blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1991824

EP1991824 - METHOD FOR FORMING A SURFACE LAYER ON A SUBSTRATE [Right-click to bookmark this link]
Former [2008/47]POROUS LAYER
[2019/02]
StatusNo opposition filed within time limit
Status updated on  11.09.2020
Database last updated on 25.09.2024
FormerThe patent has been granted
Status updated on  04.10.2019
FormerGrant of patent is intended
Status updated on  18.12.2018
FormerExamination is in progress
Status updated on  02.11.2016
Most recent event   Tooltip24.06.2022Lapse of the patent in a contracting state
New state(s): CY, HU, MT
published on 27.07.2022  [2022/30]
Applicant(s)For all designated states
Danfoss A/S
Nordborgvej 81
6430 Nordborg / DK
[2020/09]
Former [2019/45]For all designated states
Micro Delta T AB
Garnviksägen 12
184 42 Akersberga / SE
Former [2011/24]For all designated states
Micro Delta T AB
Garnviksägen 12
184 42 Akersberga / SE
Former [2008/47]For all designated states
Furberg, Richard
Virebergsvägen
169 31 Solna / SE
For all designated states
Palm, Björn
Tomtebergavägen 10
141 43 Huddinge / SE
For all designated states
Li, Shanghua
Armégatan 32/0015
17171 Solna / SE
For all designated states
Muhammed, Mamoun
Eketorpsvägen 25
182 61 Djursholm / SE
For all designated states
Toprak, Muhammet
7170 Davenport Road Apt. 108
Goleta CA 93117 / US
Inventor(s)01 / FURBERG, Richard
Garnviksvägen 12
184 42 Åkersberga / SE
02 / PALM, Björn
Tomtebergavägen 10
141 43 Huddinge / SE
03 / LI, Shanghua
Murtegelvägen 11A
723 48 Västeras / SE
04 / MUHAMMED, Mamoun
Eketorpsvägen 25
182 61 Djursholm / SE
05 / TOPRAK, Muhammet
Kastrupgatan 6, 3 tr
164 41 Kista / SE
 [2017/39]
Former [2017/24]01 / FURBERG, Richard
Garnviksvägen 12
184 42 Åkersberga / SE
02 / PALM, Björn
Tomtebergavägen 10
141 43 Huddinge / SE
03 / LI, Shanghua
Fridensborgsvägen 27
170 69 Solna / SE
04 / MUHAMMED, Mamoun
Eketorpsvägen 25
182 61 Djursholm / SE
05 / TOPRAK, Muhammet
Kastrupgatan 6, 3 tr
164 41 Kista / SE
Former [2008/47]01 / see applicant
...
Representative(s)Brann AB
P.O. Box 3690
Sveavägen 63
103 59 Stockholm / SE
[N/P]
Former [2019/45]Brann AB
P.O. Box 3690
Drottninggatan 27
103 59 Stockholm / SE
Former [2013/46]Brann AB
P.O. Box 12246
102 26 Stockholm / SE
Former [2008/47]Franks, Barry Gerard
BRANN AB Uppsala Office Box 171 92
104 62 Stockholm / SE
Application number, filing date07709401.902.03.2007
[2008/47]
WO2007SE00208
Priority number, dateSE2006000047503.03.2006         Original published format: SE 0600475
[2008/47]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2007100297
Date:07.09.2007
Language:EN
[2007/36]
Type: A1 Application with search report 
No.:EP1991824
Date:19.11.2008
Language:EN
The application published by WIPO in one of the EPO official languages on 07.09.2007 takes the place of the publication of the European patent application.
[2008/47]
Type: B1 Patent specification 
No.:EP1991824
Date:06.11.2019
Language:EN
[2019/45]
Search report(s)International search report - published on:SE07.09.2007
(Supplementary) European search report - dispatched on:EP13.09.2013
ClassificationIPC:F28F13/18, C25D5/00, C25D5/48, C23C14/16, C23C16/06
[2008/47]
CPC:
F28F13/187 (EP,US); C25D5/003 (EP,US); C25D5/50 (EP,US);
C25D5/605 (EP,US); C25D5/617 (EP,US); C25D5/623 (EP,US);
C25D7/00 (EP,US); F28F2255/20 (EP,US); Y10T428/12479 (EP,US);
Y10T428/26 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2019/45]
Former [2008/47]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINER OBERFLÄCHENSCHICHT AUF EINEM SUBSTRAT[2019/02]
English:METHOD FOR FORMING A SURFACE LAYER ON A SUBSTRATE[2019/02]
French:PROCÉDÉ POUR REALISER UNE COUCHE SUPERFICIELLE SUR UN SUBSTRAT[2019/02]
Former [2008/47]PORÖSE SCHICHT
Former [2008/47]POROUS LAYER
Former [2008/47]COUCHE POREUSE
Entry into regional phase04.09.2008National basic fee paid 
04.09.2008Search fee paid 
04.09.2008Designation fee(s) paid 
04.09.2008Examination fee paid 
Examination procedure04.09.2008Examination requested  [2008/47]
01.04.2014Amendment by applicant (claims and/or description)
12.04.2016Despatch of a communication from the examining division (Time limit: M06)
14.10.2016Reply to a communication from the examining division
03.11.2016Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time
20.06.2017Despatch of a communication from the examining division (Time limit: M06)
19.12.2017Reply to a communication from the examining division
06.02.2018Despatch of a communication from the examining division (Time limit: M04)
05.06.2018Reply to a communication from the examining division
19.12.2018Communication of intention to grant the patent
12.04.2019Fee for grant paid
12.04.2019Fee for publishing/printing paid
12.04.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  12.04.2016
Opposition(s)07.08.2020No opposition filed within time limit [2020/42]
Fees paidRenewal fee
20.03.2009Renewal fee patent year 03
26.03.2010Renewal fee patent year 04
18.03.2011Renewal fee patent year 05
31.08.2012Renewal fee patent year 06
20.09.2013Renewal fee patent year 07
31.01.2014Renewal fee patent year 08
27.03.2015Renewal fee patent year 09
05.04.2017Renewal fee patent year 11
25.09.2018Renewal fee patent year 12
30.08.2019Renewal fee patent year 13
Penalty fee
Additional fee for renewal fee
31.03.201206   M06   Fee paid on   31.08.2012
31.03.201307   M06   Fee paid on   20.09.2013
31.03.201610   M06   Fee paid on   31.03.2016
31.03.201812   M06   Fee paid on   25.09.2018
31.03.201913   M06   Fee paid on   30.08.2019
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.03.2007
AT06.11.2019
CY06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
MT06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
TR06.11.2019
BG06.02.2020
GR07.02.2020
IE02.03.2020
LU02.03.2020
IS06.03.2020
PT06.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
[2022/27]
Former [2022/26]AT06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
TR06.11.2019
BG06.02.2020
GR07.02.2020
IE02.03.2020
LU02.03.2020
IS06.03.2020
PT06.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/12]AT06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
BG06.02.2020
GR07.02.2020
IE02.03.2020
LU02.03.2020
IS06.03.2020
PT06.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/08]AT06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
BG06.02.2020
GR07.02.2020
IE02.03.2020
LU02.03.2020
IS06.03.2020
PT06.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/04]AT06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
BG06.02.2020
GR07.02.2020
LU02.03.2020
IS06.03.2020
PT06.03.2020
Former [2020/50]AT06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/37]CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
SE06.11.2019
SK06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/36]CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
SE06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/35]CZ06.11.2019
ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
SE06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/24]ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
SE06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/23]ES06.11.2019
FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
SE06.11.2019
BG06.02.2020
GR07.02.2020
PT06.03.2020
Former [2020/22]FI06.11.2019
LT06.11.2019
SE06.11.2019
BG06.02.2020
PT06.03.2020
Documents cited:Search[Y]US3298936  (MICHAEL HAROLD J) [Y] 10-13 * abstract *;
 [Y]US4120994  (INOUE KIYOSHI) [Y] 1-5 * abstract * * column 1, lines 18-25 * * column 1, line 58 - column 2, line 33 * * column 3, line 20 - line 68 *;
 [A]EP0226861  (MITSUBISHI METAL CORP [JP]) [A] 1-15* the whole document *;
 [Y]US2004256236  (MINEVSKI ZORAN [US], et al) [Y] 7-9 * paragraphs [0019] , [0024] , [0038] - [0072]; figure - *;
 [YD]  - H.-C. SHIN ET AL, "Nanoporous Structures Prepared by an Electrochemical Deposition Process", ADVANCED MATERIALS, vol. 15, no. 19, doi:10.1002/adma.200305160, ISSN 0935-9648, (20031002), pages 1610 - 1614, (20130905), XP055077693 [YD] 1-15 * the whole document *

DOI:   http://dx.doi.org/10.1002/adma.200305160
 [Y]  - SHANGHUA LI L ET AL, "Nanostructured Surfaces for Boiling Enhancement.", NANOPOROUS AND NANOSTRUCTURED MATERIALS FOR CATALYSIS, SENSOR, AND GAS SEPARATION APPLICATIONS, (20050401), page 419, URL: http://www.mrs.org/s05-abstract-r/, (20130905), XP055077857 [Y] 1-15 * page 419 *
International search[A]US3884772  (SHIGA SHOJI);
 [X]US4258783  (ALBERTSON CLARENCE E, et al);
 [X]US4381818  (SACHAR KENNETH S, et al);
 [X]EP0224761  (MITSUBISHI METAL CORP [JP]);
 [X]WO0238827  (CHANG CHAK MAN THOMAS [AU], et al);
 [X]  - DONCHENKO M.I. ET AL., "Role of Surface-Active Additives at Obtaining of Highly-Porous Coatings", GAL'VANOTECHNIKA I OBRABOTKA POVERCHNOSTI, (1996), vol. 4, no. 3, pages 18 - 22, XP003013933
 [A]  - SCHULZ A., "Mikrostrukturierte Wärmetauscherrohre", KL LUFT- UND KOLTETECHNIK, (2004), vol. 40, no. 6, pages 218 - 221, XP003013934
ExaminationWO2005006395
by applicantUS3384154
 US3523577
 US3587730
 US4216826
 US4780373
 JP2002228389
    - SHIN et al., Adv. Mater., (20030000), vol. 15, pages 1610 - 1614
    - Chem. Mater., (20040000), vol. 16, pages 5460 - 5464
    - "Describing Uncertainties in Sin gle Sample Experiments", Mechanical Engineering, (19530000), vol. 75, pages 3 - 8
    - INCROPERA; DEWITT, Fundamentals of Heat and Mass Transfer, Wiley, pages 545 - 551
    - STOCKHOLM; SHIN et al., "Nanoporous Structures Prepared by an Electrochemical Deposition Process", Advanced Materials, vol. 15, no. 19, doi:doi:10.1002/adma.200305160, pages 1610 - 1614, XP055077693

DOI:   http://dx.doi.org/10.1002/adma.200305160
    - XIAO et al., "Tuning the Architecture of Mesostructures by Electrodeposition", J. Am. Chem. Soc., (20040000), vol. 126, doi:doi:10.1021/ja0315154, pages 2316 - 2317, XP055077704

DOI:   http://dx.doi.org/10.1021/ja0315154
    - "Heat Flow Rates in Saturated Nucleate Pool Boiling - A Wide Ranging Examination Using Reduced Properties", COOPER, Advances in Heat Transfer, Academic Press, pages 203 - 205
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.