EP1914672 - Method and apparatus for manufacturing an auxiliary antenna [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.12.2018 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 05.01.2018 | ||
Former | Grant of patent is intended Status updated on 18.09.2017 | Most recent event Tooltip | 19.06.2020 | Lapse of the patent in a contracting state New state(s): HU | published on 22.07.2020 [2020/30] | Applicant(s) | For all designated states INVENGO TECHNOLOGIES SARL 180 Voie Ariane ZI Athélia I 13600 La Ciotat / FR | [2017/45] |
Former [2008/17] | For all designated states Tagsys SA 180, chemin de Saint-Lambert 13821 La Penne-sur-Huveaune / FR | Inventor(s) | 01 /
Martin, Philippe 23 rue de la Doloire 21200 Beaune / FR | 02 /
Lecire, Philippe 224 Avenue des Cypres 13340 Rognac / FR | [2008/17] | Representative(s) | Swindell & Pearson Limited 48 Friar Gate Derby DE1 1GY / GB | [2018/06] |
Former [2008/17] | Parnham, Kevin Swindell & Pearson 48 Friar Gate Derby DE1 1GY / GB | Application number, filing date | 07254002.4 | 09.10.2007 | [2008/17] | Priority number, date | US20060852352P | 17.10.2006 Original published format: US 852352 P | [2008/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP1914672 | Date: | 23.04.2008 | Language: | EN | [2008/17] | Type: | A3 Search report | No.: | EP1914672 | Date: | 07.05.2008 | [2008/19] | Type: | B1 Patent specification | No.: | EP1914672 | Date: | 07.02.2018 | Language: | EN | [2018/06] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.04.2008 | Classification | IPC: | G06K19/077 | [2008/17] | CPC: |
G06K19/07749 (EP,US);
Y10T156/1075 (EP,US);
Y10T29/49016 (EP,US);
Y10T29/49117 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2018/06] |
Former [2008/17] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | Verfahren und Vorrichtung zur Herstellung einer Hilfsantenne | [2008/17] | English: | Method and apparatus for manufacturing an auxiliary antenna | [2008/17] | French: | Procédé et appareil pour la fabrication d'une antenne auxiliaire | [2008/17] | Examination procedure | 03.11.2008 | Examination requested [2008/51] | 09.12.2008 | Despatch of a communication from the examining division (Time limit: M06) | 16.06.2009 | Reply to a communication from the examining division | 19.09.2017 | Communication of intention to grant the patent | 19.12.2017 | Fee for grant paid | 19.12.2017 | Fee for publishing/printing paid | 19.12.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.12.2008 | Opposition(s) | 08.11.2018 | No opposition filed within time limit [2019/03] | Fees paid | Renewal fee | 06.10.2009 | Renewal fee patent year 03 | 11.10.2010 | Renewal fee patent year 04 | 11.10.2011 | Renewal fee patent year 05 | 16.10.2012 | Renewal fee patent year 06 | 22.10.2013 | Renewal fee patent year 07 | 28.04.2015 | Renewal fee patent year 08 | 29.04.2016 | Renewal fee patent year 09 | 28.10.2016 | Renewal fee patent year 10 | 26.10.2017 | Renewal fee patent year 11 | Penalty fee | Additional fee for renewal fee | 31.10.2014 | 08   M06   Fee paid on   28.04.2015 | 31.10.2015 | 09   M06   Fee paid on   29.04.2016 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.10.2007 | AT | 07.02.2018 | CY | 07.02.2018 | CZ | 07.02.2018 | DK | 07.02.2018 | EE | 07.02.2018 | ES | 07.02.2018 | FI | 07.02.2018 | IT | 07.02.2018 | LT | 07.02.2018 | LV | 07.02.2018 | MC | 07.02.2018 | NL | 07.02.2018 | PL | 07.02.2018 | PT | 07.02.2018 | RO | 07.02.2018 | SE | 07.02.2018 | SI | 07.02.2018 | SK | 07.02.2018 | TR | 07.02.2018 | BG | 07.05.2018 | GR | 08.05.2018 | IS | 07.06.2018 | IE | 09.10.2018 | LU | 09.10.2018 | MT | 09.10.2018 | BE | 31.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | [2020/30] |
Former [2020/27] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
PT | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
TR | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
IE | 09.10.2018 | ||
LU | 09.10.2018 | ||
MT | 09.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2020/16] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
TR | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
IE | 09.10.2018 | ||
LU | 09.10.2018 | ||
MT | 09.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2020/08] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
IE | 09.10.2018 | ||
LU | 09.10.2018 | ||
MT | 09.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/48] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
IE | 09.10.2018 | ||
LU | 09.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/39] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
LU | 09.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/38] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
LU | 09.10.2018 | ||
BE | 31.10.2018 | ||
Former [2019/30] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
LU | 09.10.2018 | ||
Former [2019/28] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2019/13] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/51] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/50] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
RO | 07.02.2018 | ||
SE | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/47] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/40] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/39] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
LV | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/38] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/37] | CY | 07.02.2018 | |
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
GR | 08.05.2018 | ||
Former [2018/36] | CY | 07.02.2018 | |
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
Former [2018/35] | CY | 07.02.2018 | |
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | Documents cited: | Search | [X]US2003051806 (APPALUCCI LAWRENCE [US], et al) [X] 1-26 * paragraph [0008] * * paragraph [0021] - paragraph [0024] * * claim 1 *; | [X]US2004025324 (UCHIBORI SHINYA [JP], et al) [X] 1,14 * paragraph [0014] * * paragraph [0026] * * paragraph [0048] ** claim 1 * | by applicant | US2003051806 |