blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1868396

EP1868396 - Method, system and device for allocating channel resources in a trunking service [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.06.2010
Database last updated on 03.01.2025
Most recent event   Tooltip19.10.2012Lapse of the patent in a contracting state
New state(s): TR
published on 21.11.2012  [2012/47]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[N/P]
Former [2007/51]For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building Bantian Longgang District, Shenzhen
Guangdong 518129 / CN
Inventor(s)01 / Bao, Guoqing
Huawei Adm. Bldg., Bantian Longgang District
Shenshen 518129, Guangdong / CN
 [2007/51]
Representative(s)Mounteney, Simon James
Marks & Clerk LLP
15 Fetter Lane
London EC4A 1BW / GB
[N/P]
Former [2007/51]Mounteney, Simon James
Marks & Clerk 90 Long Acre
London WC2E 9RA / GB
Application number, filing date07252431.714.06.2007
[2007/51]
Priority number, dateCN2006108716015.06.2006         Original published format: CN200610087160
[2007/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1868396
Date:19.12.2007
Language:EN
[2007/51]
Type: B1 Patent specification 
No.:EP1868396
Date:29.07.2009
Language:EN
[2009/31]
Search report(s)(Supplementary) European search report - dispatched on:EP16.10.2007
ClassificationIPC:H04W28/16
[2009/10]
CPC:
H04W28/16 (EP); H04W4/06 (EP); H04W92/14 (EP)
Former IPC [2007/51]H04Q7/30
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2007/51]
TitleGerman:Verfahren, System und Vorrichtung für die Zuweisung von Kanalressourcen in einem Bündelfunkdienst[2007/51]
English:Method, system and device for allocating channel resources in a trunking service[2007/51]
French:Procédé, système et dispositif d'attribution de ressources de canaux dans un service de circuit[2007/51]
Examination procedure20.06.2007Examination requested  [2007/51]
12.02.2008Amendment by applicant (claims and/or description)
18.04.2008Despatch of a communication from the examining division (Time limit: M04)
30.05.2008Reply to a communication from the examining division
18.08.2008Despatch of a communication from the examining division (Time limit: M04)
04.11.2008Reply to a communication from the examining division
10.02.2009Communication of intention to grant the patent
18.05.2009Fee for grant paid
18.05.2009Fee for publishing/printing paid
Opposition(s)03.05.2010No opposition filed within time limit [2010/27]
Fees paidRenewal fee
16.06.2009Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT29.07.2009
BE29.07.2009
CY29.07.2009
CZ29.07.2009
DK29.07.2009
EE29.07.2009
FI29.07.2009
IT29.07.2009
LT29.07.2009
LV29.07.2009
MT29.07.2009
NL29.07.2009
PL29.07.2009
RO29.07.2009
SE29.07.2009
SI29.07.2009
SK29.07.2009
TR29.07.2009
BG29.10.2009
GR30.10.2009
ES09.11.2009
IS29.11.2009
PT29.11.2009
HU30.01.2010
[2012/47]
Former [2012/42]AT29.07.2009
BE29.07.2009
CY29.07.2009
CZ29.07.2009
DK29.07.2009
EE29.07.2009
FI29.07.2009
IT29.07.2009
LT29.07.2009
LV29.07.2009
MT29.07.2009
NL29.07.2009
PL29.07.2009
RO29.07.2009
SE29.07.2009
SI29.07.2009
SK29.07.2009
BG29.10.2009
GR30.10.2009
ES09.11.2009
IS29.11.2009
PT29.11.2009
HU30.01.2010
Former [2012/37]AT29.07.2009
BE29.07.2009
CY29.07.2009
CZ29.07.2009
DK29.07.2009
EE29.07.2009
FI29.07.2009
IT29.07.2009
LT29.07.2009
LV29.07.2009
MT29.07.2009
NL29.07.2009
PL29.07.2009
RO29.07.2009
SE29.07.2009
SI29.07.2009
SK29.07.2009
BG29.10.2009
GR30.10.2009
ES09.11.2009
IS29.11.2009
PT29.11.2009
Former [2011/22]AT29.07.2009
BE29.07.2009
CZ29.07.2009
DK29.07.2009
EE29.07.2009
FI29.07.2009
IT29.07.2009
LT29.07.2009
LV29.07.2009
MT29.07.2009
NL29.07.2009
PL29.07.2009
RO29.07.2009
SE29.07.2009
SI29.07.2009
SK29.07.2009
BG29.10.2009
GR30.10.2009
ES09.11.2009
IS29.11.2009
PT29.11.2009
Former [2011/20]AT29.07.2009
BE29.07.2009
CZ29.07.2009
DK29.07.2009
EE29.07.2009
FI29.07.2009
IT29.07.2009
LT29.07.2009
LV29.07.2009
NL29.07.2009
PL29.07.2009
RO29.07.2009
SE29.07.2009
SI29.07.2009
SK29.07.2009
BG29.10.2009
GR30.10.2009
ES09.11.2009
IS29.11.2009
PT29.11.2009
Former [2010/27]AT29.07.2009
BE29.07.2009
CZ29.07.2009
DK29.07.2009
EE29.07.2009
FI29.07.2009
LT29.07.2009
LV29.07.2009
NL29.07.2009
PL29.07.2009
RO29.07.2009
SE29.07.2009
SI29.07.2009
SK29.07.2009
BG29.10.2009
ES09.11.2009
IS29.11.2009
PT29.11.2009
Former [2010/20]AT29.07.2009
DK29.07.2009
EE29.07.2009
FI29.07.2009
LT29.07.2009
LV29.07.2009
NL29.07.2009
PL29.07.2009
SE29.07.2009
SI29.07.2009
BG29.10.2009
ES09.11.2009
IS29.11.2009
PT29.11.2009
Former [2010/17]AT29.07.2009
FI29.07.2009
LT29.07.2009
LV29.07.2009
NL29.07.2009
PL29.07.2009
SE29.07.2009
SI29.07.2009
BG29.10.2009
ES09.11.2009
IS29.11.2009
PT29.11.2009
Documents cited:Search[A]EP0923255  (SIEMENS AG [DE]) [A] 1-22* paragraphs [0003] , [0015] *;
 [A]US2005141450  (CARLTON ALAN G [US], et al) [A] 1-22 * abstract * * paragraphs [0003] , [0004] , [0007] , [0027]; figure 8 *;
 [A]US2006007861  (KURZMANN BERND [AT], et al) [A] 1-22 * abstract * * paragraphs [0022] , [0024] *;
 [X]  - "3rd Generation Partnership Project; Technical Specification Group GSM/EDGE Radio Access Network; Mobile Switching Center - Base Station System (MSC-BSS) Interface; Layer 3 Specification (Release 7)", 3GPP TS 48.008 V7.5.0 (2006-05) TECHNICAL SPECIFICATION, (20060512), pages 1 - 172, URL: http://www.3gpp.org/ftp/Specs/html-info/48008.htm, (20070927), XP002453360 [X] 1,2,9-12,16,17,20,21 * Sections 3.1.21, 3.1.21.1; page 52, line 15 - page 52, line 42 * * Sections 3.1.22, 3.1.22.1; page 53, line 10 - page 54, line 44 * * Section 3.2.1.53; page 88, line 1 - page 88, line 26 * * Section 3.2.2.52; page 139, line 28 - line 40 * * Section 3.2.1.79; page 95, line 23 - page 95, line 33 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.