EP1926057 - Bill depositing/withdrawing apparatus and method of controlling the same [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.02.2011 Database last updated on 06.07.2024 | Most recent event Tooltip | 13.09.2013 | Lapse of the patent in a contracting state Updated state(s): BG | published on 16.10.2013 [2013/42] | Applicant(s) | For all designated states Hitachi-Omron Terminal Solutions, Corp. 6-3 Ohsaki 1-chome Shinagawa-ku Tokyo 141-0032 / JP | [2008/22] | Inventor(s) | 01 /
Yokoi, Toshinori c/o Hitachi, Ltd. Intellectual Property Group 12F, Marunouchi Center Building 6-1, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8220 / JP | 02 /
Kato, Riichi c/o Hitachi, Ltd. Intellectual Property Group 12F, Marunouchi Center Building 6-1, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8220 / JP | 03 /
Kadowaki, Minoru c/o Hitachi, Ltd. Intellectual Property Group 12F, Marunouchi Center Building 6-1, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8220 / JP | 04 /
Shibata, Shinji c/o Hitachi, Ltd. Intellectual Property Group 12F, Marunouchi Center Building 6-1, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8220 / JP | 05 /
Fujita, Junji c/o Hitachi, Ltd. Intellectual Property Group 12F, Marunouchi Center Building 6-1, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8220 / JP | [2008/22] | Representative(s) | Strehl Schübel-Hopf & Partner Maximilianstrasse 54 80538 München / DE | [2008/22] | Application number, filing date | 07022493.6 | 20.11.2007 | [2008/22] | Priority number, date | JP20060316748 | 24.11.2006 Original published format: JP 2006316748 | [2008/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP1926057 | Date: | 28.05.2008 | Language: | EN | [2008/22] | Type: | B1 Patent specification | No.: | EP1926057 | Date: | 14.04.2010 | Language: | EN | [2010/15] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.04.2008 | Classification | IPC: | G07D11/00, G07F19/00 | [2008/22] | CPC: |
G07F19/203 (EP,US);
G07F19/00 (KR);
B65H31/3027 (EP);
G07D11/14 (EP,US);
G07D9/00 (KR);
G07F19/20 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2008/22] | Title | German: | Vorrichtung zum Ein/Auszahlen von Banknoten und Steuerverfahren dafür | [2009/44] | English: | Bill depositing/withdrawing apparatus and method of controlling the same | [2008/22] | French: | Appareil de dépôt/retrait de billets de banque et son procédé de contrôle | [2010/15] |
Former [2008/22] | Rechnungsablage-/entnahmevorrichtung und Steuerverfahren dafür | ||
Former [2008/22] | Appareil de dépôt/retrait de factures et son procédé de contrôle | Examination procedure | 31.03.2008 | Examination requested [2008/22] | 12.08.2008 | Despatch of a communication from the examining division (Time limit: M04) | 12.08.2008 | Reply to a communication from the examining division | 04.06.2009 | Communication of intention to grant the patent | 09.10.2009 | Fee for grant paid | 09.10.2009 | Fee for publishing/printing paid | Divisional application(s) | EP08014396.9 / EP2017799 | EP09009841.9 / EP2116980 | EP10010105.4 / EP2267667 | EP10010106.2 / EP2267668 | Opposition(s) | 17.01.2011 | No opposition filed within time limit [2011/12] | Fees paid | Renewal fee | 24.11.2009 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 14.04.2010 | BE | 14.04.2010 | CZ | 14.04.2010 | DK | 14.04.2010 | EE | 14.04.2010 | FI | 14.04.2010 | IT | 14.04.2010 | LT | 14.04.2010 | LV | 14.04.2010 | MT | 14.04.2010 | NL | 14.04.2010 | PL | 14.04.2010 | RO | 14.04.2010 | SE | 14.04.2010 | SI | 14.04.2010 | SK | 14.04.2010 | TR | 14.04.2010 | CY | 26.05.2010 | BG | 14.07.2010 | GR | 15.07.2010 | ES | 25.07.2010 | IS | 14.08.2010 | PT | 16.08.2010 | HU | 15.10.2010 | IE | 20.11.2010 | LU | 20.11.2010 | FR | 30.11.2010 | MC | 30.11.2010 | [2013/42] |
Former [2012/47] | AT | 14.04.2010 | |
BE | 14.04.2010 | ||
BG | 14.04.2010 | ||
CZ | 14.04.2010 | ||
DK | 14.04.2010 | ||
EE | 14.04.2010 | ||
FI | 14.04.2010 | ||
IT | 14.04.2010 | ||
LT | 14.04.2010 | ||
LV | 14.04.2010 | ||
MT | 14.04.2010 | ||
NL | 14.04.2010 | ||
PL | 14.04.2010 | ||
RO | 14.04.2010 | ||
SE | 14.04.2010 | ||
SI | 14.04.2010 | ||
SK | 14.04.2010 | ||
TR | 14.04.2010 | ||
CY | 26.05.2010 | ||
GR | 15.07.2010 | ||
ES | 25.07.2010 | ||
IS | 14.08.2010 | ||
PT | 16.08.2010 | ||
HU | 15.10.2010 | ||
IE | 20.11.2010 | ||
LU | 20.11.2010 | ||
FR | 30.11.2010 | ||
MC | 30.11.2010 | ||
Former [2012/44] | AT | 14.04.2010 | |
BE | 14.04.2010 | ||
BG | 14.04.2010 | ||
CZ | 14.04.2010 | ||
DK | 14.04.2010 | ||
EE | 14.04.2010 | ||
FI | 14.04.2010 | ||
IT | 14.04.2010 | ||
LT | 14.04.2010 | ||
LV | 14.04.2010 | ||
MT | 14.04.2010 | ||
NL | 14.04.2010 | ||
PL | 14.04.2010 | ||
RO | 14.04.2010 | ||
SE | 14.04.2010 | ||
SI | 14.04.2010 | ||
SK | 14.04.2010 | ||
CY | 26.05.2010 | ||
GR | 15.07.2010 | ||
ES | 25.07.2010 | ||
IS | 14.08.2010 | ||
PT | 16.08.2010 | ||
HU | 15.10.2010 | ||
IE | 20.11.2010 | ||
LU | 20.11.2010 | ||
FR | 30.11.2010 | ||
MC | 30.11.2010 | ||
Former [2012/42] | AT | 14.04.2010 | |
BE | 14.04.2010 | ||
BG | 14.04.2010 | ||
CZ | 14.04.2010 | ||
DK | 14.04.2010 | ||
EE | 14.04.2010 | ||
FI | 14.04.2010 | ||
IT | 14.04.2010 | ||
LT | 14.04.2010 | ||
LV | 14.04.2010 | ||
MT | 14.04.2010 | ||
NL | 14.04.2010 | ||
PL | 14.04.2010 | ||
RO | 14.04.2010 | ||
SE | 14.04.2010 | ||
SI | 14.04.2010 | ||
SK | 14.04.2010 | ||
CY | 26.05.2010 | ||
GR | 15.07.2010 | ||
ES | 25.07.2010 | ||
IS | 14.08.2010 | ||
PT | 16.08.2010 | ||
HU | 15.10.2010 | ||
IE | 20.11.2010 | ||
FR | 30.11.2010 | ||
MC | 30.11.2010 | ||
Former [2012/41] | AT | 14.04.2010 | |
BE | 14.04.2010 | ||
BG | 14.04.2010 | ||
CZ | 14.04.2010 | ||
DK | 14.04.2010 | ||
EE | 14.04.2010 | ||
FI | 14.04.2010 | ||
IT | 14.04.2010 | ||
LT | 14.04.2010 | ||
LV | 14.04.2010 | ||
MT | 14.04.2010 | ||
NL | 14.04.2010 | ||
PL | 14.04.2010 | ||
RO | 14.04.2010 | ||
SE | 14.04.2010 | ||
SI | 14.04.2010 | ||
SK | 14.04.2010 | ||
CY | 26.05.2010 | ||
GR | 15.07.2010 | ||
ES | 25.07.2010 | ||
IS | 14.08.2010 | ||
PT | 16.08.2010 | ||
IE | 20.11.2010 | ||
FR | 30.11.2010 | ||
MC | 30.11.2010 | ||
Former [2012/05] | AT | 14.04.2010 | |
BE | 14.04.2010 | ||
CZ | 14.04.2010 | ||
DK | 14.04.2010 | ||
EE | 14.04.2010 | ||
FI | 14.04.2010 | ||
IT | 14.04.2010 | ||
LT | 14.04.2010 | ||
LV | 14.04.2010 | ||
MT | 14.04.2010 | ||
NL | 14.04.2010 | ||
PL | 14.04.2010 | ||
RO | 14.04.2010 | ||
SE | 14.04.2010 | ||
SI | 14.04.2010 | ||
SK | 14.04.2010 | ||
CY | 26.05.2010 | ||
GR | 15.07.2010 | ||
ES | 25.07.2010 | ||
IS | 14.08.2010 | ||
PT | 16.08.2010 | ||
IE | 20.11.2010 | ||
FR | 30.11.2010 | ||
MC | 30.11.2010 | ||
Former [2011/47] | AT | 14.04.2010 | |
BE | 14.04.2010 | ||
CZ | 14.04.2010 | ||
DK | 14.04.2010 | ||
EE | 14.04.2010 | ||
FI | 14.04.2010 | ||
IT | 14.04.2010 | ||
LT | 14.04.2010 | ||
LV | 14.04.2010 | ||
NL | 14.04.2010 | ||
PL | 14.04.2010 | ||
RO | 14.04.2010 | ||
SE | 14.04.2010 | ||
SI | 14.04.2010 | ||
SK | 14.04.2010 | ||
CY | 26.05.2010 | ||
GR | 15.07.2010 | ||
ES | 25.07.2010 | ||
IS | 14.08.2010 | ||
PT | 16.08.2010 | ||
IE | 20.11.2010 | ||
FR | 30.11.2010 | ||
MC | 30.11.2010 | ||
Former [2011/33] | AT | 14.04.2010 | |
BE | 14.04.2010 | ||
CZ | 14.04.2010 | ||
DK | 14.04.2010 | ||
EE | 14.04.2010 | ||
FI | 14.04.2010 | ||
IT | 14.04.2010 | ||
LT | 14.04.2010 | ||
LV | 14.04.2010 | ||
NL | 14.04.2010 | ||
PL | 14.04.2010 | ||
RO | 14.04.2010 | ||
SE | 14.04.2010 | ||
SI | 14.04.2010 | ||
SK | 14.04.2010 | ||
CY | 26.05.2010 | ||
GR | 15.07.2010 | ||
ES | 25.07.2010 | ||
IS | 14.08.2010 | ||
PT | 16.08.2010 | ||
MC | 30.11.2010 | ||
Former [2011/19] | AT | 14.04.2010 | |
BE | 14.04.2010 | ||
CZ | 14.04.2010 | ||
DK | 14.04.2010 | ||
EE | 14.04.2010 | ||
FI | 14.04.2010 | ||
IT | 14.04.2010 | ||
LT | 14.04.2010 | ||
LV | 14.04.2010 | ||
NL | 14.04.2010 | ||
PL | 14.04.2010 | ||
RO | 14.04.2010 | ||
SE | 14.04.2010 | ||
SI | 14.04.2010 | ||
SK | 14.04.2010 | ||
CY | 26.05.2010 | ||
GR | 15.07.2010 | ||
ES | 25.07.2010 | ||
IS | 14.08.2010 | ||
PT | 16.08.2010 | ||
Former [2011/06] | AT | 14.04.2010 | |
FI | 14.04.2010 | ||
LT | 14.04.2010 | ||
LV | 14.04.2010 | ||
NL | 14.04.2010 | ||
PL | 14.04.2010 | ||
SE | 14.04.2010 | ||
SI | 14.04.2010 | ||
CY | 26.05.2010 | ||
GR | 15.07.2010 | ||
ES | 25.07.2010 | ||
IS | 14.08.2010 | ||
Former [2010/45] | NL | 14.04.2010 | Documents cited: | Search | [XA]GB2219120 (LAUREL BANK MACHINE CO [JP]) [X] 11-13 * page 7, line 9 - page 8, line 3 * * page 10, line 14 - page 11, line 3 * * page 12, line 16 - page 15, line 3 * * page 16, line 25 - page 17, line 1 * * page 39, line 13 - page 40, line 6 * * figures 1-5,15 * [A] 1; | [XA]EP0471300 (OKI ELECTRIC IND CO LTD [JP]) [X] 11-13 * column 1, line 27 - column 3, line 50 * * column 7, lines 16-40 * * column 7, line 55 - column 8, line 28 * * column 8, line 55 - column 9, line 1 * * column 10, line 15 - column 12, line 42 * * figures 2,7-9 * [A] 1,7-10; | [A]EP1363251 (HITACHI LTD [JP]) [A] 1,11,12 * paragraphs [0023] , [0024] * * paragraphs [0034] - [0036] ** figures 3,14-17 * | by applicant | JPH09208134 | JPH10181928 | JP2000331214 |