EP1942247 - Method and apparatus to drill in the soil by displacement [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2010 Database last updated on 02.11.2024 | Most recent event Tooltip | 10.08.2012 | Lapse of the patent in a contracting state New state(s): CY | published on 12.09.2012 [2012/37] | Applicant(s) | For all designated states BAUER Maschinen GmbH Wittelsbacherstrasse 5 86529 Schrobenhausen / DE | [2008/28] | Inventor(s) | 01 /
Stötzer, Erwin Emil Am Plattenberg 11 86551 Aichach / DE | 02 /
Wenger, Robert Mozartstrasse 24 86551 Aichach / DE | [2008/28] | Representative(s) | Wunderlich, Rainer, et al Weber & Heim Patentanwälte Partnerschaftsgesellschaft mbB Irmgardstrasse 3 81479 München / DE | [N/P] |
Former [2008/28] | Wunderlich, Rainer, et al Patentanwälte Weber & Heim Irmgardstrasse 3 81479 München / DE | Application number, filing date | 07000129.2 | 04.01.2007 | [2008/28] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP1942247 | Date: | 09.07.2008 | Language: | DE | [2008/28] | Type: | B1 Patent specification | No.: | EP1942247 | Date: | 08.04.2009 | Language: | DE | [2009/15] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.06.2007 | Classification | IPC: | E21B7/26, E21B49/00 | [2008/28] | CPC: |
E21B49/003 (EP,US);
E21B7/26 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2008/28] | Title | German: | Verfahren und Vorrichtung zum Erstellen einer Bohrung im Boden durch Verdrängerbohren | [2008/28] | English: | Method and apparatus to drill in the soil by displacement | [2008/28] | French: | Méthode et dispositif pour forer dans le sol par refoulement | [2008/28] | Examination procedure | 06.08.2007 | Examination requested [2008/28] | 10.09.2007 | Despatch of a communication from the examining division (Time limit: M04) | 02.10.2007 | Reply to a communication from the examining division | 23.10.2007 | Despatch of a communication from the examining division (Time limit: M04) | 14.01.2008 | Reply to a communication from the examining division | 11.08.2008 | Communication of intention to grant the patent | 19.11.2008 | Fee for grant paid | 19.11.2008 | Fee for publishing/printing paid | Opposition(s) | 11.01.2010 | No opposition filed within time limit [2010/11] | Fees paid | Renewal fee | 28.01.2009 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 08.04.2009 | CZ | 08.04.2009 | EE | 08.04.2009 | FI | 08.04.2009 | LT | 08.04.2009 | LV | 08.04.2009 | RO | 08.04.2009 | SI | 08.04.2009 | SK | 08.04.2009 | BG | 08.07.2009 | SE | 08.07.2009 | GR | 09.07.2009 | IS | 08.08.2009 | [2012/37] |
Former [2011/26] | CZ | 08.04.2009 | |
EE | 08.04.2009 | ||
FI | 08.04.2009 | ||
LT | 08.04.2009 | ||
LV | 08.04.2009 | ||
RO | 08.04.2009 | ||
SI | 08.04.2009 | ||
SK | 08.04.2009 | ||
BG | 08.07.2009 | ||
SE | 08.07.2009 | ||
GR | 09.07.2009 | ||
IS | 08.08.2009 | ||
Former [2011/19] | CZ | 08.04.2009 | |
EE | 08.04.2009 | ||
FI | 08.04.2009 | ||
LT | 08.04.2009 | ||
LV | 08.04.2009 | ||
RO | 08.04.2009 | ||
SI | 08.04.2009 | ||
SK | 08.04.2009 | ||
BG | 08.07.2009 | ||
SE | 08.07.2009 | ||
GR | 09.07.2009 | ||
IS | 08.08.2009 | ||
IT | 04.01.2010 | ||
Former [2011/06] | CZ | 08.04.2009 | |
EE | 08.04.2009 | ||
FI | 08.04.2009 | ||
LT | 08.04.2009 | ||
LV | 08.04.2009 | ||
RO | 08.04.2009 | ||
SI | 08.04.2009 | ||
SK | 08.04.2009 | ||
BG | 08.07.2009 | ||
SE | 08.07.2009 | ||
GR | 09.07.2009 | ||
IS | 08.08.2009 | ||
Former [2010/17] | CZ | 08.04.2009 | |
EE | 08.04.2009 | ||
FI | 08.04.2009 | ||
LT | 08.04.2009 | ||
LV | 08.04.2009 | ||
RO | 08.04.2009 | ||
SI | 08.04.2009 | ||
SK | 08.04.2009 | ||
BG | 08.07.2009 | ||
SE | 08.07.2009 | ||
IS | 08.08.2009 | ||
Former [2010/15] | CZ | 08.04.2009 | |
EE | 08.04.2009 | ||
FI | 08.04.2009 | ||
LT | 08.04.2009 | ||
LV | 08.04.2009 | ||
RO | 08.04.2009 | ||
SI | 08.04.2009 | ||
SK | 08.04.2009 | ||
SE | 08.07.2009 | ||
IS | 08.08.2009 | ||
Former [2010/04] | FI | 08.04.2009 | |
LT | 08.04.2009 | ||
LV | 08.04.2009 | ||
SI | 08.04.2009 | ||
SE | 08.07.2009 | ||
IS | 08.08.2009 | Documents cited: | Search | [A]EP0401119 (SOLETANCHE [FR]) [A] 1,11 * abstract *; | [A]JPH06299531 (KOKUDO KISO KK, et al) [A] 1,11* abstract *; | [X]EP1229172 (CIE DU SOL [FR]) [X] 1-11 * the whole document *; | [X]EP1277887 (CIE DU SOL [FR]) [X] 1,11 * column 5, line 10, paragraph 35 - line 14; figure 6 *; | [X]US2005100415 (LAROVERE TOM A [US]) [X] 11 * abstract * | Examination | US2002090271 |