blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1985919

EP1985919 - Surface-blasted steam generator parts or power plant components [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.12.2014
Database last updated on 07.10.2024
Most recent event   Tooltip15.07.2016Lapse of the patent in a contracting state
New state(s): MT
published on 17.08.2016  [2016/33]
Applicant(s)For all designated states
Mitsubishi Hitachi Power Systems Europe GmbH
Schifferstrasse 80
47059 Duisburg / DE
[2014/25]
Former [2008/44]For all designated states
Hitachi Power Europe GmbH
Schifferstrasse 80
47059 Duisburg / DE
Inventor(s)01 / Becker, Martin
Tempelhofer Str. 96
51375, Leverkusen / DE
02 / Klauke, Friedrich
Am Kleinen Rahm 74
40878, Ratingen / DE
 [2014/08]
Former [2008/44]01 / Becker, Martin
Tempelhofer Str. 96
51375, Leverkusen / DE
02 / Klauke, Friedrich
Am Kleinen Rahm 74
40878, Ratingen / DE
Representative(s)Viering, Jentschura & Partner mbB Patent- und Rechtsanwälte
Hamborner Straße 53
40472 Düsseldorf / DE
[N/P]
Former [2014/08]Viering, Jentschura & Partner
Kennedydamm 55 / Roßstrasse
40476 Düsseldorf / DE
Former [2008/44]Viering, Jentschura & Partner
Kennedydamm 55/Roßstr.
40476 Düsseldorf / DE
Application number, filing date07150101.919.12.2007
[2008/44]
Priority number, dateDE2006106234822.12.2006         Original published format: DE102006062348
[2008/44]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP1985919
Date:29.10.2008
Language:DE
[2008/44]
Type: A3 Search report 
No.:EP1985919
Date:23.12.2009
[2009/52]
Type: B1 Patent specification 
No.:EP1985919
Date:19.02.2014
Language:DE
[2014/08]
Search report(s)(Supplementary) European search report - dispatched on:EP25.11.2009
ClassificationIPC:B24C1/10, C21D6/00, C21D9/08, C21D7/06, F22B37/04
[2013/27]
CPC:
B24C1/10 (EP,US); C21D6/002 (EP,US); C21D7/06 (EP,US);
C21D9/08 (EP,US); F22B37/04 (EP,US); C21D2211/001 (EP,US);
C21D2211/005 (EP,US); C21D2211/008 (EP,US); Y10T428/12993 (EP,US) (-)
Former IPC [2008/44]F22B37/04, C21D7/06
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2008/44]
TitleGerman:Oberflächengestrahlte Dampferzeugerbauteile oder Kraftwerkskomponenten[2008/44]
English:Surface-blasted steam generator parts or power plant components[2008/44]
French:Composants grenaillés d'une chaudière ou d'une centrale électrique[2008/44]
Examination procedure16.06.2010Amendment by applicant (claims and/or description)
16.06.2010Examination requested  [2010/30]
29.10.2012Despatch of a communication from the examining division (Time limit: M04)
28.02.2013Reply to a communication from the examining division
09.09.2013Communication of intention to grant the patent
31.12.2013Fee for grant paid
31.12.2013Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  29.10.2012
Opposition(s)20.11.2014No opposition filed within time limit [2015/05]
Fees paidRenewal fee
31.12.2009Renewal fee patent year 03
31.12.2010Renewal fee patent year 04
02.01.2012Renewal fee patent year 05
31.12.2012Renewal fee patent year 06
30.12.2013Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY19.02.2014
EE19.02.2014
FI19.02.2014
LT19.02.2014
LV19.02.2014
MC19.02.2014
MT19.02.2014
RO19.02.2014
SE19.02.2014
IS19.06.2014
PT19.06.2014
[2016/33]
Former [2016/27]CY19.02.2014
EE19.02.2014
FI19.02.2014
LT19.02.2014
LV19.02.2014
MC19.02.2014
RO19.02.2014
SE19.02.2014
IS19.06.2014
PT19.06.2014
Former [2015/36]CY19.02.2014
EE19.02.2014
FI19.02.2014
LT19.02.2014
LV19.02.2014
RO19.02.2014
SE19.02.2014
IS19.06.2014
PT19.06.2014
Former [2014/48]CY19.02.2014
EE19.02.2014
FI19.02.2014
LT19.02.2014
LV19.02.2014
SE19.02.2014
IS19.06.2014
PT19.06.2014
Former [2014/41]CY19.02.2014
FI19.02.2014
LT19.02.2014
LV19.02.2014
SE19.02.2014
IS19.06.2014
PT19.06.2014
Former [2014/37]CY19.02.2014
FI19.02.2014
LT19.02.2014
SE19.02.2014
IS19.06.2014
PT19.06.2014
Former [2014/36]LT19.02.2014
IS19.06.2014
Documents cited:Search[XY]EP1637785  (SUMITOMO METAL IND [JP]) [X] 1,2,4-17 * abstract * * paragraphs [0009] - [0038] * [Y] 1,2,5-8,13-15;
 [X]FR2318229  (NIPPON KOKAN KK [JP]) [X] 1,2,4,5,7,8,12-15 * page 1, line 1 - page 7, line 11 *;
 [E]EP2060641  (NKKTUBES [JP]) [E] 1,3-5,7-9,11-13,15,17 * abstract * * paragraphs [0002] - [0035] *;
 [Y]US3648498  (VOSS RICHARD F, et al) [Y] 2,14 * page 3, line 4 - line 22 *;
 [Y]EP0937782  (SUMITOMO METAL IND [JP]) [Y] 1,2,5-8,13-15 * the whole document *;
 [A]WO03046242  (INTEGRAN TECHNOLOGIES INC [CA]) [A] * the whole document *
 [A]  - QIURONG CHEN ET AL, "NEW BOILER AND PIPING MATERIALS DESIGN CONSIDERATION FOR ADVANCED CYCLE CONDITIONS//AUSLEGUNGSKRITERIEN NEUER KESSELUND ROHRIETUNGSWERKSTOFFE FUER FORTGESCHRITTENE DAMPFPARAMETER", VGB POWERTECH, VGB POWERTECH, ESSEN, DE, (20030101), vol. 83, no. 11, ISSN 1435-3199, pages 91 - 98, XP001185009 [A] * the whole document *
 [A]  - HUSEMANN R U ET AL, VERARBEITUNG UND BETRIEBSEINSATZ VON NEUEN WERKSTOFFEN IM KRAFTWERKSBAU, VGB KRAFTWERKSTECHNIK, VGB KRAFTWERKSTECHNIK GMBH. ESSEN, DE, PAGE(S) 265 - 279, (19950301), ISSN 0372-5715, XP000498095 [A] * the whole document *
ExaminationJP2005298878
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.