| EP1914453 - Transmission shift system [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.08.2012 Database last updated on 18.03.2026 | Most recent event Tooltip | 10.08.2012 | No opposition filed within time limit | published on 12.09.2012 [2012/37] | Applicant(s) | For all designated states Deere & Company One John Deere Place Moline, IL 61265 / US | [N/P] |
| Former [2008/17] | For all designated states DEERE & COMPANY One John Deere Place Moline, Illinois 61265 / US | Inventor(s) | 01 /
Miller, Jeffrey David 701, Walnut Ridge Street 52068 Peosta Iowa / US | 02 /
Fleischmann, Steve Gary 13498 Derby Grange Road Dubuque, Iowa 52002 / US | 03 /
French, Timothy Bernard 4995 Twilight Drive 52002 Dubuque Iowa / US | [2008/17] | Representative(s) | Sawodny, Michael-Wolfgang Dreiköniggasse 10 89073 Ulm / DE | [2011/40] |
| Former [2008/17] | Sawodny, Michael-Wolfgang Dreiköniggasse 10 89073 Ulm / DE | Application number, filing date | 07009878.5 | 18.05.2007 | [2008/17] | Priority number, date | US20060550072 | 17.10.2006 Original published format: US 550072 | [2008/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP1914453 | Date: | 23.04.2008 | Language: | EN | [2008/17] | Type: | A3 Search report | No.: | EP1914453 | Date: | 22.09.2010 | [2010/38] | Type: | B1 Patent specification | No.: | EP1914453 | Date: | 05.10.2011 | Language: | EN | [2011/40] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.08.2010 | Classification | IPC: | F16H61/12, F16H61/02 | [2008/17] | CPC: |
F16H61/12 (EP,US);
F16H2061/122 (EP,US);
F16H2061/1232 (EP,US);
F16H61/686 (EP,US)
| Designated contracting states | DE, GB, SE [2011/21] |
| Former [2008/17] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | Getriebeschaltsystem | [2008/17] | English: | Transmission shift system | [2008/17] | French: | Système de changement de rapport | [2008/17] | Examination procedure | 17.12.2010 | Amendment by applicant (claims and/or description) | 17.12.2010 | Examination requested [2011/04] | 11.03.2011 | Communication of intention to grant the patent | 23.03.2011 | Loss of particular rights, legal effect: designated state(s) | 10.05.2011 | Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, DK, EE, ES, FI, FR, GR, HU, IE, IS, IT, LT, LU, LV, MC, MT, NL, PL, PT, RO, SI, SK, TR | 30.06.2011 | Fee for grant paid | 30.06.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.03.2011 | Opposition(s) | 06.07.2012 | No opposition filed within time limit [2012/37] | Fees paid | Renewal fee | 27.05.2009 | Renewal fee patent year 03 | 25.05.2010 | Renewal fee patent year 04 | 25.05.2011 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | SE | 05.10.2011 | [2012/24] | Documents cited: | Search | [XI] US5492523 (LEONARD ALLAN S et al.) [X] 1,14 * column 4, paragraph 14 - paragraph 37 * * figure 3 *[I] 9,22 | [X] US5213013 (FUJIWARA TAKUJI et al.) [X] 10,23 * figure 3 * | [A] GB2217029 (FUJI HEAVY IND LTD et al.) [A] 1,2,10,11,14,15,23,24 * abstract * | [A] US6577935 (PETZOLD RAINER et al.) [A] 1,10,14,23 * paragraph [0021] * | [A] US5383379 (NIIYAMA TSUNEFUMI et al.) [A] 10,23 * column 3, line 62 - column 4, line 27 * |