blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2142968

EP2142968 - A METHOD FOR THE MANUFACTURING OF A REPRODUCTION OF AN ENCAPSULATED THREE-DIMENSIONAL PHYSICAL OBJECT AND OBJECTS OBTAINED BY THE METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.06.2012
Database last updated on 16.11.2024
Most recent event   Tooltip18.07.2014Lapse of the patent in a contracting state
New state(s): HU
published on 20.08.2014  [2014/34]
Applicant(s)For all designated states
Damvig Develop Future ApS
Kuldyssen 6
2630 Taastrup / DK
[2011/30]
Former [2010/02]For all designated states
Damvig Develop Future Aps
Kuldyssen 6
2630 Taastrup / DK
Inventor(s)01 / DAMVIG, Susanne
Kirkebjerg Vænge 35
DK-2635 Isho̸j Landsby / DK
02 / DAMVIG, Jesper
O̸stre Strandvej 5
DK-2680 Solro̸d Strand / DK
 [2010/02]
Representative(s)Holme Patent A/S
Valbygårdsvej 33
2500 Valby / DK
[N/P]
Former [2010/02]Holme Patent A/S
Vesterbrogade 20
1620 Copenhagen V / DK
Application number, filing date07735556.819.04.2007
[2010/02]
WO2007IB51421
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2008129360
Date:30.10.2008
Language:EN
[2008/44]
Type: A1 Application with search report 
No.:EP2142968
Date:13.01.2010
Language:EN
The application published by WIPO in one of the EPO official languages on 30.10.2008 takes the place of the publication of the European patent application.
[2010/02]
Type: B1 Patent specification 
No.:EP2142968
Date:27.07.2011
Language:EN
[2011/30]
Search report(s)International search report - published on:EP30.10.2008
ClassificationIPC:G05B19/4099
[2010/02]
CPC:
G05B19/4099 (EP,US); B33Y50/00 (EP,US); B33Y80/00 (EP,US);
G05B2219/45169 (EP,US); G05B2219/49008 (EP,US); G05B2219/49019 (EP,US);
Y02P90/02 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2010/02]
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINER REPRODUKTION EINES EINGEKAPSELTEN DREIDIMENSIONALEN PHYSISCHEN OBJEKTS UND DURCH DAS VERFAHREN ERHALTENE OBJEKTE[2010/02]
English:A METHOD FOR THE MANUFACTURING OF A REPRODUCTION OF AN ENCAPSULATED THREE-DIMENSIONAL PHYSICAL OBJECT AND OBJECTS OBTAINED BY THE METHOD[2010/02]
French:PROCÉDÉ DE FABRICATION D'UNE REPRODUCTION D'UN OBJET PHYSIQUE TRIDIMENSIONNEL ENCAPSULÉ ET OBJETS OBTENUS SELON CE PROCÉDÉ[2010/02]
Entry into regional phase19.11.2009National basic fee paid 
19.11.2009Designation fee(s) paid 
19.11.2009Examination fee paid 
Examination procedure23.10.2008Request for preliminary examination filed
International Preliminary Examining Authority: EP
19.11.2009Examination requested  [2010/02]
02.11.2010Communication of intention to grant the patent
28.02.2011Fee for grant paid
28.02.2011Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  02.11.2010
Opposition(s)02.05.2012No opposition filed within time limit [2012/27]
Fees paidRenewal fee
19.11.2009Renewal fee patent year 03
03.05.2010Renewal fee patent year 04
02.05.2011Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.04.2007
AT27.07.2011
CY27.07.2011
CZ27.07.2011
EE27.07.2011
FI27.07.2011
IT27.07.2011
LT27.07.2011
LV27.07.2011
MT27.07.2011
RO27.07.2011
SI27.07.2011
SK27.07.2011
TR27.07.2011
BG27.10.2011
GR28.10.2011
ES07.11.2011
IS27.11.2011
PT28.11.2011
LU19.04.2012
MC30.04.2012
[2014/34]
Former [2014/27]AT27.07.2011
CY27.07.2011
CZ27.07.2011
EE27.07.2011
FI27.07.2011
IT27.07.2011
LT27.07.2011
LV27.07.2011
MT27.07.2011
RO27.07.2011
SI27.07.2011
SK27.07.2011
TR27.07.2011
BG27.10.2011
GR28.10.2011
ES07.11.2011
IS27.11.2011
PT28.11.2011
LU19.04.2012
MC30.04.2012
Former [2014/21]AT27.07.2011
CY27.07.2011
CZ27.07.2011
EE27.07.2011
FI27.07.2011
IT27.07.2011
LT27.07.2011
LV27.07.2011
MT27.07.2011
RO27.07.2011
SI27.07.2011
SK27.07.2011
TR27.07.2011
BG27.10.2011
GR28.10.2011
ES07.11.2011
IS27.11.2011
PT28.11.2011
MC30.04.2012
Former [2013/35]AT27.07.2011
CY27.07.2011
CZ27.07.2011
EE27.07.2011
FI27.07.2011
IT27.07.2011
LT27.07.2011
LV27.07.2011
MT27.07.2011
RO27.07.2011
SI27.07.2011
SK27.07.2011
BG27.10.2011
GR28.10.2011
ES07.11.2011
IS27.11.2011
PT28.11.2011
MC30.04.2012
Former [2013/29]AT27.07.2011
CY27.07.2011
CZ27.07.2011
EE27.07.2011
FI27.07.2011
IT27.07.2011
LT27.07.2011
LV27.07.2011
RO27.07.2011
SI27.07.2011
SK27.07.2011
BG27.10.2011
GR28.10.2011
ES07.11.2011
IS27.11.2011
PT28.11.2011
MC30.04.2012
Former [2013/22]AT27.07.2011
CY27.07.2011
CZ27.07.2011
EE27.07.2011
FI27.07.2011
IT27.07.2011
LT27.07.2011
LV27.07.2011
RO27.07.2011
SI27.07.2011
SK27.07.2011
GR28.10.2011
ES07.11.2011
IS27.11.2011
PT28.11.2011
MC30.04.2012
Former [2012/50]AT27.07.2011
CY27.07.2011
CZ27.07.2011
EE27.07.2011
FI27.07.2011
IT27.07.2011
LT27.07.2011
LV27.07.2011
RO27.07.2011
SI27.07.2011
SK27.07.2011
GR28.10.2011
IS27.11.2011
PT28.11.2011
MC30.04.2012
Former [2012/23]AT27.07.2011
CY27.07.2011
CZ27.07.2011
EE27.07.2011
FI27.07.2011
IT27.07.2011
LT27.07.2011
LV27.07.2011
RO27.07.2011
SI27.07.2011
SK27.07.2011
GR28.10.2011
IS27.11.2011
PT28.11.2011
Former [2012/21]AT27.07.2011
CY27.07.2011
CZ27.07.2011
FI27.07.2011
LT27.07.2011
LV27.07.2011
SI27.07.2011
GR28.10.2011
IS27.11.2011
PT28.11.2011
Former [2012/12]AT27.07.2011
CY27.07.2011
FI27.07.2011
LT27.07.2011
LV27.07.2011
SI27.07.2011
GR28.10.2011
IS27.11.2011
PT28.11.2011
Cited inInternational search[AD]US4821200  (OEBERG KURT [SE]) [AD] 1,10* the whole document *;
 [A]US5741215  (D URSO PAUL STEVEN [AU]) [A] 1-10 * the whole document *;
 [X]US5768134  (SWAELENS BART [BE], et al) [X] 1-10 * the whole document *;
 [X]WO9959106  (ACUSCAPE INTERNATIONAL INC [US], et al) [X] 1-10 * page 3, line 5 - page 6, line 5 * * page 10, line 10 - page 16, line 22 * * page 21, line 4 - page 27, line 20 *;
 [A]US2002123817  (CLASBRUMMEL BERNHARD [DE], et al) [A] 1-10 * the whole document *;
 [AD]US2002138237  (TOPHOLM JAN [DK]) [AD] 1,10 * the whole document *;
 [X]US2005004451  (VILSMEIER STEFAN [AT], et al) [X] 1-10 * the whole document *;
 [A]US6932842  (LITSCHKO PETER [DE], et al) [A] 1-10 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.