| EP2018692 - AN ENCLOSURE WITH A LEAD-THROUGH AND A GROMMET [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.05.2014 Database last updated on 14.03.2026 | Most recent event Tooltip | 15.07.2016 | Lapse of the patent in a contracting state New state(s): TR | published on 17.08.2016 [2016/33] | Applicant(s) | For all designated states Ensto Finland Oy PL 77 06101 Porvoo / FI | [2011/41] |
| Former [2009/05] | For all designated states Ensto Control OY P.O. Box 77 06101 Porvoo / FI | Inventor(s) | 01 /
MÄKELÄ, Keijo Ankkurinvarsi 12 F 12 02320 Espoo / FI | 02 /
TUOMISTO, Timo Jaanankuja 8 A 00760 Helsinki / FI | 03 /
MATTILA, Reijo Katrintie 26 01400 Vantaa / FI | [2009/05] | Representative(s) | Berggren Oy, Helsinki & Oulu P.O. Box 16 Eteläinen Rautatiekatu 10A 00101 Helsinki / FI | [N/P] |
| Former [2013/24] | Berggren Oy Ab P.O. Box 16 Antinkatu 3 C 00101 Helsinki / FI | ||
| Former [2009/05] | Heikkinen, Esko Juhani Berggren Oy Ab P.O. Box 16 00101 Helsinki / FI | Application number, filing date | 07730600.9 | 15.05.2007 | [2009/05] | WO2007FI00131 | Priority number, date | FI20060000477 | 15.05.2006 Original published format: FI 20060477 | [2009/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2007132059 | Date: | 22.11.2007 | Language: | EN | [2007/47] | Type: | A1 Application with search report | No.: | EP2018692 | Date: | 28.01.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.11.2007 takes the place of the publication of the European patent application. | [2009/05] | Type: | B1 Patent specification | No.: | EP2018692 | Date: | 26.06.2013 | Language: | EN | [2013/26] | Search report(s) | International search report - published on: | EP | 22.11.2007 | Classification | IPC: | H02G3/06, H02G3/08 | [2009/05] | CPC: |
H02G3/0658 (EP,US);
H02G3/08 (FI);
H02G3/088 (EP,US);
H02G3/22 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2009/05] | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | EIN GEHÄUSE MIT DURCHFÜHRUNG UND ABDICHTUNGSVORRICHTUNG | [2013/08] | English: | AN ENCLOSURE WITH A LEAD-THROUGH AND A GROMMET | [2009/05] | French: | BOÎTIER AVEC UNE TRAVERSÉE DE CLOISON ET UNE BAGUE D'ÉTOUPE | [2009/05] |
| Former [2009/05] | GEHÄUSE MIT DURCHGANGSLEITUNG UND DURCHFÜHRUNGSHÜLSE | Entry into regional phase | 16.10.2008 | National basic fee paid | 16.10.2008 | Designation fee(s) paid | 16.10.2008 | Examination fee paid | Examination procedure | 14.03.2008 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 16.10.2008 | Examination requested [2009/05] | 23.01.2013 | Communication of intention to grant the patent | 18.04.2013 | Fee for grant paid | 18.04.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.01.2013 | Opposition(s) | 27.03.2014 | No opposition filed within time limit [2014/23] | Fees paid | Renewal fee | 26.05.2009 | Renewal fee patent year 03 | 24.05.2010 | Renewal fee patent year 04 | 20.05.2011 | Renewal fee patent year 05 | 30.03.2012 | Renewal fee patent year 06 | 15.05.2013 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.05.2007 | AT | 26.06.2013 | BE | 26.06.2013 | CY | 26.06.2013 | CZ | 26.06.2013 | DK | 26.06.2013 | EE | 26.06.2013 | FI | 26.06.2013 | LT | 26.06.2013 | LV | 26.06.2013 | MC | 26.06.2013 | MT | 26.06.2013 | NL | 26.06.2013 | PL | 26.06.2013 | RO | 26.06.2013 | SE | 26.06.2013 | SI | 26.06.2013 | SK | 26.06.2013 | TR | 26.06.2013 | BG | 26.09.2013 | GR | 27.09.2013 | ES | 07.10.2013 | IS | 26.10.2013 | PT | 28.10.2013 | [2016/33] |
| Former [2016/32] | HU | 15.05.2007 | |
| AT | 26.06.2013 | ||
| BE | 26.06.2013 | ||
| CY | 26.06.2013 | ||
| CZ | 26.06.2013 | ||
| DK | 26.06.2013 | ||
| EE | 26.06.2013 | ||
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| MC | 26.06.2013 | ||
| MT | 26.06.2013 | ||
| NL | 26.06.2013 | ||
| PL | 26.06.2013 | ||
| RO | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| SK | 26.06.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| ES | 07.10.2013 | ||
| IS | 26.10.2013 | ||
| PT | 28.10.2013 | ||
| Former [2016/16] | AT | 26.06.2013 | |
| BE | 26.06.2013 | ||
| CY | 26.06.2013 | ||
| CZ | 26.06.2013 | ||
| DK | 26.06.2013 | ||
| EE | 26.06.2013 | ||
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| MC | 26.06.2013 | ||
| MT | 26.06.2013 | ||
| NL | 26.06.2013 | ||
| PL | 26.06.2013 | ||
| RO | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| SK | 26.06.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| ES | 07.10.2013 | ||
| IS | 26.10.2013 | ||
| PT | 28.10.2013 | ||
| Former [2015/09] | AT | 26.06.2013 | |
| BE | 26.06.2013 | ||
| CY | 26.06.2013 | ||
| CZ | 26.06.2013 | ||
| DK | 26.06.2013 | ||
| EE | 26.06.2013 | ||
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| MC | 26.06.2013 | ||
| NL | 26.06.2013 | ||
| PL | 26.06.2013 | ||
| RO | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| SK | 26.06.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| ES | 07.10.2013 | ||
| IS | 26.10.2013 | ||
| PT | 28.10.2013 | ||
| Former [2014/21] | AT | 26.06.2013 | |
| BE | 26.06.2013 | ||
| CY | 26.06.2013 | ||
| CZ | 26.06.2013 | ||
| DK | 26.06.2013 | ||
| EE | 26.06.2013 | ||
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| NL | 26.06.2013 | ||
| PL | 26.06.2013 | ||
| RO | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| SK | 26.06.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| ES | 07.10.2013 | ||
| IS | 26.10.2013 | ||
| PT | 28.10.2013 | ||
| Former [2014/18] | AT | 26.06.2013 | |
| BE | 26.06.2013 | ||
| CY | 26.06.2013 | ||
| CZ | 26.06.2013 | ||
| EE | 26.06.2013 | ||
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| NL | 26.06.2013 | ||
| PL | 26.06.2013 | ||
| RO | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| SK | 26.06.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| ES | 07.10.2013 | ||
| IS | 26.10.2013 | ||
| PT | 28.10.2013 | ||
| Former [2014/14] | AT | 26.06.2013 | |
| BE | 26.06.2013 | ||
| CZ | 26.06.2013 | ||
| EE | 26.06.2013 | ||
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| NL | 26.06.2013 | ||
| PL | 26.06.2013 | ||
| RO | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| SK | 26.06.2013 | ||
| CY | 24.07.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| ES | 07.10.2013 | ||
| IS | 26.10.2013 | ||
| PT | 28.10.2013 | ||
| Former [2014/12] | IT | 15.05.2013 | |
| AT | 26.06.2013 | ||
| BE | 26.06.2013 | ||
| CZ | 26.06.2013 | ||
| EE | 26.06.2013 | ||
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| PL | 26.06.2013 | ||
| RO | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| SK | 26.06.2013 | ||
| CY | 24.07.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| ES | 07.10.2013 | ||
| IS | 26.10.2013 | ||
| PT | 28.10.2013 | ||
| Former [2014/11] | IT | 15.05.2013 | |
| AT | 26.06.2013 | ||
| BE | 26.06.2013 | ||
| CZ | 26.06.2013 | ||
| EE | 26.06.2013 | ||
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| PL | 26.06.2013 | ||
| RO | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| SK | 26.06.2013 | ||
| CY | 24.07.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| IS | 26.10.2013 | ||
| PT | 28.10.2013 | ||
| Former [2014/10] | AT | 26.06.2013 | |
| BE | 26.06.2013 | ||
| CZ | 26.06.2013 | ||
| EE | 26.06.2013 | ||
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| SK | 26.06.2013 | ||
| CY | 24.07.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| IS | 26.10.2013 | ||
| PT | 28.10.2013 | ||
| Former [2014/09] | AT | 26.06.2013 | |
| BE | 26.06.2013 | ||
| EE | 26.06.2013 | ||
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| PT | 28.10.2013 | ||
| Former [2014/08] | BE | 26.06.2013 | |
| FI | 26.06.2013 | ||
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| PT | 28.10.2013 | ||
| Former [2014/02] | FI | 26.06.2013 | |
| LT | 26.06.2013 | ||
| LV | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| Former [2013/50] | FI | 26.06.2013 | |
| LT | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| BG | 26.09.2013 | ||
| GR | 27.09.2013 | ||
| Former [2013/49] | FI | 26.06.2013 | |
| LT | 26.06.2013 | ||
| SE | 26.06.2013 | ||
| SI | 26.06.2013 | ||
| GR | 27.09.2013 | ||
| Former [2013/47] | LT | 26.06.2013 | |