EP1818149 - Method of manufacturing a concrete beam, moulding tool and corresponding concrete beam [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 27.01.2012 Database last updated on 02.11.2024 | Most recent event Tooltip | 27.01.2012 | Application deemed to be withdrawn | published on 29.02.2012 [2012/09] | Applicant(s) | For all designated states Conseil Service Investissement 1 et 1 bis rue Marcel Paul 91300 Massy / FR | [2007/33] | Inventor(s) | 01 /
Brugeaud, Yves 5 rue Lecherbonnier 19100 Brive / FR | 02 /
Pestrin, Daniel 11 rue Edison 19100 Brive / FR | [2007/33] | Representative(s) | Lavialle, Bruno François Stéphane, et al Cabinet Boettcher 5 rue de Vienne 75008 Paris / FR | [N/P] |
Former [2007/33] | Lavialle, Bruno François Stéphane, et al Cabinet Boettcher 22 rue du Général Foy 75008 Paris / FR | Application number, filing date | 07290130.9 | 01.02.2007 | [2007/33] | Priority number, date | FR20060001196 | 10.02.2006 Original published format: FR 0601196 | [2007/33] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP1818149 | Date: | 15.08.2007 | Language: | FR | [2007/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.05.2007 | Classification | IPC: | B28B7/00 | [2007/33] | CPC: |
E04C3/26 (EP);
B28B7/0041 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2007/33] | Title | German: | Verfahren zur Herstellung eines Betonträgerformwerkzeugs und entsprechender Betonträger | [2007/33] | English: | Method of manufacturing a concrete beam, moulding tool and corresponding concrete beam | [2007/33] | French: | Procédé de realisation d'une poutre en béton outillage de moulage et poutre en béton correspondante | [2007/33] | Examination procedure | 22.01.2008 | Examination requested [2008/10] | 25.03.2008 | Despatch of a communication from the examining division (Time limit: M04) | 30.07.2008 | Reply to a communication from the examining division | 04.05.2011 | Despatch of a communication from the examining division (Time limit: M04) | 01.09.2011 | Application deemed to be withdrawn, date of legal effect [2012/09] | 10.10.2011 | Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time [2012/09] | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 25.03.2008 | Fees paid | Renewal fee | 23.02.2009 | Renewal fee patent year 03 | 24.02.2010 | Renewal fee patent year 04 | Penalty fee | Additional fee for renewal fee | 28.02.2011 | 05   M06   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [X]US4156517 (RAMPF KARL [DE], et al) [X] 1-3,7,17,19,20 * sentence 51 - sentence 60 *; | [A]NL7306389 (SPAN-DECK INC [US]) [A] 1 * figures 1,5; claim 1 *; | [A]DE1101477 (GRUEN & BILFINGER AG) [A] 1 * figure 4; claims 1,6 *; | [A]GB1202320 (SCHRECK PHILIPP [DE]) [A] 1 * figures 1,3; claim 1 * | by applicant | US4156517 |