EP1855503 - Method for performing handoff by sequentially using up- and downlink signal quality [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.03.2014 Database last updated on 06.11.2024 | Most recent event Tooltip | 17.07.2015 | Lapse of the patent in a contracting state New state(s): LU | published on 19.08.2015 [2015/34] | Applicant(s) | For all designated states QUALCOMM Incorporated 5775 Morehouse Drive, R-132D San Diego, CA 92121-1714 / US | [2007/46] | Inventor(s) | 01 /
BLACK, Peter, J.@Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2013/18] |
Former [2008/14] | 01 /
BLACK, Peter, J. Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | ||
Former [2007/46] | 01 /
BLACK, Peter, J. 2961 First Avenue San Diego, CA 92131 / US | Representative(s) | O'Neill, Aoife, et al Tomkins & Co. 5 Dartmouth Road Dublin 6 / IE | [2013/03] |
Former [2007/46] | Lucey, Michael, et al Tomkins & Co 5 Dartmouth Road IRL-Dublin 6 / IE | Application number, filing date | 07115321.7 | 06.11.2000 | [2007/46] | Priority number, date | US19990434314 | 04.11.1999 Original published format: US 434314 | [2007/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP1855503 | Date: | 14.11.2007 | Language: | EN | [2007/46] | Type: | B1 Patent specification | No.: | EP1855503 | Date: | 01.05.2013 | Language: | EN | [2013/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.10.2007 | Classification | IPC: | H04W36/30, // H04W36/18 | [2012/49] | CPC: |
H04W36/304 (EP,KR,US);
H04B7/26 (KR);
H04W36/18 (EP,KR,US);
H04W52/40 (EP,US)
|
Former IPC [2007/46] | H04Q7/38 | Designated contracting states | AT, BE, CH, CY, DE, DK, ES, FI, FR, GB, GR, IE, IT, LI, LU, MC, NL, PT, SE, TR [2007/46] | Title | German: | Methode zum Weiterreichen bei sequentieller Verwendung der Signalqualität von Vor- und Rückwärtskanal | [2012/49] | English: | Method for performing handoff by sequentially using up- and downlink signal quality | [2007/46] | French: | Procédé pour le transfert en utilisant séquentiellement la qualité du signal de liaison montante et déscendante | [2007/46] |
Former [2007/46] | Methode zum weiterreichen bei Sequentieller Verwendung der Signalqualität von Vor- und Rückwärtskanal | Examination procedure | 30.08.2007 | Examination requested [2007/46] | 14.02.2008 | Despatch of a communication from the examining division (Time limit: M06) | 14.08.2008 | Reply to a communication from the examining division | 07.05.2010 | Despatch of a communication from the examining division (Time limit: M04) | 25.08.2010 | Reply to a communication from the examining division | 28.11.2012 | Communication of intention to grant the patent | 21.03.2013 | Fee for grant paid | 21.03.2013 | Fee for publishing/printing paid | Parent application(s) Tooltip | EP00975597.6 / EP1226722 | Divisional application(s) | EP10174223.7 / EP2257105 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20000975597) is 25.02.2004 | Opposition(s) | 04.02.2014 | No opposition filed within time limit [2014/15] | Fees paid | Renewal fee | 30.08.2007 | Renewal fee patent year 03 | 30.08.2007 | Renewal fee patent year 04 | 30.08.2007 | Renewal fee patent year 05 | 30.08.2007 | Renewal fee patent year 06 | 30.08.2007 | Renewal fee patent year 07 | 30.08.2007 | Renewal fee patent year 08 | 27.03.2008 | Renewal fee patent year 09 | 06.11.2009 | Renewal fee patent year 10 | 22.10.2010 | Renewal fee patent year 11 | 07.11.2011 | Renewal fee patent year 12 | 07.11.2012 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.05.2013 | BE | 01.05.2013 | CY | 01.05.2013 | DK | 01.05.2013 | FI | 01.05.2013 | IT | 01.05.2013 | MC | 01.05.2013 | NL | 01.05.2013 | SE | 01.05.2013 | TR | 01.05.2013 | GR | 02.08.2013 | ES | 12.08.2013 | PT | 02.09.2013 | IE | 06.11.2013 | LU | 06.11.2013 | CH | 30.11.2013 | LI | 30.11.2013 | FR | 02.12.2013 | [2015/34] |
Former [2015/32] | AT | 01.05.2013 | |
BE | 01.05.2013 | ||
CY | 01.05.2013 | ||
DK | 01.05.2013 | ||
FI | 01.05.2013 | ||
IT | 01.05.2013 | ||
MC | 01.05.2013 | ||
NL | 01.05.2013 | ||
SE | 01.05.2013 | ||
TR | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
IE | 06.11.2013 | ||
CH | 30.11.2013 | ||
LI | 30.11.2013 | ||
FR | 02.12.2013 | ||
Former [2014/51] | AT | 01.05.2013 | |
BE | 01.05.2013 | ||
CY | 01.05.2013 | ||
DK | 01.05.2013 | ||
FI | 01.05.2013 | ||
IT | 01.05.2013 | ||
MC | 01.05.2013 | ||
NL | 01.05.2013 | ||
SE | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
IE | 06.11.2013 | ||
CH | 30.11.2013 | ||
LI | 30.11.2013 | ||
FR | 02.12.2013 | ||
Former [2014/48] | AT | 01.05.2013 | |
BE | 01.05.2013 | ||
CY | 01.05.2013 | ||
DK | 01.05.2013 | ||
FI | 01.05.2013 | ||
IT | 01.05.2013 | ||
MC | 01.05.2013 | ||
NL | 01.05.2013 | ||
SE | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
IE | 06.11.2013 | ||
CH | 30.11.2013 | ||
LI | 30.11.2013 | ||
Former [2014/34] | AT | 01.05.2013 | |
BE | 01.05.2013 | ||
CY | 01.05.2013 | ||
DK | 01.05.2013 | ||
FI | 01.05.2013 | ||
IT | 01.05.2013 | ||
MC | 01.05.2013 | ||
NL | 01.05.2013 | ||
SE | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
CH | 30.11.2013 | ||
LI | 30.11.2013 | ||
Former [2014/33] | AT | 01.05.2013 | |
BE | 01.05.2013 | ||
CY | 01.05.2013 | ||
DK | 01.05.2013 | ||
FI | 01.05.2013 | ||
IT | 01.05.2013 | ||
MC | 01.05.2013 | ||
NL | 01.05.2013 | ||
SE | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
Former [2014/14] | AT | 01.05.2013 | |
BE | 01.05.2013 | ||
CY | 01.05.2013 | ||
DK | 01.05.2013 | ||
FI | 01.05.2013 | ||
IT | 01.05.2013 | ||
NL | 01.05.2013 | ||
SE | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
Former [2014/11] | AT | 01.05.2013 | |
BE | 01.05.2013 | ||
CY | 01.05.2013 | ||
DK | 01.05.2013 | ||
FI | 01.05.2013 | ||
IT | 01.05.2013 | ||
SE | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
Former [2014/09] | AT | 01.05.2013 | |
BE | 01.05.2013 | ||
CY | 01.05.2013 | ||
DK | 01.05.2013 | ||
FI | 01.05.2013 | ||
SE | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
Former [2014/06] | AT | 01.05.2013 | |
BE | 01.05.2013 | ||
CY | 01.05.2013 | ||
FI | 01.05.2013 | ||
SE | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
Former [2013/52] | AT | 01.05.2013 | |
CY | 01.05.2013 | ||
FI | 01.05.2013 | ||
SE | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
Former [2013/49] | AT | 01.05.2013 | |
FI | 01.05.2013 | ||
SE | 01.05.2013 | ||
GR | 02.08.2013 | ||
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
Former [2013/48] | AT | 01.05.2013 | |
ES | 12.08.2013 | ||
PT | 02.09.2013 | ||
Former [2013/47] | PT | 02.09.2013 | Documents cited: | Search | [XY]WO9319537 (ERICSSON TELEFON AB L M [SE]); | [XY]US5345467 (LOMP GARY R [US], et al); | [Y]EP0671819 (ROKE MANOR RESEARCH [GB]); | [Y]WO9943177 (NOKIA TELECOMMUNICATIONS OY [FI], et al); | [PX]WO0001185 (NOKIA NETWORKS OY [FI], et al); | [PX]EP1032237 (MOTOROLA LTD [GB]); | [E]WO0101720 (ERICSSON TELEFON AB L M [SE]) | by applicant | US4901307 | US5103459 | US5267261 | US5345467 | US5933787 | US5933462 | US6574211 |