EP2135471 - METHOD AND SYSTEM FOR INTRA E-UTRAN HANDOVER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.07.2012 Database last updated on 05.07.2024 | Most recent event Tooltip | 18.07.2014 | Lapse of the patent in a contracting state New state(s): HU | published on 20.08.2014 [2014/34] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [N/P] |
Former [2009/52] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
OLSSON, Lars-Bertil Fjällviolen 8, 3tr S-424 48 Angered / SE | 02 /
AHLEN, Anders Väderbodarna 4 S-718 35 Göteborg / SE | 03 /
GUSTAVSSON, Roland Granitvägen 10 S-471 60 Myggenäs / SE | 04 /
SUNDELL, Hans-Olof Box 17 S-475 21 Kalvsund / SE | [2009/52] | Representative(s) | Althoff, Fredrik Ericsson AB Patent Unit Antennas & Microwaves 417 56 Göteborg / SE | [2011/35] |
Former [2011/27] | Althoff, Fredrik Ericsson AB Patent Unit Antennas & Microwaves 417 56 Göteborg / SE | ||
Former [2009/52] | Ekwall, Peter Albihns AB P.O. Box 142 401 22 Göteborg / SE | Application number, filing date | 07709465.4 | 06.02.2007 | [2009/52] | WO2007SE50072 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008097147 | Date: | 14.08.2008 | Language: | EN | [2008/33] | Type: | A1 Application with search report | No.: | EP2135471 | Date: | 23.12.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.08.2008 takes the place of the publication of the European patent application. | [2009/52] | Type: | B1 Patent specification | No.: | EP2135471 | Date: | 31.08.2011 | Language: | EN | [2011/35] | Search report(s) | International search report - published on: | SE | 14.08.2008 | (Supplementary) European search report - dispatched on: | EP | 04.01.2010 | Classification | IPC: | H04W36/08 | [2010/04] | CPC: |
H04W36/02 (EP,US);
H04W92/20 (EP,US)
|
Former IPC [2010/01] | H04W4/00 | ||
Former IPC [2009/52] | H04Q7/38, H04Q7/22 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2009/52] | Title | German: | VERFAHREN UND SYSTEM FÜR INTRA-E-UTRAN-HANDOVER | [2009/52] | English: | METHOD AND SYSTEM FOR INTRA E-UTRAN HANDOVER | [2009/52] | French: | PROCÉDÉ ET SYSTÈME S'APPLIQUANT À UN TRANSFERT CELLULAIRE INTERNE E-UTRAN | [2009/52] | Entry into regional phase | 28.08.2009 | National basic fee paid | 11.11.2009 | Search fee paid | 28.08.2009 | Designation fee(s) paid | 28.08.2009 | Examination fee paid | Examination procedure | 04.12.2008 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 28.08.2009 | Examination requested [2009/52] | 22.10.2009 | Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time | 13.04.2010 | Despatch of a communication from the examining division (Time limit: M04) | 28.05.2010 | Reply to a communication from the examining division | 25.03.2011 | Communication of intention to grant the patent | 11.07.2011 | Fee for grant paid | 11.07.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.04.2010 | Opposition(s) | 01.06.2012 | No opposition filed within time limit [2012/32] | Request for further processing for: | The application is deemed to be withdrawn due to non-payment of the search fee | 11.11.2009 | Request for further processing filed | 11.11.2009 | Full payment received (date of receipt of payment) | Fees paid | Renewal fee | 28.08.2009 | Renewal fee patent year 03 | 24.02.2010 | Renewal fee patent year 04 | 23.02.2011 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.02.2007 | AT | 31.08.2011 | BE | 31.08.2011 | CY | 31.08.2011 | CZ | 31.08.2011 | DK | 31.08.2011 | EE | 31.08.2011 | FI | 31.08.2011 | IT | 31.08.2011 | LT | 31.08.2011 | LV | 31.08.2011 | NL | 31.08.2011 | PL | 31.08.2011 | RO | 31.08.2011 | SE | 31.08.2011 | SI | 31.08.2011 | SK | 31.08.2011 | TR | 31.08.2011 | BG | 30.11.2011 | GR | 01.12.2011 | ES | 11.12.2011 | IS | 31.12.2011 | PT | 02.01.2012 | IE | 06.02.2012 | LU | 06.02.2012 | CH | 29.02.2012 | LI | 29.02.2012 | MC | 29.02.2012 | [2014/34] |
Former [2014/27] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
DK | 31.08.2011 | ||
EE | 31.08.2011 | ||
FI | 31.08.2011 | ||
IT | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
PL | 31.08.2011 | ||
RO | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
SK | 31.08.2011 | ||
TR | 31.08.2011 | ||
BG | 30.11.2011 | ||
GR | 01.12.2011 | ||
ES | 11.12.2011 | ||
IS | 31.12.2011 | ||
PT | 02.01.2012 | ||
IE | 06.02.2012 | ||
LU | 06.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2014/21] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
DK | 31.08.2011 | ||
EE | 31.08.2011 | ||
FI | 31.08.2011 | ||
IT | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
PL | 31.08.2011 | ||
RO | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
SK | 31.08.2011 | ||
TR | 31.08.2011 | ||
BG | 30.11.2011 | ||
GR | 01.12.2011 | ||
ES | 11.12.2011 | ||
IS | 31.12.2011 | ||
PT | 02.01.2012 | ||
IE | 06.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2013/29] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
DK | 31.08.2011 | ||
EE | 31.08.2011 | ||
FI | 31.08.2011 | ||
IT | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
PL | 31.08.2011 | ||
RO | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
SK | 31.08.2011 | ||
BG | 30.11.2011 | ||
GR | 01.12.2011 | ||
ES | 11.12.2011 | ||
IS | 31.12.2011 | ||
PT | 02.01.2012 | ||
IE | 06.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2013/22] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
DK | 31.08.2011 | ||
EE | 31.08.2011 | ||
FI | 31.08.2011 | ||
IT | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
PL | 31.08.2011 | ||
RO | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
SK | 31.08.2011 | ||
GR | 01.12.2011 | ||
ES | 11.12.2011 | ||
IS | 31.12.2011 | ||
PT | 02.01.2012 | ||
IE | 06.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2013/08] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
DK | 31.08.2011 | ||
EE | 31.08.2011 | ||
FI | 31.08.2011 | ||
IT | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
PL | 31.08.2011 | ||
RO | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
SK | 31.08.2011 | ||
GR | 01.12.2011 | ||
IS | 31.12.2011 | ||
PT | 02.01.2012 | ||
IE | 06.02.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2012/49] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
DK | 31.08.2011 | ||
EE | 31.08.2011 | ||
FI | 31.08.2011 | ||
IT | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
PL | 31.08.2011 | ||
RO | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
SK | 31.08.2011 | ||
GR | 01.12.2011 | ||
IS | 31.12.2011 | ||
PT | 02.01.2012 | ||
CH | 29.02.2012 | ||
LI | 29.02.2012 | ||
MC | 29.02.2012 | ||
Former [2012/42] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
DK | 31.08.2011 | ||
EE | 31.08.2011 | ||
FI | 31.08.2011 | ||
IT | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
PL | 31.08.2011 | ||
RO | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
SK | 31.08.2011 | ||
GR | 01.12.2011 | ||
IS | 31.12.2011 | ||
PT | 02.01.2012 | ||
MC | 29.02.2012 | ||
Former [2012/33] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
DK | 31.08.2011 | ||
EE | 31.08.2011 | ||
FI | 31.08.2011 | ||
IT | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
PL | 31.08.2011 | ||
RO | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
SK | 31.08.2011 | ||
GR | 01.12.2011 | ||
IS | 31.12.2011 | ||
PT | 02.01.2012 | ||
Former [2012/26] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
EE | 31.08.2011 | ||
FI | 31.08.2011 | ||
IT | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
PL | 31.08.2011 | ||
RO | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
SK | 31.08.2011 | ||
GR | 01.12.2011 | ||
IS | 31.12.2011 | ||
PT | 02.01.2012 | ||
Former [2012/23] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
EE | 31.08.2011 | ||
FI | 31.08.2011 | ||
IT | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
RO | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
SK | 31.08.2011 | ||
GR | 01.12.2011 | ||
IS | 31.12.2011 | ||
PT | 02.01.2012 | ||
Former [2012/21] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
CZ | 31.08.2011 | ||
FI | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
GR | 01.12.2011 | ||
IS | 31.12.2011 | ||
Former [2012/17] | AT | 31.08.2011 | |
BE | 31.08.2011 | ||
CY | 31.08.2011 | ||
FI | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
GR | 01.12.2011 | ||
IS | 31.12.2011 | ||
Former [2012/12] | AT | 31.08.2011 | |
CY | 31.08.2011 | ||
FI | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
GR | 01.12.2011 | ||
IS | 31.12.2011 | ||
Former [2012/11] | AT | 31.08.2011 | |
FI | 31.08.2011 | ||
LT | 31.08.2011 | ||
LV | 31.08.2011 | ||
NL | 31.08.2011 | ||
SE | 31.08.2011 | ||
SI | 31.08.2011 | ||
GR | 01.12.2011 | ||
IS | 31.12.2011 | ||
Former [2012/09] | FI | 31.08.2011 | |
LT | 31.08.2011 | ||
NL | 31.08.2011 | ||
IS | 31.12.2011 | ||
Former [2012/08] | LT | 31.08.2011 | |
NL | 31.08.2011 | ||
IS | 31.12.2011 | Documents cited: | Search | [A]WO2007001952 (MOTOROLA INC [US], et al) [A] 1-11 * abstract * * paragraphs [0029] - [0034] * * figures 3,4 *; | [A] - "UNIVERSAL MOBILE TELECOMMUNICATIONS SYSTEM (UMTS); FEASIBILITY STUDY FOR EVOLVED UNIVERSAL TERRESTRIAL RADIO ACCESS (UTRA) AND UNIVERSAL TERRESTRIAL RADIO ACCESS NETWORK (UTRAN) (3GPP TR 25.912 VERSION 7.1.0 RELEASE 7)", ETSI STANDARDS, LIS, SOPHIA ANTIPOLIS CEDEX, FRANCE, (20060101), no. V7.1.0, ISSN 0000-0001, pages 1 - 58, XP014035381 [A] 1-11 * paragraphs [09.4] , [13.6] * | [AP] - "Intra E-UTRA Handover", 3RD GENERATION PARTNERSHIP PROJECT (3GPP); TECHNICALSPECIFICATION GROUP (TSG) RADIO ACCESS NETWORK (RAN); WORKINGGROUP 3 (WG3), XX, XX, (20070212), vol. R3-070146, pages 1 - 3, XP003018675 [AP] 1-11 * the whole document * | International search | [X] - "Tunnel movement signalling between eNB and UPE", MOTOROLA, 3GPP TSG SA WG2 ARCHITECTURE - SAE, S2-0643052, (20061114), URL: http://www.3gpp.org/ftp/Specs/html-info/TDocExMtg--S2-ah-26145--26145.htm, XP003018671 | [A] - "Functional split between MME and UPE and impacts on S1 interface definition", SIEMENS, 3GPP TSG RAN WG3 MEETING #54, RIGA, LATVIA, R3-061815, (20061106), URL: http://www.3gpp.org/ftp/Specs/html-info/TDocExMtg--R-3-54-25417.htm, XP003018672 | [A] - "3rd Generation Partnership Project; Technial Specification Group Radio Acces Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 8)", 3GPP TS 36.300 V0.4.0, (200701), URL: http://www.3gpp.org/ftp/Specs/html-info/36300.htm, XP003018673 | [A] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; 3GPP System Architecture Evolution: Report on Technical Options and conclusions (Release 7)", 3GPP TR 23.882 V1.6.1.1, (200611), URL: http://www.3gpp.org/ftp/Specs/html-info/23882.htm, XP003018674 | [XP] - "Intra E-UTRA Handover", ERICSSON, TSG RAN WG3 MEETING #55, R3-070146, ST. LOUIS, MISSOURI, US, (20070212), URL: http://www.3gpp.org/ftp/Specs/html-info/TDocExMtg--R3-55-26001.htm, XP003018675 | by applicant | - "Tunnel movement signalling between eNB and UPE", 3GPP TSG SA WG2 ARCHITECTURE - SAE, pages 2 - 0643052 |