| EP2062060 - MEASURING HEAD AND MEASURING METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.11.2020 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 06.12.2019 | ||
| Former | Grant of patent is intended Status updated on 27.08.2019 | Most recent event Tooltip | 24.06.2022 | Lapse of the patent in a contracting state New state(s): CY, HU, MT | published on 27.07.2022 [2022/30] | Applicant(s) | For all designated states Posiva Oy Olkiluoto 27160 Eurajoki / FI | [2020/02] |
| Former [2009/22] | For all designated states Posiva Oy 27160 Olkiluoto / FI | Inventor(s) | 01 /
ROUHIAINEN, Pekka Soukanniitty 15 A 02360 Espoo / FI | 02 /
HAUTOJÄRVI, Aimo Satamakatu 1a A 7 26100 Rauma / FI | 03 /
AHOKAS, Turo Solvikinkatu 5 C 36 00990 Helsinki / FI | [2019/39] |
| Former [2009/22] | 01 /
ROUHIAINEN, Pekka Soukanniitty 15 A FI-02360 Espoo / FI | ||
| 02 /
HAUTOJÄRVI, Aimo Satamakatu 1a A 7 FI-26100 Rauma / FI | |||
| 03 /
AHOKAS, Turo Solvikinkatu 5 C 36 FI-00990 Helsinki / FI | Representative(s) | Papula Oy P.O. Box 981 00101 Helsinki / FI | [2012/40] |
| Former [2009/22] | Helino, Timo Kalervo, et al Papula Oy Mechelininkatu 1 a 00180 Helsinki / FI | Application number, filing date | 07730591.0 | 08.05.2007 | [2009/22] | WO2007FI00122 | Priority number, date | FI20060000812 | 12.09.2006 Original published format: FI 20060812 | [2009/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008031914 | Date: | 20.03.2008 | Language: | EN | [2008/12] | Type: | A1 Application with search report | No.: | EP2062060 | Date: | 27.05.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.03.2008 takes the place of the publication of the European patent application. | [2009/22] | Type: | B1 Patent specification | No.: | EP2062060 | Date: | 08.01.2020 | Language: | EN | [2020/02] | Search report(s) | International search report - published on: | FI | 20.03.2008 | (Supplementary) European search report - dispatched on: | EP | 23.06.2017 | Classification | IPC: | G01V3/20 | [2017/30] | CPC: |
G01V3/20 (EP,US)
|
| Former IPC [2009/22] | G01R27/00, E21B33/124, G01F1/00, G01V3/00, E21B47/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2020/02] |
| Former [2009/22] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | MESSKOPF UND MESSVERFAHREN | [2009/22] | English: | MEASURING HEAD AND MEASURING METHOD | [2009/22] | French: | TÊTE DE MESURE ET PROCÉDÉ DE MESURE | [2009/22] | Entry into regional phase | 12.03.2009 | National basic fee paid | 12.03.2009 | Search fee paid | 12.03.2009 | Designation fee(s) paid | 12.03.2009 | Examination fee paid | Examination procedure | 12.03.2009 | Examination requested [2009/22] | 27.12.2017 | Amendment by applicant (claims and/or description) | 28.08.2019 | Communication of intention to grant the patent | 28.11.2019 | Fee for grant paid | 28.11.2019 | Fee for publishing/printing paid | 28.11.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.08.2019 | Opposition(s) | 09.10.2020 | No opposition filed within time limit [2020/51] | Fees paid | Renewal fee | 23.03.2009 | Renewal fee patent year 03 | 03.04.2010 | Renewal fee patent year 04 | 04.05.2011 | Renewal fee patent year 05 | 15.05.2012 | Renewal fee patent year 06 | 13.05.2013 | Renewal fee patent year 07 | 13.05.2014 | Renewal fee patent year 08 | 12.05.2015 | Renewal fee patent year 09 | 30.05.2016 | Renewal fee patent year 10 | 18.05.2017 | Renewal fee patent year 11 | 14.03.2018 | Renewal fee patent year 12 | 18.03.2019 | Renewal fee patent year 13 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.05.2007 | AT | 08.01.2020 | CY | 08.01.2020 | DK | 08.01.2020 | EE | 08.01.2020 | ES | 08.01.2020 | IT | 08.01.2020 | LT | 08.01.2020 | LV | 08.01.2020 | MC | 08.01.2020 | MT | 08.01.2020 | NL | 08.01.2020 | PL | 08.01.2020 | RO | 08.01.2020 | SI | 08.01.2020 | SK | 08.01.2020 | TR | 08.01.2020 | BG | 08.04.2020 | GR | 09.04.2020 | IE | 08.05.2020 | IS | 08.05.2020 | LU | 08.05.2020 | BE | 31.05.2020 | PT | 31.05.2020 | [2022/27] |
| Former [2022/26] | AT | 08.01.2020 | |
| DK | 08.01.2020 | ||
| EE | 08.01.2020 | ||
| ES | 08.01.2020 | ||
| IT | 08.01.2020 | ||
| LT | 08.01.2020 | ||
| LV | 08.01.2020 | ||
| MC | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| PL | 08.01.2020 | ||
| RO | 08.01.2020 | ||
| SI | 08.01.2020 | ||
| SK | 08.01.2020 | ||
| TR | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| IE | 08.05.2020 | ||
| IS | 08.05.2020 | ||
| LU | 08.05.2020 | ||
| BE | 31.05.2020 | ||
| PT | 31.05.2020 | ||
| Former [2021/24] | AT | 08.01.2020 | |
| DK | 08.01.2020 | ||
| EE | 08.01.2020 | ||
| ES | 08.01.2020 | ||
| IT | 08.01.2020 | ||
| LT | 08.01.2020 | ||
| LV | 08.01.2020 | ||
| MC | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| PL | 08.01.2020 | ||
| RO | 08.01.2020 | ||
| SI | 08.01.2020 | ||
| SK | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| IE | 08.05.2020 | ||
| IS | 08.05.2020 | ||
| LU | 08.05.2020 | ||
| BE | 31.05.2020 | ||
| PT | 31.05.2020 | ||
| Former [2021/20] | AT | 08.01.2020 | |
| DK | 08.01.2020 | ||
| EE | 08.01.2020 | ||
| ES | 08.01.2020 | ||
| IT | 08.01.2020 | ||
| LT | 08.01.2020 | ||
| LV | 08.01.2020 | ||
| MC | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| PL | 08.01.2020 | ||
| RO | 08.01.2020 | ||
| SI | 08.01.2020 | ||
| SK | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| IE | 08.05.2020 | ||
| IS | 08.05.2020 | ||
| LU | 08.05.2020 | ||
| PT | 31.05.2020 | ||
| Former [2021/15] | AT | 08.01.2020 | |
| DK | 08.01.2020 | ||
| EE | 08.01.2020 | ||
| ES | 08.01.2020 | ||
| IT | 08.01.2020 | ||
| LT | 08.01.2020 | ||
| LV | 08.01.2020 | ||
| MC | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| PL | 08.01.2020 | ||
| RO | 08.01.2020 | ||
| SI | 08.01.2020 | ||
| SK | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| IS | 08.05.2020 | ||
| LU | 08.05.2020 | ||
| PT | 31.05.2020 | ||
| Former [2021/10] | AT | 08.01.2020 | |
| DK | 08.01.2020 | ||
| EE | 08.01.2020 | ||
| ES | 08.01.2020 | ||
| IT | 08.01.2020 | ||
| LT | 08.01.2020 | ||
| LV | 08.01.2020 | ||
| MC | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| PL | 08.01.2020 | ||
| RO | 08.01.2020 | ||
| SI | 08.01.2020 | ||
| SK | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| IS | 08.05.2020 | ||
| PT | 31.05.2020 | ||
| Former [2020/50] | DK | 08.01.2020 | |
| EE | 08.01.2020 | ||
| ES | 08.01.2020 | ||
| LT | 08.01.2020 | ||
| LV | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| RO | 08.01.2020 | ||
| SK | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| IS | 08.05.2020 | ||
| PT | 31.05.2020 | ||
| Former [2020/49] | DK | 08.01.2020 | |
| ES | 08.01.2020 | ||
| LT | 08.01.2020 | ||
| LV | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| RO | 08.01.2020 | ||
| SK | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| IS | 08.05.2020 | ||
| PT | 31.05.2020 | ||
| Former [2020/48] | DK | 08.01.2020 | |
| ES | 08.01.2020 | ||
| LT | 08.01.2020 | ||
| LV | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| RO | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| IS | 08.05.2020 | ||
| PT | 31.05.2020 | ||
| Former [2020/47] | DK | 08.01.2020 | |
| ES | 08.01.2020 | ||
| LT | 08.01.2020 | ||
| LV | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| IS | 08.05.2020 | ||
| PT | 31.05.2020 | ||
| Former [2020/40] | LT | 08.01.2020 | |
| LV | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| IS | 08.05.2020 | ||
| PT | 31.05.2020 | ||
| Former [2020/39] | LT | 08.01.2020 | |
| LV | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| BG | 08.04.2020 | ||
| GR | 09.04.2020 | ||
| PT | 31.05.2020 | ||
| Former [2020/38] | LT | 08.01.2020 | |
| LV | 08.01.2020 | ||
| NL | 08.01.2020 | ||
| GR | 09.04.2020 | ||
| PT | 31.05.2020 | ||
| Former [2020/36] | LT | 08.01.2020 | |
| NL | 08.01.2020 | ||
| PT | 31.05.2020 | ||
| Former [2020/35] | LT | 08.01.2020 | |
| NL | 08.01.2020 | ||
| Former [2020/33] | NL | 08.01.2020 | Documents cited: | Search | [XY] US2001033164 (VINEGAR HAROLD J et al.) [X] 1,6 * abstract * * paragraphs [0006] , [0037] , [0038] , [0043] *[Y] 2-5 | [XI] JPH05346017 (KYOKADO ENG CO et al.) [X] 1 * abstract * * paragraphs [0001] , [0010] - [0021] *[I] 2,4,5 | [X] US3882376 (SCHUSTER NICK A et al.) [X] 1,6 * abstract * * column 13, line 61 - column 14, line 44 * | [Y] US2874347 (SOUTHWICK PETER F et al.) [Y] 1-5 * abstract * | [Y] US5804714 (ROUHIAINEN PEKKA et al.) [Y] 1-5 * abstract * * column 2, lines 46-58 * | [A] US6581455 (BERGER PER-ERIK et al.) [A] 1-6 * abstract * * column 3, line 58 - column 4, line 28 * * column 8, lines 1-21 * | [A] US2669689 (HENRI-GEORGES DOLL et al.) [A] 1-6 * column 5, lines 35-47 * | [A] US2852734 (JOSENDAL VIRGIL A et al.) [A] 1-6 * column 3, line 66 - column 4, line 49; figure 2 * | International search | [Y] US2712629 (HENRI-GEORGES DOLL et al.) | [Y] US3521154 (MARICELLI JAMES J et al.) | [Y] US5804714 (ROUHIAINEN PEKKA et al.) | [Y] US4803874 (MARRAST JACQUES et al.) | [Y] US5831156 (MULLINS ALBERT AUGUSTUS et al.) | by applicant | US2001033164 | JPH05346017 | US3882376 | US2874347 | US5804714 |