent year 08 | 27.10.2014 | Renewal fee patent year 09 | 27.10.2015 | Renewal fee patent year 10 | 27.10.2016 | Renewal fee patent year 11 | 27.10.2017 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.10.2006 | AT | 02.05.2018 | CY | 02.05.2018 | CZ | 02.05.2018 | DK | 02.05.2018 | EE | 02.05.2018 | ES | 02.05.2018 | FI | 02.05.2018 | IT | 02.05.2018 | LT | 02.05.2018 | LV | 02.05.2018 | MC | 02.05.2018 | NL | 02.05.2018 | PL | 02.05.2018 | RO | 02.05.2018 | SE | 02.05.2018 | SI | 02.05.2018 | SK | 02.05.2018 | TR | 02.05.2018 | BG | 02.08.2018 | GR | 03.08.2018 | IS | 02.09.2018 | PT | 03.09.2018 | GB | 17.10.2018 | IE | 17.10.2018 | LU | 17.10.2018 | BE | 31.10.2018 | CH | 31.10.2018 | FR | 31.10.2018 | LI | 31.10.2018 | [2020/32] |
Former [2020/30] | HU | 17.10.2006 | |
AT | 02.05.2018 | ||
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
TR | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
GB | 17.10.2018 | ||
IE | 17.10.2018 | ||
LU | 17.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
FR | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2020/16] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
TR | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
GB | 17.10.2018 | ||
IE | 17.10.2018 | ||
LU | 17.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
FR | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/48] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
GB | 17.10.2018 | ||
IE | 17.10.2018 | ||
LU | 17.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
FR | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/47] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
GB | 17.10.2018 | ||
LU | 17.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
FR | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/39] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
LU | 17.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
FR | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/38] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
LU | 17.10.2018 | ||
BE | 31.10.2018 | ||
FR | 31.10.2018 | ||
Former [2019/30] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
LU | 17.10.2018 | ||
Former [2019/28] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/26] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/11] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/10] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/09] | DK | 02.05.2018 | |
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/08] | DK | 02.05.2018 | |
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/03] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2018/52] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
GR | 03.08.2018 | ||
Former [2018/51] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
Former [2018/49] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
Former [2018/47] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
LT | 02.05.2018 | Documents cited: | Search | [A]WO0200548 (UOP LLC [US], et al) [A] 1-15 * page 6, line 27 - page 11, line 33; figures 1,2 *; | [A]WO02064248 (BATTELLE MEMORIAL INSTITUTE [US]) [A] 1-15 * page 33, line 1 - page 34, line 15; figure 18 ** page 38, line 32; figure 19c *; | [AD]US6835354 (WOODS RICHARD [US], et al) [AD] 1-15 * column 5, line 63 - column 9, line 14; figure 1 * * column 12, line 55 - column 15, line 2; figures 9-12 * * column 3, line 64 - column 4, line 19 * * column 14, line 66 - column 15, line 2 * | International search | [A]US5980843 (SILVERSAND FREDRIK AHLSTROEM [SE]); | [A]US6835354 (WOODS RICHARD [US], et al) |